Summary
Overview
Work History
Education
Skills
Interests
Training
Disclaimer
Personal Information
Timeline
Generic
Praveen Sharma

Praveen Sharma

Power Distribution Expert
Alwar

Summary

Intend to build a career with leading corporate of Hi-Tech environment with committed and dedicated people, which will help me to explore myself fully and realize my potential to work as a key player in challenging and creative environment.

10+ Year Experience with Electrical HT/ LT Power Distribution, RE Project (DDUGJY, Saubhagya, IPDS,RDSS)& Railway Feeding arrangement, Railway Electrification work. Have excellent analytical, interpersonal and communication skills. Experienced in Execution billing & material reconciliation for client/contractor billing.

Overview

10
10
years of professional experience
4026
4026
years of post-secondary education
2
2
Languages

Work History

Project Manager

M/S SAI ELECTRO PVT LTD.
01.2024 - Current
  • Working as Project Manager project execution for RDSS Project of Replacement of existing 11kv HT Bare Conductor to MVCC (Medium Voltage Covered Conductor) with its Accessories , 11 KV UG Cable work, Feeder Bifurcation ,Load Bifurcation & LT Network Under DGVCL ( Dakshin Gujarat Vij Company Limited) Under RDSS Scheme for the growing energy demand and to increase the capacity and reliability of Power Distribution.
  • Client Liasoning , & Other Utilities Liasoning for smooth work.
  • Procurement of Material for on time delivery of project.
  • Planning for on time completion of Execution work.
  • Making of BOQ from the Survey Drawing.
  • Meeting with Client for better coordination of work.
  • Scheduling for erection work.
  • Arrangement of Contractors/Manpowers for erection work.
  • Making of Client bill as well as Contractor’s Bill.
  • Site visit with client for JMS Verification.
  • Planning & Handling the Engineers, supervisors & Labors for the proper execution work.
  • Co-ordination with Consultant & DGVCL departments for daily operation.
  • Maintain the record for daily Economical progress, and Daily Progress Report.
  • Material Reconciliation of Contractor site wise.
  • Contractor Billing & Making of whole site execution cost for the smart work.

Senior Engineer

M/S Vijai Electricals Limited.
05.2023 - 12.2023
  • Working as Senior Engineer project execution for RDSS Project of Replacement of existing 11kv HT Bare Conductor to MVCC (Medium Voltage Covered Conductor) with its Accessories Under PGVCL ( Paschim Gujarat Vij Company Limited) for the growing energy demand and to increase the capacity and reliability of Power Distribution.
  • Giving Training to the Engineers, Jr. Engineers for survey with GPS Device.
  • Survey of Existing Feeders with GPS device.
  • Planning for on time completion of Survey work.
  • Making of BOQ from the Survey Drawing.
  • Making of Final GPS Dumping Excel file for Making of Auto-cad Drawings.
  • Meeting with Client for better coordination of work.
  • Submission of Feeder wise BOQ & Drawings to the client for Approvals.
  • Site survey verification with PMA Rodic Consultant pvt.ltd.
  • Scheduling for erection work.
  • Arrangement of Contractors/Manpowers for erection work.
  • Making of Client bill as well as Contractor’s Bill.
  • Site visit with client for JMS Verification.
  • Installation of new Feeder Pillar & Service Pillar for LT Line distribution.
  • Planning & Handling the Engineers, supervisors & Labors for the proper execution work.
  • Co-ordination with Consultant & PGVCL departments for daily operation.
  • Maintain the record for daily Economical progress, and Daily Progress Report.
  • Material Reconciliation of Contractor site wise.
  • Contractor Billing & Making of whole site execution cost for the smart work.

Senior Engineer

M/S Vijai Electricals Limited.
12.2022 - 04.2023
  • Working as Senior Engineer project execution for APDRP Project of Replacement of existing 33kv/11kv/LT Overhead Power Distribution Network of 6 nos 33/11kv Sub-Stations of Zone-1 Division of Visakhapatnam City with Underground Power Cable Network Under Package-1 Projects Under World Bank Project under Andhra Pradesh East Power Distribution Company Limited for the growing energy demand and to increase the capacity and reliability of Power Distribution.
  • Project Management work.
  • Understand the value of quality & safety making the sheet for day to day wise activity.
  • Expertise in Cost Cutting.
  • Planning for the different-2 Site for reliable work.
  • Arrangement of Casual Staff as needed for completion on time work.
  • Arrangement of Sub-Contractor.
  • Prepare the fitter & Technician & Lineman for the smooth and safely work.
  • Road Crossing by HDD (horizontal Directional Drilling).
  • Installation of 500kva & 315kva Transformer.
  • Making Site Measurements, JMS for billing purpose.
  • Site visit with client for JMS Verification.
  • Installation of new Feeder Pillar & Service Pillar for LT Line distribution.
  • Planning & Handling the Engineers, supervisors & Labors for the proper execution work.
  • Co-ordination with Consultant & APDCL departments for daily operation.
  • Maintain the record for daily Economical progress, and Daily Progress Report.
  • Material Reconciliation of Contractor site wise.
  • Contractor Billing & Making of whole site execution cost for the smart work.

Senior Planning & Execution Engineer

M/s Nicco Power Projects (L&T Third Party)
12.2020 - 11.2022
  • Working as Senior Planning & Execution Engineer project execution for Western Dedicated Freight Corridor WDFC Projects for the growing energy demand and to increase the capacity and reliability of Railway Feeding Arrangements of 25 kva power distribution. installation of Auxiliary Transformers (AT), Overhead Feeder lineUnderground Cabling by HDD.
  • Making of SLD of the site for the better understood for the execution of work.
  • Understand the value of quality & safety making the sheet for day to day wise activity.
  • Excavation of mast & anchor foundation as well as casting.
  • Planning for the different-2 sites for daily task completion.
  • Erection of Mast by Machinery as well as manually.
  • Prepare the fitter & Technician for the smooth and safely overhead work.
  • Track crossing cable by HDD (Horizontal Directional Drilling).
  • Feeding arrangements setup by installing LA, PI, etc.
  • Making Site Measurements for billing purpose.
  • Site visit with client for verify RFI after completion the site works.
  • Installation of new AT for giving power supply to S &T Hut by installation of ACO Panel.
  • Making of Contractor bill with Verification of site work.
  • Planning & Handling the Engineers, supervisors & Labors for the proper execution work.
  • Co-ordination with Consultant & DFCC departments for daily operation.
  • Maintain the record for daily Economical progress, and Daily Progress Report.
  • Material Reconciliation of Contractor site wise.
  • Contractor Billing.
  • Making of whole site execution cost for the smart work.

Block In charge Project Execution

M/s Ashoka Buildcon Limited
11.2018 - 11.2020
  • Working as Block In charge Project Execution for, Saubhagya Yojna to meet the growing energy demand and to increase the capacity and reliability of distribution networks by installation of Energy meter, Overhead lines HT & LT necessary reinforcement, use of AB cables for LT lines, DTR Installation of 25,63 & 100kva, Energy Meter Installation, Conversion OF Bare conductor with AB Cables etc.
  • Proper Survey of HT Line & LT Line & make appropriate drawings.
  • Prepare BOQ, SLD cluster wise villages.
  • Planning for Block village wise & material arrangement.
  • Erection of 8.5 mtr, PCC Pole, 11 mtr STP.
  • Erection of new 11 KV Line using ACSR weasel & Rabbit conductor.
  • Erection of new16 KVA,25 KVA,63 KVA 11/0.250 KV 1 phase & 3 Phase Distribution Transformers.
  • Responsible for Erection Work which include Pole Erection, New 11KV Line Erection, New DTR Erection.
  • Cabling done in LT line 1 Phase & 3 Phase using 1x16 & 3x50 Sq mm AB cable in villages.
  • Providing new single-Phase connections to BPL Consumers.
  • Responsible of Billing & material reconciliation & contractor billing as per pole schedule with client v/s Contractor sheet, Village wise consumption.
  • Habitations Charged & taking Charging Permission from Electrical Inspector.
  • Compliance attend given by REC/DVVNL.
  • Villages clear given by RQM & Handed over Village to Client.
  • Doing Execution work with Proper safety Materials.
  • Verification of works carried out daily by the contractor.
  • Planning and Handling Manpower in site.
  • Co-ordination with Consultant & DVVNL departments for daily operation.
  • Maintain the record for daily Economical progress, and Daily Progress Report.
  • Responsible for whole Division Work which include AB cable, Pole Erection, New 11KV Line Erection, New DTR Erection, Dismantling of Existing line, New Meter Erection work etc. Contractor Billing.

Site Engineer

M/s Raj Corporation Limited
03.2017 - 10.2018
  • Working as Site Engineer Project Execution for, DDUGJY (Deen Dayal Upadhaya Grameen Jyoti Yojana)& IPDS Project under DVVNL at District: Farrukhabad ,Uttar Pradesh.
  • Proper Survey of HT Line & LT Line & make appropriate drawings.
  • Prepare BOQ, SLD cluster wise villages.
  • Planning for Block village wise & material arrangement.
  • Erection of 8.5 mtr, PCC Pole, 11 mtr STP.
  • Erection of new 11 KV Line using ACSR weasel & Rabbit conductor.
  • Erection of new16 KVA,25 KVA,63 KVA 11/0.250 KV 1 phase & 3 Phase Distribution Transformers.
  • Responsible for Erection Work which include Pole Erection, New 11KV Line Erection, New DTR Erection.
  • Cabling done in LT line 1 Phase & 3 Phase using 1x16 & 3x50 Sq mm AB cable in villages.
  • Providing new single Phase connections to BPL Consumers.
  • Responsible of Billing & material reconciliation & contractor billing as per pole schedule with client v/s Contractor sheet, Village wise consumption.
  • Habitations Charged & taking Charging Permission from Electrical Inspector.
  • Compliance attend given by REC/DVVNL.
  • Villages clear given by RQM & Handed over Village to Client.
  • Doing Execution work with Proper safety Materials.
  • Verification of works carried out daily by the contractor.
  • Planning and Handling Manpower in site.
  • Co-ordination with Consultant & DVVNL departments for daily operation.
  • Maintain the record for daily Economical progress, and Daily Progress Report.
  • Responsible for whole Division Work which include AB cable, Pole Erection, New 11KV Line Erection, New DTR Erection, Dismantling of Existing line, New Meter Erection work etc. Contractor Billing.

Electrical Engineer

M/s Nicco Power Projects
07.2015 - 02.2017
  • Working as Electrical Engineer Project Execution for Railway Electrification Project under MRVC (Mumbai Railway Vikas Corporation.) of Western Line from Churchgate Railway Station to Virar Raiway Station.
  • Engineering and Design of the Distribution Network involving under- ground distribution Network, with different different sized cables necessary reinforcement of existing system and Distribution system automation.
  • Detail DGPS survey and complete network designing (Underground, overhead, automation) and reinforcement of the distribution system including the design of civil works.
  • Conversion of existing 11 kV and LT overhead distribution system into underground systems (as far as possible the 11 kV will be in Ring Main Configuration).
  • Laying of XLPE Cable of different different size for Power Distribution.
  • Erection of Cable Trays on FOB’s.
  • Erection and commissioning of ATS Panels for distribution Purpose.
  • Railways FOB’s Electrification, Earthing of DG sets etc.
  • The RCC plinths for mounting the DTs, LT feeder panels, service pit, installation of DTs,etc.
  • Undergrounding and laying of HT and LT Power cables and using Trenchless boring methodology. Where trenchless boring (Horizontal drilling) is not possible, with Employers approval open cut trenching shall be used for undergrounding the HT and LT Power cables and Optical fiber.
  • Preparing of survey reports.
  • Monitoring & Supervision on Execution of work with Proper safety Materials.
  • Co-ordination with Consultant & NEA for daily operation.
  • Planning and Handling Manpower in site.
  • Co-ordination with contractors and consumers.
  • Safety measures in site.
  • Documentation& Preparation of Sub Contractor Billing & Estimation.
  • Survey.

Education

B.tech - Electrical

12th -

CBSE Board
Alwar, Rajasthan

Matriculation - undefined

CBSE Board
Alwar, Rajasthan

Skills

Project management

Project planning

Project planning and development

Project tracking

Interests

Listening music
Watching movies
Reading newspaper

Training

Rotor Assembly, BHEL, Haridwar, 45 Days

Disclaimer

I consider myself familiar with Electrical Engineering aspects. I am also confident of my ability to work in a team. I hereby declare that the above information is true and to the best of my Knowledge.

Personal Information

  • Date of Birth: 10/15/94
  • Marital Status: Married

Timeline

Project Manager

M/S SAI ELECTRO PVT LTD.
01.2024 - Current

Senior Engineer

M/S Vijai Electricals Limited.
05.2023 - 12.2023

Senior Engineer

M/S Vijai Electricals Limited.
12.2022 - 04.2023

Senior Planning & Execution Engineer

M/s Nicco Power Projects (L&T Third Party)
12.2020 - 11.2022

Block In charge Project Execution

M/s Ashoka Buildcon Limited
11.2018 - 11.2020

Site Engineer

M/s Raj Corporation Limited
03.2017 - 10.2018

Electrical Engineer

M/s Nicco Power Projects
07.2015 - 02.2017

Matriculation - undefined

CBSE Board

B.tech - Electrical

12th -

CBSE Board
Praveen SharmaPower Distribution Expert