To lead a team in which each team member proud to belong .In addition to implement the system, this would ensure customers satisfaction with in the time limit
Overview
23
23
years of professional experience
7
7
Certifications
6
6
Languages
Work History
Engineering Manager
Dolphin Radiators And Cooling Systems LLC(Member of Dolphin Group)
02.2021 - 03.2025
Company Industry: Industrial Production
Job Role: Engineering
Design and Planning Engineer
Newline Steel Engineering Qatar
02.2019 - 01.2021
Job Role: Engineering
O Manufactured Single Wall Tank and Double Wall tank for Under Ground (UL 1746) and Above Ground (UL 142) under the Underwriters Laboratories(UL)
O Managerially and Technically assisted in Petrol Station Projects and participated in West Bay Petrol Station, Salwa Petrol Station, Abunalkla Petrol Station, Alwataniya Petrol Station and Aziz Petrol Station
O Assessed, Planned and Executed multiple projects for Qatar Gas, Materials Qatar site and Power, WQOOD, Smeed Readymix, Aamal Cement, Qatar Primary Company,Petro white Company and Qatar Tractor Company etc.
O Lead pipeline and structural project in ROC/Qatar Oxygen
O Quality International Sharjah U.A.E- Oil and Gas project-Surveyed pressure Vessels including piping, platforms, handrail, staircase structures.
O Stork International Gas Piping project-Surveyed, planned and executed the piping, Pipe spools, piping supportsand pressure vessel works.
O Gulf Heavy Industries pipelines UAE-Estimated,planned and executed Sandblasting,painting and welding of 16” CS pipeline and Fabricated installed piping inside the skid.
O Maritime Industrial services Arabia company ltd Saudi Arabia-Executed the project site of fabrication installation and welding of vessel internals and saddles etc.
O IBN ZAHAR Shutdown, ALJubail Saudi Arabia- project engineer-Leaded team of work force to complete scheduled work in predetermined time.
O Jubail Chemical Industries CompanyJubail Saudi Arabia-Project Engineer -Estimated and executed the desalination plant piping and steel supports work at site.
O Obeikan Factory SiteYanbu Saudi Arabia-Estimated, surveyed and executed the Nitrogen, Potable, and HVAC piping works.
O NOCIL INDIA Project New Mumbai India-Estimated various Chemical vessels, reaction vessels, Piping and structures for different project.
O CABOT Samnar LTD/ChemplastSamnar LtdMettur India-Surveyed and Estimated Ammonia recovery column’s, Pressure vessels, Heat Exchangers, Reaction Column’s and API Tanks
O TOYO Engineering Project Mumbai India-Assisted for surveying and executed the project of different types of heat exchangers.
O DALAL Engineers Thana India-Factory In charge-Responsible for every work carried out inside the factory- Manufacturer of rotary dryer, precession equipment’s, structure’s, Heat exchanger’s, machine parts etc.
O Tapas 3 & 4 Tarapur,Boiser Thana India-Supervisor of Large diameter tank fabrication and erection at site.
Deign and Estimation Engineer
Trend Industries
04.2015 - 07.2017
Company Industry: Industrial Production
Job Role: Engineering
Reported to Executive Director.
Prepared Estimation according client enquiry drawing
Prepared quotation submitted same to client and superiors.
Surveyed total quantities and priced each quantities required for each project. Recorded and updated changes accordingly within a predetermined time.
Measured client drawing prepared accurate BOM, price and weight chart using Microsoft excel.
Prepared fabrication and machining drawings in AutoCAD.
Ensured availability of raw material and inventory stock with respect to BOM.
Prepared summary of material by feasible material planning using sigma nest software.
Preparing material BOQ and submitted the same material procurement.
Coordinated, followedup, monitored, guided and controlled the production to achieve quality end product
Estimator
Standard Fabrication and Engineering Works/ Metal Works
03.2012 - 02.2014
Company Industry: Heavy Industry & Metallurgy
Job Role: Engineering
Standard Fabrication and Engineering Works
Role: QuantitySurveyor/ Project
Project Engineer
Alrajha al Arabia Company Ltd
11.2010 - 12.2011
Job Role: Engineering
Piping and Structural
Coordinated BOD to achieve company goal
Assisted Chief Estimator by providing man-hour and completion detail of the project
Supervised manpowers and qualities of multiple projectsites like MISA, SADDAF and IBN ZAHR shutdown etc.
Supervised staircase, handrail, landing and its support fabrication and sign board structure fabrication in workshop.
Water and Power Systems Technology
Project Engineer
07.2009 - 05.2010
Job Role: Engineering
Piping and Structural
Estimated for projects. Prepared quotation for the same.
Calculated total man-hours required for the project.
Prepared project schedule bar charts by using Microsoft project tool.
Created bill of materials for the procurement.
Contributed in engineering service functions such as documentation for Engineering Change Notices, Tracking, & Scheduling engineering documentation for open projects
Created new drawings from the existing hand made drawings.
Executed project from start to finish independently by leading technical team to achieve the predetermined schedule.
Coordinated with clients, subcontractors and various suppliers to facilitate smooth flow of project.
Recently completed HVAC piping project atObeikan Glass Factory in Yanbu
Mechanical Engineer
05.2006 - 06.2007
Job Role: Mechanical Engineering
Prepared price, unpriced and commercial bid for various projects.
Estimated the cost for various project. estimated man,machines required for the project.
Prepared fabrication drawings to shop personnel for fabrication .
Prepared vendor list hence evaluated vendor performance in terms of delivery, quality and price of the product.
Working with engineers, managers, and clients to improve productivity.
Creating the product bills of material.
lead the technical team to produce chemical equipment’s,heat exchanger’s, large diameter and thickens tanks,pressure vessels,reaction vessels, column’s and piping of both ss and ms which is used for oil and gas industry and chemical industry as per ASME standard codes and TEMA Standard
Work shop In charge
08.2005 - 01.2006
Job Role: Engineering
Planned, controlled and monitored manpower, machine weekly and day to day basis to achieve production.
Prepared schedule for the various products.
Checked the design drawings, coordinated with design department to take corrective measurement.
Monitored the whole product line from start to finish of the product.
Implemented ABC analysis in stores,by coordinating with stores personnel.
Placed orders to various subcontractors .
Ensuring that all the machinery and equipment is maintained at agreed intervals to eliminate production downtime.
Dealing swiftly and accurately with production delays due to machinery or equipment breakdown.
Recommending methods for improving work efficiency and reducing waste of materials and utilities .
Maintaining tasks list and schedule toward timely completion of projects .
Preparing specifications for purchase of components, materials, and equipment .
Customer Service Executive at Rare & Basics Apparel Group of India Pvt. Ltd.Customer Service Executive at Rare & Basics Apparel Group of India Pvt. Ltd.