Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Academic Projects
Timeline
OfficeManager
PRASHANT RAGHAV

PRASHANT RAGHAV

POST GRADUATE ENGINEER LEADERSHIP TRAINEE

Summary

1.5 Years of experience in working on key construction projects for reputable firms, having emerged as a keen planner, strategist and implementer. Adept at driving construction execution involving forecasting, risk management, planning, and execution; Adapts to challenging environments while ensuring timely deliverables within pre-set cost parameters.

Overview

2
2
years of professional experience
6
6
years of post-secondary education
10
10
Certifications

Work History

POST GRADUATE ENGINEER LEADERSHIP TRAINEE

KEC INTERNATIONAL LTD.
Bargarh, Odisha
09.2021 - Current
  • Sub-bifurcated billing breakup schedule to enhance the cash flow for the company and assigned to handle billing for sub-contractor owing to the in-depth understanding of the project within months of joining.
  • Saved cost in pipeline works and overhead tank by refurbishing non-commissioned ESR and corresponding pipeline by connecting it to WTP in scope. Reduced overhead water tanks to be constructed from 72 to 53 , saving approximately 5.5crores .
  • Availed time extension on basis of delay analysis to demonstrate accountability on part of the client in lieu of delayed drawing approval. Prevented financial implication due to liquidated damages as per contractual damages.
  • Developed micro and baseline schedule for the Water treatment plant, Elevated Service Reservoir, and Pipeline in MS project.
  • Prepared cash flow reports of the project i.e., Expected billing (cash inflow) vs Expected cash outflow to measure the physical and financial progress of the project & generated Cost S-curves.
  • Assessed contracts and ensured contractual compliance by tracking construction timeline and quality of deliverables.
  • Developed resource curves to forecast site resource utilization against plan & productivity reports to monitor critical activities.
  • Integrated schedule with EVM , led delay analysis, defined catch-up plans, and monitored the implementation of catch-up plans.

GET-CIVIL

YFC Projects Pvt. Ltd.
Noida, Uttar Pradesh
01.2018 - 10.2018
  • Led construction for metro Station including Bar Bending Schedule preparation for all types of structures in Elevated metro.
  • Worked across planning, execution, and quality while preparing daily, weekly, and monthly progress reports for schedule.
  • Liaised with external parties to achieve approval for designs, evaluating information from drawings, schedules, and specification.
  • Handled engineering control, providing direction to the workforce and supporting quality control systems to ensure compliance with design and specifications.

Education

PGP - Advanced Construction Management

NICMAR
Pune
07.2019 - 04.2021

B. Tech - Civil Engineering

Dronacharya College of Engineering
Greater Noida
08.2013 - 06.2017

Skills

    Auto-CAD

undefined

Accomplishments

  • Recipient of NICMAR Merit Scholarship in Vth and VIIth trimesters.
  • Manager of Football Team at NICMAR, Pune.
  • Sports Coordinator at Dronacharya College of Engineering, Greater Noida.
  • Captain-Football Team at Dronacharya College of Engineering, Greater Noida.

Certification

Company Valuation and Financial Modelling | Udemy.

Academic Projects

  • Equipment Management using Internet of Things NICMAR, Pune, 2020.
  • An Empirical Investigation of The Stock Market Trends for Infrastructure/Real Estate Companies During Lockdown Period s NICMAR, Pune, 2020.
  • Advance Earthquake Resistance Techniques Dronacharya College of Engineering, Greater Noida 2017.

Timeline

POST GRADUATE ENGINEER LEADERSHIP TRAINEE

KEC INTERNATIONAL LTD.
09.2021 - Current

PGP - Advanced Construction Management

NICMAR
07.2019 - 04.2021

GET-CIVIL

YFC Projects Pvt. Ltd.
01.2018 - 10.2018

B. Tech - Civil Engineering

Dronacharya College of Engineering
08.2013 - 06.2017
PRASHANT RAGHAVPOST GRADUATE ENGINEER LEADERSHIP TRAINEE