- Managed and scaled a 12-member engineering team
- Delivered new product in 3 months with continuous releases
- Improved team velocity by 2x using AI-assisted development
- Achieved $600K cost savings through architectural optimization
- Led enterprise-level platform transformation (Integration Studio)
- Built scalable, production-grade systems using cloud-native architecture
