Summary
Overview
Work History
Education
Skills
References
STUDIES AND COURSES
Timeline
Generic

Quilder Antonio Vicuna Subero

Pendleton

Summary

Petroleum engineer with 10 years of experience in the oil industry, performing functions as an integrated drilling engineer and company man in Venezuela with PDVSA (8.5 years), Tomoporo Earth Deep Field (Sub Moporo and Franquera), and in Ecuador with Halliburton PM (1.5 years) in the east of the country, drilling wells in different areas of the region. Extensive experience and knowledge in deep wells construction of +/- 17,500' MD (vertical and inclined), cementation, fluids, shelling, and completion of wells, laying of cement plugs, directional drilling, and rig manager of 2,000 and 3,000 HP rigs, among others.

Overview

21
21
years of professional experience

Work History

Construction Worker, Mechanic, Electrician

Snop Services
NOBLESVILLE
10.2015 - Current
  • Worked productively as lead or helping team member to drive customer satisfaction.
  • Repaired damaged surfaces including drywall, plaster or other wall finishes.
  • Coordinated phases of construction projects from inception to completion.
  • Assisted with diverse construction challenges to help team and customer.
  • Provided advice on design ideas for a variety of home remodeling projects based on customer preferences.
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Performed troubleshooting and diagnostic procedures to locate source of malfunctions.
  • Inspected, serviced, and repaired brakes, exhaust systems, transmissions, engines, suspension systems, drive trains, fuel systems and other vehicle components as required.
  • Planned layout and installation of wiring and fixtures based on project specifications and building codes.
  • Used power construction equipment, measuring devices and testing equipment to complete electrical installations.
  • Performed pipe fabrication, installation and fitting according to proper specifications.
  • Tested piping systems with water and air pressure to maintain balance and accuracy.

Petroleum Engineer

PDVSA,Tomoporo Earth Deep Field, Halliburton PM
Maracaibo
08.2004 - 05.2015
  • Develop operational considerations (curves of mud, analysis of wells of correlation, potential risks, estimation of time, and cost) and materials requirements.
  • Follow up on the implementation of the construction of the well operations, and ensure compliance with program specifications, resources, and preset times.
  • Coordinate logistics for the execution of the construction of the well operations with companies.
  • Assess the results of the application of new technologies (tools, equipment, and techniques) to present report results.
  • Cost control of drilling through the development of the disbursement and depth and time profile, submitting periodic management results, and requesting revisions in case of deviations.
  • Oversee the operations of runs of casing, cementation, tests of integrity, and fluids.
  • Monitoring and analyzing the parameters of drilling during the construction of the well.
  • Display and application of new technologies and best practices in drilling.
  • Ensure compliance with the applicable safety and environmental regulations.

Education

Bachelor of Science - Petroleum Engineering, DRILLING AND COMPLETIONS

Universidad Del Zulia
Maracaibo, Venezuela
06-2003

Skills

  • Project management
  • Equipment maintenance
  • Construction safety
  • Material estimation
  • Drywall repair
  • Power tool operation
  • Responsible and proactive, based on the completion of the planned projects
  • ability to work in a team and under pressure
  • Expertise level of experience in the management of drilling software used for the monitoring of drilling operations: WellPlan, Compass, and Dim's for Windows
  • Experience in the organization and logistics of equipment and tools to be used in time, and experience in monitoring and execution of drilling parameters
  • Experience in drilling inclined boreholes, running casing, cementing, and completion of wells
  • Available transfer
  • Under the applications office software domain
  • English (reading and writing) basic level, conversational, not fluid

References

  • Engineer Ruben Suarez
    Position: Senior Well Engineer
    Company: Halliburton PM (Ecuador)
    Phones: +593-992564516
    e-Mail: ruben.Suarez@halliburton.com
  • Engineer José Telles
    Senior Well Engineer
    Schlumberger (Ecuador)
    +593-993754369
    Jrondon5@slb.com\
  • Engineer Gilmer Moreno
    The CCPTR Drilling Specialist
    (Villa Hermosa – México)
    Petrolink Services Inc
    +521-9932606928m gilmercito.moreno@gmail.com

STUDIES AND COURSES

  • WELL CONTROL (SUPERVISORY, CI-PACP-S-S)
    Title: International certification in prevention of onslaught and Control wells
    Level: Supervisory.
    Period: May 2014. Completed (duration: May 2014 - May 2016)
  • IFP SCHOOL (IFP)
    Title: Graduate Diploma of Petroleum Studies in Drilling and Completions Engineer
    Level: Diploma.
    Period: April 2010 – November 2010. Completed
  • LA UNIVERSIDAD DEL ZULIA (LUZ)
    Title: Petroleum Engineer
    Level: Professional.
    Period: April 1998 – July 2003. Completed
  • INDUSTRIAL TECHNICAL SCHOOL OF MARACAIBO
    Title: Technical Bachelor degree in Industrial Chemistry
    Level: High school.
    Period: October 1991 - July 1997. Completed
  • PDVSA WEST
    Course: Training of facilitators
    Period: July 2010
  • PDVSA
    Course: Safety, the hygiene and the environment in the industry. MODULE C: SUPERVISORY
    Period: May 2008
  • LANDMARK / HALLIBURTON
    Course: Use and management of the COMPASS program
    Period: May 2007
  • WELL CONTROL SCHOOL
    Course: Prevention of stuck pipe
    Period: March 2007
  • PDVSA
    Course: Horizontal Multilateral and extended reach drilling
    Period: January 2007
  • BAKER HUGHES
    Course: Optimization of drilling
    Period: October 2006
  • WELL CONTROL SCHOOL
    Course: Wells Control (complete - drilling - Supervisor)
    Period: July 2006
  • HYDRIL
    Course: Well Design
    Period: September 2005
  • PDVSA
    Course: Drilling Fluids
    Period: April 2005
  • PDVSA
    Course: preventive driver period: January 2005
  • PDVSA-CIED
    Course: Geological maps of the subsoil
    Period: August 2000
  • LUZ (La Universidad del Zulia)
    Course: An overview of the Natural Gas, separators and Gas fractionation
    Period: July 1999

Timeline

Construction Worker, Mechanic, Electrician

Snop Services
10.2015 - Current

Petroleum Engineer

PDVSA,Tomoporo Earth Deep Field, Halliburton PM
08.2004 - 05.2015

Bachelor of Science - Petroleum Engineering, DRILLING AND COMPLETIONS

Universidad Del Zulia
Quilder Antonio Vicuna Subero