Summary
Overview
Work History
Education
Skills
Interests
Training
Disclaimer
AREA OF INTEREST
INTEREST IN MY BRANCH
Additional Information
Timeline
Generic
Prince Kumar

Prince Kumar

Control And Instrumentation Engineer
Aurangabad,Bihar

Summary

To be recognized as an efficient and competent individual having good interpersonal and technical skills. While working in association with professional groups who provide the opportunity for Career Advancement and Professional growth with an intention to be an asset to the company.

Overview

10
10
years of professional experience
2
2
Languages

Work History

Sr.Engineer (Site-Electrical& Electronics)

Melco India Pvt Ltd
BARH
02.2022 - Current
  • Current Project: -Ash Handling System Melco India pvt ltd 3X660 MW Plants at BARH NTPC Super Thermal Power Plant
  • Project: - NTPC BARH 660 MW 3x660 Project Ash Handling System.
  • Site:-ELECTRICAL ENGINEERING and ( C & I )
  • PLC CONTROL ROOM ERECTION & COMMISSIONING WORK
  • ASH HANDLING SYSTEM Deeply involved in day to day project activity and assist to site office supervisors, & of E&I equipment related of Ash Handling system
  • No-load trial run of drives related with Ash Handling system.
  • Installation and testing of earthling grid around AHS building area.
  • Erection, testing and commissioning of instruments of Ash Handling System.
  • Project of Ash Handling System equipment (Bottom Ash Hopper System, Slurry Ash Conveying System, Wet / Dry Fly Ash conveying System, Recovery Water System and HP / LP water system) through PLC.Electrical Equipment.

Engineer (Site-Electrical& Electronics)

MACAWBER BEEKAY (P) LIMITED
10.2015 - 01.2022
  • 1. Project: - DVC Durgapur Thermal Power Plant 210 MW 1x210 Project Ash Handling System.
  • 2. Project: - Baharini Thermal Power Plant 250 MW 2x110 Project SUPERVISION
  • 3.Project:- MPPGCL Thermal Power Plant 1330 MW MILL REJECT HANDLING SYSTEM
  • 4.Projects:- O P Jindal Super Thermal Power Plant DATE 2016 TO 2018(4x600MW)
  • Site:-ELECTRICAL ENGINEERING and ( C & I )
  • PLC CONTROL ROOM ERECTION & COMMISSIONING WORK
  • ASH HANDLING SYSTEM Deeply involved in day to day project activity and assist to site office supervisors, & of E&I equipment related of Ash Handling system
  • No-load trial run of drives related with Ash Handling system.
  • Installation and testing of earthling grid around AHS building area.
  • Erection, testing and commissioning of instruments of Ash Handling System.
  • Project of Ash Handling System equipment (Bottom Ash Hopper System, Slurry Ash Conveying System, Wet / Dry Fly Ash conveying System, Recovery Water System and HP / LP water system) through PLC.Electrical Equipment.

Education

B.Tech - ELECTRICAL&ELECTRONIC ENGINEERING

MAJHIGHIARANI INSTITUTE OF TECH. & SCIENCE
RAYAGADA, ODISHA
01.2015

12TH - undefined

BSEB PATNA
PATNA
01.2010

10th - undefined

BSEB PATNA
PATNA
01.2008

Skills

Microsoft Office [Word, Power Point]

Interests

Playing computer games

Training

Vocational Training in learnt about the bogies repair in a transformer(nabinaghar NTPC , Bihar)

Disclaimer

I hereby confirm that the details furnished above are true to the best of my knowledge and belief. Date-23/08/2022 Prince Kumar

AREA OF INTEREST

RIGHT HOW ARE TWO FIELD DEVELOPING AT RAPID SPEED THEY ARE TRANSMISSION AND PROTECTION

INTEREST IN MY BRANCH

  • Control System
  • Power System
  • Digital Electronics Circuit

Additional Information

Power plant

Timeline

Sr.Engineer (Site-Electrical& Electronics)

Melco India Pvt Ltd
02.2022 - Current

Engineer (Site-Electrical& Electronics)

MACAWBER BEEKAY (P) LIMITED
10.2015 - 01.2022

B.Tech - ELECTRICAL&ELECTRONIC ENGINEERING

MAJHIGHIARANI INSTITUTE OF TECH. & SCIENCE

12TH - undefined

BSEB PATNA

10th - undefined

BSEB PATNA
Prince KumarControl And Instrumentation Engineer