Summary
Overview
Work History
Education
Skills
Software
Work Availability
Quote
Timeline
Manager
RABIN KRISHNA.P

RABIN KRISHNA.P

ENGINEER CONTROL CENTRE OPERATIONS
DAHEJ,India

Summary

Meticulous Mechatronics Engineer with 8 years of experience. Expert in Pipeline O&M and Mechanical Construction engineering with proven history of planning innovative projects from start to finish. Known for great attention to detail and solutions-oriented problem-solving.

Overview

3
3
Languages
16
16
years of post-secondary education
8
8
years of professional experience

Work History

Engineer Operations Control Centre

RELIANCE ETHANE PIPELINE LIMITED (Dahej Nagothane Ethane Pipeline Limited)
DAHEJ, 392001
04.2019 - Current
  • Recruited to monitor and control liquid ethane transportation through pipeline and observation of parameters normality for smooth operations to achieve zero process disturbances and to meet the schedule.
  • Daily inventory calculations of pipeline product and analysis with backup teams and measurement management in order to ensure the flow loses are within the permissible range.
  • Initiate maintenance requests / malfunction notifications in SAP for all routine, non-routine and emergency repairs.
  • Monitor the progress of the maintenance work carried out on operating, shutdown and start up units.
  • Approve work permits for maintenance related activities as per PTW (Permit to work) procedure.
  • Play active role during Turnaround to safely handover the unit to maintenance, safely replace the catalyst of the reactors and safe start-up after completion.
  • Lead a team of operating personnel in shift.
  • Ensure all operating personnel of his shift crew are available.
  • Utilizes available resources to reduce overtime generation.
  • Read all logs and instructions from previous shift and all future requirements with respect to production planning.
  • Responsible for proper shift handover &taking over and follow up of the ongoing jobs.
  • Monitor and manage real time pipeline simulation software to estimate the flow and leak detection.
  • Monitor and manage the measurement accuracy and product quality problems and M&R related alarms.
  • Trained new members for the safety standard procedures for handling petroleum through proper protective equipment’s.
  • Assist in statutory and regulatory compliance.
  • Ensue adherence to emergency response and disaster management plan.
  • Responsible for the overall improvement and performance of pump station, pipeline and metering and regulating stations through quality objectives.
  • Monitor alarms from all running and non-running equipment’s and systems, analyses and take corrective action/communication with field teams.
  • Monitor protection and performance parameters of all running pump units/stations, metering stations and other facilities.
  • Support field operations team to resolve operational issues and maintaining the integrity of the pipeline.
  • Preparation of various MIS reports of pipeline operation Centre as per OMS requirement (daily weekly, monthly) related analysis, preventive/corrective actions and plans.
  • Preparation and validation of all required documentations as per functional package, including SOPs/SMPs/Checklists.
  • Ensure and entering of all relevant information of daily activities in the E logbook on daily basis and are maintained for future reference.
  • Inspection of process parameters as per schedule and monitor utility consumptions.
  • Monitoring trends of critical parameters to identify impending abnormalities and resolving for smooth and safe operations.
  • P&ID and PFD’s revising and maintaining for plant layout design modifications.
  • Manage system line pack to match Gas Receipt and Delivery profiles.
  • Co-ordinate with field operations for all planned / unplanned maintenance activities and approve permit to work after assessing the reliability of operation.
  • Monitoring healthiness of running and stand by equipment’s and systems.
  • Generate and release POC MIS reports in prescribed format.
  • Interact with all interconnect pipeline control-rooms and direct customers on day to day basis.
  • Coordination with upstream customers and receiving stations for scheduled and planned delivery basis.
  • Coordination with Maintenance departments for PM jobs.
  • Conducting mock drills and analyzing the scenarios for emergency handling situations.
  • Coordination with maintenance team for PIG launching and receiving.
  • Coordination with Upstream plant for daily receipt and flow normalization and process parameters.
  • Ensure that all activities in area of control comply with HSE standards and procedures.
  • Maintaining Long term isolation register, bypass register and Key cabinets for LO/LC keys.
  • Ensuring approval is in place before any deviations to SOP, Operating procedures and HSE procedures are executed.
  • Performing emergency functions by taking actions to avoid escalation of emergency events and support emergency response.
  • Control work in process and control area ensuring all work are safe in accordance with standards.
  • Carry out gas,venting,nitrogen purging activities in a safe and effective manner and in accordance with operating procedures and within design limits and established parameters as and when required.
  • Maintain pipeline Log of all events occurring in the specific pipeline and its related facilities and equipment’s.
  • Lead and participate in risk assessments and lead pre job safety meeting.
  • Developed and maintained courteous and effective working relationships.
  • Trained new workers on safety procedures and protocols and enforced implementation throughout workdays to prevent injuries or downtime incidents.
  • Stayed calm and focused in emergency situations to provide efficient fixes for diverse mechanical problems.
  • Observed and tracked information from gauges, instruments and meters to proactively identify and address issues.
  • Observed production operations, identified safety hazards and addressed problems to maintain safety for all personnel.
  • Performed duties in accordance with all applicable standards, policies and regulatory guidelines to promote safe working environment.
  • Adhered to social distancing protocols and wore mask or face shield at all times.

Field Engineer Operations

AARVI ENCON LIMITED, Client :Hindustan Petroleum Corporation Limited (VVSPL)
VIJAYAWADA, ANDHRA PRADESH
06.2016 - 07.2019
  • Recruited to monitor the petroleum products distribution activities from refinery dispatch station to various booster stations (upstream and downstream).
  • Responsible to take receipt products, sending product samples to the lab for testing and doing accounting tasks.
  • Involve in the operation of plants equipment’s and reporting to superiors.
  • Administered fuel to aircraft aviation helicopters, stationary equipment while maintaining, gauging and accounting for mass accounts.
  • Trained new members for the safety standard procedures for handling petroleum through proper protective equipment’s.
  • Supervised the receipt of and storage for bulk or packaged petroleum products.
  • Maintaining 100%accident and incident free record.
  • Performed fueling safely and efficiently and maintaining effective records of fuel transactions in operation log book and in other records.
  • Upkeep of base and maintaining of all equipment based activities.
  • Accurately and efficiently issue and dispense bulk fuels and water from storage tank and distribution facilities to appropriate units for use.
  • Monitor and document maintenance issues related to mechanical machineries.
  • Supervising the smooth operation of the mechanical equipment’s and make sure all safety precautions to be taken.
  • Recruited to maintaining audit related documents and data (IMS and OSID audit) collections For smooth and safe operations of mechanical equipment’s like centrifugal pumps, cartridge filters, inlet MOV and its weekly trouble shoot analysis and maintenance.
  • Pipeline integrity monitoring activities by using simulation software's and PIG receiving as well as launching activities.
  • Monitoring centrifugal pumps, Flow control valves, and Booster pumps.
  • Responsible for all control room activities by setting up of Long-term contractors and specialist vendors in order to meet team goals and objective as defined in the business plan and operational excellence principles.
  • Coordination for all the CSR activities and ROU (right of use) Management.
  • Determined root cause and provided corrective action to prevent future failures through investigation and analysis.

Mechanical Engineer Projects

Hajee AP Bhava&Co Constructions Limited Client:JK Lakshmi cement&UltraTech Cement
Udaipur , Rajasthan
09.2012 - 09.2015
  • Giving technical support to onsite activities and assure that the correct components and procedures are followed to ensure quality.
  • Provided mechanical engineering expertise and technical advice to other members.
  • Preparation of estimates for mechanical engineering records.
  • Maintain good client relation throughout the projects.
  • Built a database for mechanical equipment’s.
  • Drawing verification and analysis for the site supervisors Provided mechanical engineering support for a new project of clinker cooler (erection and commissioning).
  • Successfully completed kiln shell erection and girth gear replacement including alignment of the pinion and gear.
  • Recruited for the supervision of fabricated steel structures like Tertiary air ducts and ESP Co-ordination of all the activities with client/contractors/sub-contractors for smooth progress.
  • Visual inspection of the fabricated ducts chutes structures welding (ARC AND MIG).
  • Developed engineering plans specifications and bid documents.
  • Conducted research and gathered key information for use in upcoming project planning.
  • Monitored premises, screened visitors, updated logs and issued passes to maintain security.
  • Managed multiple projects simultaneously using organizational and analytical skills.
  • Interacted with customers professionally by phone, email or in-person to provide information and directed to desired staff members.
  • Prepared diagrams, charts and surveys showing information about job locations and project scopes.
  • Managed construction equipment maintenance to minimize costs and avoid project disruption.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Conducted project site visits to meet with construction staff, evaluate progress and discuss operational issues.
  • Developed internal processes and plans for mechanical verification, product development and factory processes.
  • Designed and oversaw installation of conveyors, overhead cranes.

Education

Bachelor of Engineering - Mechatronics

KSR College Of Technology
Tamilnadu
07.2008 - 05.2012

PLUS TWO KERALA STATE BOARD - HSC

M.E.T.E.M.H.S.S
KERALA
07.2006 - 05.2008

S.S.L.C - Basic School

Sabari HSS Pallikurup
KERALA
05.1996 - 05.2006

Skills

Self-motivatedundefined

Software

SAP

PAS

SCADA

PIDS

MS OFFICE TOOLS

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

The way to get started is to quit talking and begin doing.
Walt Disney

Timeline

Engineer Operations Control Centre

RELIANCE ETHANE PIPELINE LIMITED (Dahej Nagothane Ethane Pipeline Limited)
04.2019 - Current

Field Engineer Operations

AARVI ENCON LIMITED, Client :Hindustan Petroleum Corporation Limited (VVSPL)
06.2016 - 07.2019

Mechanical Engineer Projects

Hajee AP Bhava&Co Constructions Limited Client:JK Lakshmi cement&UltraTech Cement
09.2012 - 09.2015

Bachelor of Engineering - Mechatronics

KSR College Of Technology
07.2008 - 05.2012

PLUS TWO KERALA STATE BOARD - HSC

M.E.T.E.M.H.S.S
07.2006 - 05.2008

S.S.L.C - Basic School

Sabari HSS Pallikurup
05.1996 - 05.2006
RABIN KRISHNA.PENGINEER CONTROL CENTRE OPERATIONS