Summary
Overview
Work History
Education
Skills
Hobbies and Interests
Disclaimer
Languages
Personal Information
Timeline
Generic
Pravin Pandurang Mane

Pravin Pandurang Mane

Pune / Total Experience- 10 Yrs.

Summary

Seeking for a relevant qualified position in well recognized organization where my experience and qualifications will be an asset in its profitability.

Overview

10
10
years of professional experience

Work History

Senior Project Engineer

Aecom Ind.Pvt.Ltd.
09.2024 - Current
  • To look after open issues of Rolling stock sub systems like Brake, HVAC
  • Witnessing Type tests, ICD tests, Static test, Routine test
  • Attending Service trials & Testing of trains like CI dynamic, Brake dynamic tests
  • Witnessing FMI’S, Software amendments
  • Witnessing FRACAS issues
  • Attending DRS meetings and working on its MOM
  • Meetings and follow up with client

Project Engineer

Knorr- Bremse Ind. Pvt. Ltd
04.2022 - 08.2024
  • Independently looking after Pune Metro Project pertaining to Brakes & HVAC systems
  • Visual inspection of new arrived Rolling stock from Brake & HVAC point of view
  • Brake- HVAC Software installation
  • HVAC-TCMS, Brake-TCMS Interface testing as per ICD
  • G.C
  • Witness for routine and type test
  • Failure investigation, Brake & HVAC issues in revenue trains
  • HVAC Field modifications implemented
  • Handling team of mechanical and electrical technicians
  • Updating of Excel sheets regarding failures
  • Preparing Service reports & Failure investigation report of failures pertaining to HVAC & Brakes
  • Preparing Project bottlenecks & Project progress report and sending it to head office weekly

Assistant Manager

Reliance Metro Project (MMOPL)
08.2020 - 04.2022
  • Preparation of Daily Reports
  • Responsible for fault troubleshooting & testing of Door system
  • Responsible Door system overhauling & software uploading
  • Responsible for Bogie, pantograph overhauling
  • Responsible for fault identification and troubleshooting of Rolling Stock sub systems & Report preparation
  • Responsible for Planning, Control, and compliance management for trains
  • Downloading & Analyzing technical Fault data and Event record from train control management system
  • Coordinated with Depot Controller/Chief controller (OCC) for availability of schedule maintenance trains and their fitness
  • Conversant with Rolling Stock sub system like Brake System, Propulsion System, Train Air- conditioning, PIS (Passenger Information system)
  • Active participation in meetings with managers regarding preventive and corrective and day to day maintenance plans
  • Assess the manpower requirement for activities and plan maintenance accordingly
  • To ensure continuous improvements by suggesting & implementing various modifications in the Rolling Stock and Vendor Management
  • Advise OCC in tackling online failures on mainline
  • Responsible for carrying out pre–Monsoon Preparation activities
  • Preparation and review daily, weekly, and monthly reports of Rolling Stock Division
  • Maintaining various records of train cleaning like Heavy Cleaning Work (HCW), Light Cleaning works

Rolling Stock Engineer

D.S. ENTERPRISES
02.2019 - 07.2020
  • Company Overview: Mumbai Monorail Project
  • Perform Urgent Repairs on Vehicles to Service by Detecting Faulty Line Replaceable Units
  • Works Independently or Under the Direction of the Manager or Sr
  • Engineer and Within Approved
  • Procedures and Technical Methods to Perform Running Maintenance and Repair of Vehicle
  • Perform in Depth Troubleshooting and Repairs of Mechanical, Pneumatic or Bogie Related Fault on Rolling Stock
  • Responsible of the Maintenance of Monorail System Like Daily, Weekly, Monthly Maintenance as Per Schedule
  • System Experience Against the Preventive and Corrective Maintenance for Rolling Stock Train Sub System Like Door, HVAC System, Propulsion System, Gear Box, Traction Motors with Liquid Cooling System Including Pumps and Radiator
  • Pneumatic System Including Air Compressor and Air Dryers
  • Fault Finding and Rectification While Maintenance of Trains as Well as Revenue Trains
  • Mumbai Monorail Project

Project /Site Engineer

Anupam Industries Ltd.
08.2014 - 02.2019
  • To check and inspect incoming parts of cranes
  • Erection of Bogie wheels weighted 4 tons each done with the help of hydra
  • Erection of Balancers weighted 5 tons is done with the help of Farhana (F-15)
  • Erection of Portal Legs weighted 21 tons is done with the help of suitable capacity Mobile Crane
  • Erection of Portal Beam weighted 25 tons is done with the help of suitable capacity Mobile Crane
  • Erection of Vertical Mast weighted 29 tons is done with the help of suitable capacity mobile crane
  • Erection of Slew bearing weighted 6 tons is done with the help of suitable capacity mobile crane
  • Erection of Machinery Frame weighted 32 tons is done with the help of suitable capacity crane
  • Erection of Main Hoist, Auxiliary Hoist, Panels, and Motors is done with the help of suitable capacity Mobile crane
  • Erection of A- Frame weighed 22 tons is done with the help of suitable capacity crane
  • Erection of jib weighted 28 tons is with the help of suitable capacity crane
  • Besides assembling and erection following other administrative activities are also monitored at site
  • To generate enquiries from various departments of naval dockyard
  • To check and organize Load charts of Mobile cranes required for Crane Erection
  • To interact with client as well as Contractor about Erection work and update accordingly
  • To Plan Hydra and check their load charts
  • To Plan sub-assemblies which are also equally required and important to carry out erection such as Platforms, Stair case etc
  • To Update client Daily, weekly about of Crane parts supply from Gujarat (Anand) main branch
  • To Update the Packing List and inform short supply if any to parent company in order not to delay the erection
  • To manage the manpower at site
  • Also to maintain the records of labor Attendance
  • Managing team of 15 members
  • To follow up for third party Inspections as and when required at site
  • To Prepare Gate Pass Procedure for vehicles coming from Parent Company
  • To prepare daily work report and send it to seniors with site photos

Education

B.E. - Mechanical Engineering

SARASWATI COLLEGE OF ENGINEERING
Mumbai
01.2014

Diploma - Mechanical Engineering

FATHER AGNEL POLYTECHNIC
MUMBAI
01.2010

H.S.C -

ICEL C
MUMBAI
01.2006

S.S.C -

TERNA SCHOOL
MUMBAI
01.2004

Skills

  • Project execution
  • Worksite management
  • Witness of various subsystems of rolling stock
  • Testing and commissioning of rolling stock
  • Type test, routine test, static and dynamic test witness of rolling stock
  • Project management
  • Preventive and breakdown maintenance of rolling stock

Hobbies and Interests

  • Singing
  • Classical Music
  • Travelling
  • Cricket

Disclaimer

I hereby declare that the above-mentioned information is correct and true as per my knowledge.

Languages

  • Marathi
  • Hindi
  • English

Personal Information

  • Date of Birth: 05/01/88
  • Gender: Male
  • Marital Status: Married

Timeline

Senior Project Engineer

Aecom Ind.Pvt.Ltd.
09.2024 - Current

Project Engineer

Knorr- Bremse Ind. Pvt. Ltd
04.2022 - 08.2024

Assistant Manager

Reliance Metro Project (MMOPL)
08.2020 - 04.2022

Rolling Stock Engineer

D.S. ENTERPRISES
02.2019 - 07.2020

Project /Site Engineer

Anupam Industries Ltd.
08.2014 - 02.2019

B.E. - Mechanical Engineering

SARASWATI COLLEGE OF ENGINEERING

Diploma - Mechanical Engineering

FATHER AGNEL POLYTECHNIC

H.S.C -

ICEL C

S.S.C -

TERNA SCHOOL
Pravin Pandurang Mane