Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic

Rahul Deswal

Sr Manager Supply Chain
New Delhi

Summary

Experienced professional with over 10 years in the industry, specializing in Logistics, Strategy consulting & Ammonia plant Operations (Hydrogen Generation). Currently serving as a Senior Manager Logistics at Minimalist , where I lead both international & domestic operations. I hold a degree in Chemical Engineering from IIT BHU and a postgraduate degree from IIM Mumbai.

Overview

13
13
years of professional experience
6
6
years of post-secondary education

Work History

Sr Manager - Logistics

Minimalist ( Hindustan Unilever Subsidiary)
04.2025 - Current

International Logistics

· Managed end-to-end international supply chain operations, overseeing the monthly dispatch of 200,000+ units across 15 countries, ensuring timely delivery and operational efficiency

· Ensured export compliance by validating documentation, verifying accurate product labelling, and managing end-to-end export requirements in accordance with regulatory standards

· Optimized transportation and delivery operations, achieving up to 40% reduction in shipping costs through process improvements and strategic carrier management

· Accelerated turnaround time for Saudi Arabian shipments by 66%, reducing delivery lead time from 30 days to 10 days through process optimization and cross-functional coordination

· Spearheaded SLA adherence by implementing real-time shipment tracking and proactively coordinating with vendors to resolve delays, ensuring timely and cost-effective deliveries across global regions.

Senior Logistics Manager

Pepperfry.com
06.2021 - 12.2024
  • Company Overview: Logistics & Warehousing
  • Managed complete supply chain operations with a team size of 40+ roll & 100 + off-roll members for the North Region
  • Spearheaded the operations including but not limited to Warehousing, Distribution, Order Fulfillment, 3PL management and Reverse logistics
  • Managed external stakeholders like 3PL Delivery partners/vendors and customers to ensure excellent customer service and lower overall cost to serve
  • Program Managed the Pan India Studio Replenishment activity in coordination with Central & Regional Teams
  • Strategized the expansion in North through the set-up 1.5 Lakh Sq ft Warehouse in Gurgaon to reduces the delivery timelines.
  • Developed and executed distribution strategies to optimize the flow of finished products from the warehouse to customer locations, achieving an SLA of 95% to committed delivery timelines
  • Implemented strategic Network Planning and Optimization initiatives, reducing overall delivery timelines by 5 days (from 13 to 8), enhancing operational efficiency.
  • Managed delivery & installation of 6k Furniture/Month across North with a fleet of 50 trucks & 25 Carpenter
  • Optimized the operations through capacity planning & reduced contract Manpower in the Region from 250 to 150 by restructuring the job flow to save 1.5 Cr annually
  • Executed strategic cost control initiatives, achieving a 25% reduction in regional expenses, resulting in estimated monthly savings of 25 Lacs.
  • Engaging Merchants to improve OTIF & Fill Rates across warehouses, to decrease Delivery Lead Times.
  • Optimized the Long-Haul Movement process by conducting a Reverse Auction, resulting in a 4% cost savings.
  • Managing Pan India Fleet of 300+ vehicles used in Last mile deliveries & monthly Monitoring of Performance.
  • Responsible for managing the deployment of Furniture stock at Gurgaon WH basis the sales forecast received from the S&OP team.
  • Strategized and launched the Distributed Inventory Plan, ensuring successful on-ground execution by capturing 50% of Build-to Stock regional sales from local warehouses.
  • Monthly review of inventory levels (Bought out & Hybrid) based on the S&OP forecast to achieve the accuracy level of 99%
  • Responsible for inventory management & conduct periodic Inventory Audits & Reconciliation across Pan India Studios, Merchants & Warehouse
  • Hands on experience in Warehouse Management System (WMS) - Office 365 and Inhouse developed Order Management System (OMS)
  • Logistics & Warehousing

Performance Improvement (Strategy & OPS)

Ernst & Young LLP (EY)
05.2019 - 06.2021
  • Assisted in formulating the digital transformation strategy to address the future needs and strategic vision
  • Prepare Strategy decks, research reports & presentations on recommended solution for the client
  • Conducted secondary research using publicly available info & paid databases such as Factiva & D&B hoovers
  • Reviewed Vendor solutions and compared key product features to formulate vendor comparison sheet
  • Digital Maturity Assessment of the client (As-Is Study) and to define the 'To Be' state from gaps observed
  • Assisted client in drafting proposals & RFPs on Integrated project management, Master data cleansing etc.
  • Involved in drafting the user requirement sheet & conducting the vendor evaluation for digital solutions
  • Coordinated with multiple OEMs / System Integrators (SI) for conducting the pre-tender meeting
  • Assisted in formulating the overall contract renegotiation strategy with aim to reduce the total cost by 15%
  • Performed detailed market analysis through online research which includes research reports & case studies
  • Performed quantitative analysis to prepare the business cases for all the assumed hypothesis
  • Developed renegotiation strategy for procurement of 47 oil rigs with the total saving opportunity of INR750 Cr
  • Lead meetings with various stakeholders to ensure that implemented solutions can deliver the set targets
  • Established regular reporting to update key stakeholders on the status, risk, and progress of the project portfolio
  • Prioritize customer issues and requests and work with internal teams to deliver on time

Manager - Plant Operations

Tata Chemicals LTD, Chambal Fertilizers & GAIL India LTD
08.2012 - 05.2017
  • Operations and Maintenance at Ammonia (Hydrogen Generation) Plant
  • Led the commissioning of an Advance Process Control system to improve the efficiency & reliability of systems
  • Developed maintenance schedule of installed equipment, in coordination with cross-functional team heads
  • Carried out evaluation of remaining life assessment (RLA) of equipment and to plan subsequent procurement
  • Synchronized with technical service team to introduce new energy saving scheme and modifications
  • Conducted market research to find the alternative raw material and equipment for process improvement.
  • Coordinated with the technology provider (Haldor Topsoe) for the capacity augmentation

Education

MBA - Supply Chain Management

IIM
Mumbai, India
05.2017 - 05.2019

Bachelor of Science - Chemical Engineering

IIT
Varanasi, India
05.2008 - 05.2012

Skills

  • Logistics Management
  • Distribution network optimization
  • Order Fulfillment
  • Warehouse Management
  • Capacity Planning
  • Inventory planning
  • Cost optimization
  • Cost Reduction
  • Ammonia Production
  • Hydrogen Generation

Personal Information

Date of Birth: 10/31/90

Timeline

Sr Manager - Logistics

Minimalist ( Hindustan Unilever Subsidiary)
04.2025 - Current

Senior Logistics Manager

Pepperfry.com
06.2021 - 12.2024

Performance Improvement (Strategy & OPS)

Ernst & Young LLP (EY)
05.2019 - 06.2021

MBA - Supply Chain Management

IIM
05.2017 - 05.2019

Manager - Plant Operations

Tata Chemicals LTD, Chambal Fertilizers & GAIL India LTD
08.2012 - 05.2017

Bachelor of Science - Chemical Engineering

IIT
05.2008 - 05.2012
Rahul DeswalSr Manager Supply Chain