Electrical Engineer offering 10+ years of expertise in power systems, automation and controls. Well-versed in developing technical studies and investigations. Efficient and focused on proficiency in electrical engineering design and applications. Accustomed to leading highly effective multidisciplinary teams to complete projects in alignment with corporate goals.
Overview
10
10
years of professional experience
1
1
Certification
Work History
Senior Electrical Engineer
Engineers India Limited(Aarvi Encon Ltd)
Guna
06.2023 - Current
·Setting up 4.3 TPD PEM2 no’s of Electrolyzer Packages , 2 no’s Transformer Rectifier, DI packages, and Hydrogen Purifier Unit installation as per approved drawing.
Ensured that all installations were compliant with local regulations regarding safety standards.
Assisted in installation of electrical components during field tests or commissioning activities.
Reviewed engineering drawings for accuracy and completeness prior to production release.
Erection, Testing of UPS and battery bank ACDB Panel , TFA System.
Verify and Approved the All Documents and layout as per standard.
Witness and verify of Motor(110 k &30 kw) and Pump Erection and Testing & Commissioning.
·Ensuring the quality with an in-depth inspection and continuous inspection of the work site in line with the tender required.
Verify of 40 MVA/ 50MVA/ 31.5 MVA/25MVA /1.6 MVA Power Transformer Installation and Testing & Commissioning.
Erection of 132 KV Switchyard modification and new 33KV GIS Sub-station and HVAC & Battery Room and Control Room.
Verify Cathodic Protection System CMU, TRU, MJB, AJB, CJB, TS, EJB, RC MMO wire Anode and HDPE perforated pipe of Installation Testing & Commissioning.
Senior E&I Engineer
Certification Engineers International Ltd(Bonace engg pvt ltd)
Mundra
01.2023 - 05.2024
Ensure timely completion of work by taking suitable site decisions as and when required in line with the tender requirement and as per the standard industry practice.
Witness Compressor and Heater installation as per the approved drawing. Witness and accepted Compressor PGTR test as per tender requirement.
Incoming material inspection and review of documents like IRN, TC etc. as per QAP or Job procedure.
Execution of field activities like Installation of cable tray, Earth strip laying, Earth Pit, cable ducts, Junction boxes, and Electrical Panel, as per typical drawings.
Monitor day-by-day work progress and prepare the daily & monthly program & report.
Reviewed design documents prepared by engineering teams for accuracy prior to implementation.
Ensured compliance with safety regulations while performing work activities.
Calibrated instruments according to established procedures and standards.
Monitored project progress against established timelines in order to ensure timely completion.
Handling of site-related documents like engineering drawings, and built drawings Preparation of cash Forecast for site expenses & Material Forecast.
Electrical Engineer
Quality Fabricators & Erectors
Anantapur
08.2022 - 12.2022
Created electrical system drawings, wiring diagrams, and schematics.
Collaborated with other engineers on design projects to ensure safety and quality standards were met.
Installed, tested and maintained a variety of electrical equipment including motors, generators, transformers.
Developed testing protocols to evaluate performance of new components or systems.
Prepared daily project status updates to inform staff and document project changes.
Conducted tests on electrical systems and equipment and reported results.
Assisted in the commissioning of new installations and upgrades.
Handling of site-related documents like engineering drawings, and built drawings.
· Preparation of Consumption statements & Reconciliation of all Free issued and supplied materials.
Installation and testing & Commissioning of Power Transformers, distribution Transformer.
Electrical Engineer
ANI Integrated Service Ltd
Amlapuram
06.2021 - 08.2022
Monitored project progress against established timelines in order to ensure timely completion.
Supervised construction activities for quality assurance purposes.
Monitored construction sites to ensure safety guidelines adherence.
Prepared technical reports detailing project progress and findings.
Supervised inspection and Testing of Cable Continuity , insulation resistance test before and after laying.
Installation & testing & Commissioning of MV/ LV Panels.
Erection & installation of power DBs lighting DBs.
Installation cable tray and tray Angle work.
Knowing cable laying, Gland & Termination as per schedule.
Following all activities related to the HSE (Health, Safety and Environment) policy of the organization.
Knowing plant safety rules and regulations.
Laying of Earth Strip Above Ground and Under Ground as Per Drawing.
Engineer
Power Mech Project Ltd
Solapur
05.2020 - 06.2021
Working as a Shift In charge in C&I Maintenance Departments C&I.
Supervised a team of mechanics, electricians and technicians in carrying out daily maintenance activities.
Oversaw the installation, repair and replacement of plant machinery and equipment.
Reviewed engineering drawings to ensure accuracy prior to implementation in the production process.
Conducted regular inspections of all machines and identified potential problems before they occurred.
Maintenance Electrostatic precipitator (ESP) Area ,Level Transmitter , Level Sensor ,Level Controller and MHV Cylinder.
Specialization in Operation & Maintenance Instrument’s
Quantity Surveyor Engineer
URS Scott Wilson India Pvt Ltd (AECOM)
Motihari
03.2017 - 04.2020
Conducted site visits every to verify work quality and compliance with standards.
Developed strategies for minimizing risks associated with the execution of projects.
Conducted site visits to assess progress on works.
Coordinated with other departments to ensure effective implementation of project activities.
Analyzed and interpreted construction plans, drawings and specifications.
Monitored progress of works against project timeline, budget and quality standards.
Prepared bill of quantities for tenders and contracts.
Provided technical advice and support on all contract related matters.
Erection and Quality & Quantity of 12 Nos. of Power Sub-Station 33Kv/11Kv.
Erection and Quality & Quantity of Overhead 33Kv& 11Kv lines.
Site visit for inspection of quality and quantity of work done by contractor
Site Engineer
Subhash Project And Marketing Lt
GAYA
06.2014 - 05.2017
Supervised and monitored project subcontractors and labor force.
Managed use of materials and equipment to prevent property loss and support availability.
Completed site surveys, marked locations and oversaw construction of various projects.
Answered technical concerns and devised solutions to resolve site and engineering problems.
Wrote technical reports documenting project progress and specifications.
Monitored third-party contractor progress to maintain project continuity and support timely project completion.
To handle team of GPS survey for 11kV, LT lines and Distribution transformer.
To coordinate survey work with client in effective manner.
To ensuring that all materials used and work performed are as per specifications.
To oversee the selection and requisition of materials for given site/feeder for smooth execution.
Coordinating with superior, engineering team, clients’ representatives, including attending regular meetings for better result as per guideline.