Summary
Overview
Work History
Education
Skills
Languages
Hobbies and Interests
Personal Information
Additionalinformation
Timeline
Generic
RAHUL SINGH

RAHUL SINGH

Mehnajpur

Summary

Talented executive leader driven to optimize methods and mindsets to exceed objectives. History setting ambitious goals for operations. Knowledgeable about regulations and industry best practices.

Overview

13
13
years of professional experience

Work History

Assistant Manager

Rashmi Seamless pvt. Ltd.
Kharagpur
05.2023 - Current
  • To make monthly and daily production plan for Cold Pilger, cold draw, Push pointing, furnace
  • Ensure proper movement of material between different stations, no bottlenecking to allow at any station
  • Monitor Job to ensure they will finish on time
  • Reporting the Production report to HOD and preparing MIS report for management
  • Continuous monitoring the yield of the process
  • To analysis reason for all Non-Conformance and implement corrective actions
  • Planning of corrective actions to reduce internal rejection/recoveries and to avoid customer complaints
  • To assist to HOD in budget making
  • To generate PR and indent the materials for smooth running of machine and plant
  • Attending daily meeting in absence of H.O.D
  • To give instructions to Engineers and shift in charge
  • Providing daily production program for Push pointing, swagging, drawing, heat treatment
  • Scheduling of machines for cold drawing as per getting maximum output and less size changes to occur
  • Scheduling tank cleaning of ACID tank, Discarding soap tank and cleaning phosphate bath sludge
  • Coordinates with Quality department for taking Heat treatment cycle for different grades materials
  • Successful trial for Hot water Generator, and STP process
  • Taking trial of CD-20T, CD-40T and CD60T
  • Implementation of new ideas on draw bench and swagging machines
  • ISO documentation, and facing ISO audit

Senior Executive

Indian seamless metal tubing ltd.
Ahmednagar
11.2015 - 04.2023
  • Monitoring performance of all work stations and ensuring smooth running of the same
  • To ensure 100% observance of generic quality plan
  • To ensure 100% Job card and MPS system in the bay
  • To ensure proper maintenance of production equipment through co-ordination with mechanical and electrical maintenance department including planned preventive maintenance
  • Implementation and controlling of statistical techniques used during manufacturing
  • Preservation and disposition of quality records in the department
  • To ensure material storage at all stages of manufacturing as per procedure for identification, inspection and test status
  • Maintaining and monitoring the cleanliness of the premises
  • Use of ERP system for Daily production entry and making SIV for store material movement
  • To follow all EHS procedures and work instruction of QA function
  • Accountable for indenting and follow up for non-stock tooling required
  • Accountable for daily planning of Tagging, Surface treatment, Drawing and heat treatment
  • Accountable for tooling trials

Shift Engineer

Chandan steel ltd.
Umbergaon
06.2014 - 11.2015
  • Coordination with planning department for monthly and quarterly achievements of target
  • Maintain and responsible for Shop floor discipline
  • Taking shift handover from previous shift in charge with proper planning and material identification
  • Take instruction from Cold Pilger Manager and implement at shop floor
  • Handling Production Planning and manpower
  • To maintain daily production Report, target and efficiency
  • Hourly monitoring of work being done so that maximum output can be achieved in the shift

Production Engineer

Prakash Steelage Ltd.
Umbergaon
02.2012 - 06.2014
  • Shift Handling and shift wise report making
  • Following the instructions from Manager and implementing on shop floor
  • Preparing and implementing action plans effectively to maximize overall equipment Efficiency of production machines
  • Supervising hourly production
  • Coordination with other dept
  • Like Mechanical maintenance, Electrical maintenance, and PPC
  • Entry of daily production of tubes in SAP system
  • Monitoring pilger Die Assembly area
  • Material handling and making transfer memo for degreasing and Pickling of SS tubes

Education

B.Tech - Mechanical

Yagyavalkya institute of technology
Jaipur, RJ
01.2011

Intermediate - science

Govt Higher Sec. School
chowkham, Arunachal
01.2007

High School -

Govt Hr. sec. school
chowkham, Arunachal
01.2003

Skills

  • Decision Maker
  • Problem Solver
  • Team builder
  • Knowledge of Pilgering and drawing process
  • Pilger & drawing trouble shooting
  • Knowledge of process flow
  • Understanding of tube specification
  • In process inspection skill
  • Primary knowledge of heat treatment
  • Primary knowledge of computer

Languages

  • Hindi, First Language
  • English, B2 Upper Intermediate

Hobbies and Interests

  • Swimming
  • Watching movies
  • Listening music
  • Playing cricket

Personal Information

  • Date of Birth: 07/09/87
  • Marital Status: Married

Additionalinformation

Shri Munno Singh, 8.45 lakh per annum, 11.00 lakh per annum, 30 days

Timeline

Assistant Manager

Rashmi Seamless pvt. Ltd.
05.2023 - Current

Senior Executive

Indian seamless metal tubing ltd.
11.2015 - 04.2023

Shift Engineer

Chandan steel ltd.
06.2014 - 11.2015

Production Engineer

Prakash Steelage Ltd.
02.2012 - 06.2014

B.Tech - Mechanical

Yagyavalkya institute of technology

Intermediate - science

Govt Higher Sec. School

High School -

Govt Hr. sec. school
RAHUL SINGH