Summary
Overview
Work History
Education
Skills
LANGUAGES
Certification
Accomplishments
Timeline
Generic
RAHUL JANGID

RAHUL JANGID

Vadodara

Summary

Seasoned Civil Engineer with over 10 years of expertise in large-scale infrastructure projects, including Dedicated Freight Corridors and High-Speed Rail. Specialises in project planning, execution, and controls, with a strong focus on resource management and client coordination. Demonstrates a solid ability to manage complex work fronts, optimise material utilisation, and meet critical commissioning milestones while navigating resource constraints.

Overview

1
1
Language
1
1
Certification
10
10
years of professional experience

Work History

Track Engineer

LARSEN & TOUBRO (L&T)
03.2025 - Current
  • Client: National High Speed Rail Corporation Limited (NHSRCL)
  • Project: Design, Supply and Construction of Track and Track-related Works including Testing & Commissioning for the double-line Mumbai?Ahmedabad High-Speed Rail project between Vadodara and Sabarmati Depot & Workshop, Gujarat.
  • Execution & Technical Responsibilities
  • Contribute to planning and execution of track and track-related works covering approximately 105 TKM of work fronts.
  • Supervise temporary track laying, track slab installation and alignment, rail laying and welding activities.
  • Execute and supervise CAM injection and Synthetic Resin Injection activities as part of ballastless track construction.
  • Manage CAM and Synthetic Resin field and laboratory testing, quality control and post-treatment operations.
  • Coordinate material FAT and calibration activities and ensure compliance with project quality requirements.
  • Provide technical guidance and training to workmen and junior/subordinate personnel.
  • Coordinate with the client, subcontractors and internal teams to ensure smooth execution and timely resolution of site requirements.
  • Planning & Project Controls
  • Prepared and monitored daily, weekly and monthly work plans to ensure alignment of planned targets with site execution requirements.
  • Prepare DPRs and monitor progress, productivity and work-front performance.
  • Develop resource requirements based on planned activities, work fronts and project priorities.
  • Track progress against planned targets and coordinate corrective actions to maintain project schedules.
  • Participate in client planning and progress review meetings.
  • Managed subcontractor measurements, billing and reconciliation processes for work valued at approximately ?215 Crore, ensuring financial accuracy and accountability.
  • Coordinated planning and execution activities with approximately 50 personnel and 4 subcontractors to streamline project workflows.
  • Key Achievements
  • Played a key role in initiating CAM and Synthetic Resin activities, becoming one of the early engineers involved in establishing these activities for High-Speed Rail track works in India.
  • Successfully completed 30 TKM of track and CAM works within 4 months, achieving a critical project milestone and receiving appreciation from the client.
  • Analysed CAM and Resin consumption and implemented multiple process and monitoring checks, reducing material wastage from approximately 1.5% to 0.4%.
  • Contributed to improved utilisation of high-value imported raw materials from Japan through systematic monitoring and quality-control measures.
  • Project Value: 4,000 Crore
  • MUMBAI?AHMEDABAD HIGH-SPEED RAIL PROJECT
  • T-3
  • August 2016
  • Present | 10+ Years

Site Engineer

LARSEN & TOUBRO (L&T)
08.2016 - 02.2025
  • Execution & Construction Management
  • Executed and coordinated civil and associated infrastructure works across 2,119 TKM of WDFC, ensuring timely delivery and compliance with project specifications.
  • Worked across 7 Traction Substations, 7 Auto Transformer Stations, 3 Switching Posts, 16 Sub Switching Posts and 2 Power Posts.
  • Executed approximately 2 lakh Cum of earthwork and 50,000 Cum of concreting.
  • Supervised construction of control room buildings, equipment and structural foundations, cable trenches, slope protection and drainage works.
  • Executed OHE foundation works, mast erection and grouting, along with equipment and transformer erection activities.
  • Coordinated equipment and structure installation, testing and commissioning activities at substations and associated switching posts.
  • Coordinated execution activities involving approximately 1,200 manpower and 32 subcontractors across multiple work fronts.
  • Managed subcontractor and client billing, measurements, and quantity reconciliation for documentation of approximately ?1,200 Crore, supporting financial accuracy and project accountability.
  • Planning & Project Controls
  • Assumed planning responsibilities from 2021 alongside site execution, enhancing project oversight and coordination.
  • Prepared and monitored daily, weekly and monthly plans and tracked progress against planned targets.
  • Prepared DPRs and supported project progress monitoring and reporting.
  • Undertook resource planning, productivity monitoring and look-ahead planning for multiple work fronts.
  • Supported recovery planning and delay analysis to maintain execution targets.
  • Participated in client and stakeholder coordination for planning and execution requirements.
  • Managed BOQ and quantity tracking, billing, reconciliation and project documentation.
  • Supported commercial management of approximately ?150 Crore of variation works.
  • Key Achievements
  • Successfully completed end-to-end commissioning of 1 Traction Substation and 5 Switching Posts within 4 months, managing limited resources and coordinating multiple execution activities to enable commencement of OHE power supply for a critical section.
  • Successfully recovered approximately 3 months of accumulated delay on the UltraTech Cement Siding connecting line following resolution of a long-pending design issue in Rajasthan, and completed and commissioned the associated OHE works within the revised timeline.
  • Managed Defect Liability Period (DLP) activities through project close-out, completing final outstanding works and successfully closing client billing of approximately ?120 Crore that had remained pending for an extended period.
  • Received client appreciation for successful completion and commissioning of critical works under challenging resource and schedule constraints.
  • Client: Dedicated Freight Corridor Corporation of India Limited (DFCCIL)
  • Project Value: 4,500 Crore + 500 Crore Variation
  • Project: Design, Supply, Installation, Testing and Commissioning of 2?25 kV Traction Power Supply System, Traction Substations, Auxiliary Stations, Switching Stations, Auto Transformer Stations and SCADA System on Design-Build Lump Sum Price basis for the Rewari?Makarpura (Vadodara) section of WDFC.
  • WESTERN DEDICATED FREIGHT CORRIDOR
  • EMP-4

Education

B.Tech. - Construction Technology

Nirma University
Ahmedabad, Gujarat
06-2025

Diploma - Civil Engineering

Government Polytechnic College
Jodhpur, Rajasthan
05-2016

Senior Secondary (12th) - PCM

RBSE
Jodhpur, Rajasthan

Skills

  • Track Maintenance
  • Construction Management
  • Civil construction
  • Project Planning & Controls
  • Project scheduling
  • Planning & Controls
  • Execution
  • Quality control
  • Subcontractor management
  • Subcontractor billing
  • Contract Management
  • Infrastructure development
  • Primavera P6
  • Software
  • Commercial
  • Primavera P6

LANGUAGES

English | Hindi

Certification

Certified Track Engineer ? JARTS, Japan Association of Railway Technical Services (JARTS), Essentials of Project Planning & Control (EPPC)

Accomplishments

  • 10+ years of experience with Larsen & Toubro across major infrastructure, Dedicated Freight Corridor and High-Speed Rail projects.
  • Strong combination of Planning, Project Controls and Site Execution experience, with formal planning responsibilities since 2021.
  • Current experience on the prestigious Mumbai?Ahmedabad High-Speed Rail Project, contributing to track planning, execution and specialized track-related activities.
  • Successfully delivered 30 TKM of High-Speed Rail track and CAM works in 4 months.
  • Improved CAM & Resin material utilization by reducing wastage from 1.5% to 0.4% through systematic process and monitoring controls.
  • Successfully commissioned 1 TSS and 5 Switching Posts within 4 months under limited resource conditions on WDFC.
  • Recovered approximately 3 months of delay on a critical WDFC connecting line and achieved timely OHE commissioning.
  • Managed approximately ?1,415 Crore of billing and reconciliation across WDFC and MAHSR T-3 assignments.
  • Executed and coordinated approximately 2 lakh Cum earthwork and 50,000 Cum concrete works on WDFC.
  • Experience across 2,119 TKM WDFC infrastructure and approximately 105 TKM of High-Speed Rail track-related work fronts.
  • Coordinated large-scale execution involving up to 1,200 manpower and 32 subcontractors.
  • Experience in resource planning, productivity monitoring, recovery planning, delay analysis, progress reporting and commercial/project controls.

Timeline

Track Engineer

LARSEN & TOUBRO (L&T)
03.2025 - Current

Site Engineer

LARSEN & TOUBRO (L&T)
08.2016 - 02.2025

B.Tech. - Construction Technology

Nirma University

Diploma - Civil Engineering

Government Polytechnic College

Senior Secondary (12th) - PCM

RBSE
RAHUL JANGID