Primavera P6 & MS Project
A result oriented professional with approx. 12 years’ of experience in Quantity surveying, Estimation, Costing & Budgeting, and Contracts Management.
Presently associated with Adani Ports & Logistics, as Associate Manager Estimation in Ahmedabad. Adept in Estimation, Costing, Billing & contract claims & executing construction projects. Proficient in swiftly ramping up construction projects with competent cross-functional skills;
Ensuring on time deliverables within pre-set cost parameters. A keen communicator with problem solving, analytical and negotiation skills.
Project Name: - Mumbai Trans Harbour link project- Package-2
Project Value: - 5612.6 Crore INR
Contract type- EPC Lump sum contract
Reference Code for Measurement: - IS , AISC,JIS, BS
Key Deliverables:
Planning & costing:
Maintain, develop, and update the Master Project schedule.
Oversee the cost, schedule, and budget management
Update budget revisions, actual costs, and cost reporting in P6.
Manage cost and schedule contingency
Produce Monthly Cost Report, Monthly Schedule Report, and Progress Report
Maintain the program budget and cost forecast
Budget Monitoring – Budget monitoring through the System Generated reports.
Control of costs with Earned value management.
Creation of Work Breakdown Structures.
Cost and schedule baseline management.
Cost and resource loaded schedules.
Subcontractor Billing Works:
Rate analysis for all subcontract related works.
Subcontractor Selection, Evaluation & Development.
Preparation & approval of Work orders as per rates approved.
Verification of subcontractors bills as per executed work
Reconciliation of Subcontractor Work Bills.
Contracts Management:
Assisting contract manager in study of contract conditions.
Assisting in compilation of claims, rates for extra items & variation orders.
Compilation of cost claims and time extension claims.
Pre Contract :
Quantity Take off for Design and build Projects & Checking of BOQ received from consultants.
Preparing Standard BOQ format for Metro, Road Bridges, Hydro Projects & Airport projects.
Vendor Enquiry for Pre tender rates for major materials and subcontractors.
Site visit for understanding of preliminary cost & acquiring rates for major materials like Aggregates, Cement, Steel & RMC etc.
Assisting in preparation of Pre Bid Queries if any by studying the tender documents.
Development of Logistics plan in AutoCAD for tender Submission.
Value Engineering or optimization in Projects.
Preparing cost estimates for Roads, bridges & Ports.
Preparing and managing all technical Submittals as per tender documents and assisting BD team accordingly for tender submission.
Project Name:- Riyadh Metro Project - Package 3 for Line 6
Project Value for Line 6: 1.89 Billion USD
Contract type- EPC Lump sum contract
Reference Code for Measurement: - AISC, BS, SBC
Key Deliverables:
Project Name:- DMRC CC29 (Elevated viaduct and Ramp of length 2653.44m Structural and Architectural works of elevated Station of Sadar bazar and Shankar vihar)
Project Value: 137.97 Crore INR
Contract type- Lump sum & Item Rate Contract
Reference Code for Measurement: - IS Codes
Key Deliverables:
Planning & costing:
Maintain, develop, and update the Master Project schedule.
Oversee the cost, schedule, and budget management
Update budget revisions, actual costs, and cost reporting in ERP.
Manage cost and schedule contingency
Produce Monthly Cost Report, Monthly Schedule Report, and Progress Report
Maintain the program budget and cost forecast
Equipment cost planning
Daily Inputs of DPR in SAP and Physical Progress.
Gathers data required for costing through site visits, market prices, internal database etc
Compiles cost estimates from other teams such as Design & Markets, Quantity survey team.
Calculation of quantities based on drawings received (GFC)
Budget Monitoring – Budget monitoring through the System Generated reports.
Control of costs with Earned value management
Make a comparison of actual v/s theoretical quantities for projects
Responsible for multiple projects budgeting, compiling expenditure estimates per activity and item wise and monitoring to ensure that all activities are executed in time as per schedule and within budgeted cost
Preparation of BOQ, MIS reports, Change orders in case of variance
Project Name: - Tehri Pump Storage Plant (250x4 MW Hydro Electric Project)-Uttarakhand
Project Value: 723.74 Crore INR
Contract Type- EPC Turnkey Contract
Reference Code for Measurement: - IS Codes
Key Deliverables
Client Billing Works:
Co-ordination among consultants, contractors and clients.
Submission of monthly bills as per provisions of the contract.
Certification of bill, as per provisions with the client and collection as per provisions
Reviewing prescribed methods of measurement and to adopt most suitable option.
Interpretation of contractual obligations & rights and evaluation of Technical / Financial problems for Management reporting.
Responsible for Payment collection from client
Subcontractor Billing Works:
Rate analysis for all subcontract related works.
Subcontractor Selection, Evaluation & Development.
Preparation & approval of Work orders as per rates approved.
Verification of subcontractors bills as per executed work
Reconciliation of Subcontractor Work Bills.
Major Material Reconciliation and Minimizing wastages.
Contracts Management:
Assisting contract manager in study of contract conditions.
Assisting in compilation of claims, rates for extra items & variation orders.
Compilation of cost claims and time extension claims.
Evaluating contracting works, handling negotiation, award & review of contracts as per contract regimes.
MIS inputs to the Project Manager for preparation of Budget.
Estimation
Key projects of Experience:
Major Heavy Civil Infra projects worked on: -
Ports and Logistics- Gangavaram Port , Mundra Port, Dhamra Port, Nagpur - Butibori Warehouse, Cochin Warehouse, NRC -Kalyan Warehouse
Metros & Rail Projects – Riyadh Metro (Line 6) KSA, Mumbai Metro Phase III, Delhi Metro- CC29 Pkg
Bridges & Roads – Mumbai Trans Harbour Link (Pkg2), Mumbai . Nagpur Samridhi Expressway, Karimnagar Cable stayed Bridge.
Hydro Projects – Tehri Hydropower PSP Uttarakhand, Hirakud Spillway Orissa, Arun-3 HEP Nepal
Project Management Professional certified from Project management Institute (PMI) – 2872316
Institute of Engineers (India) Chartered Engineer Certificate – AM183512-5 Certificate
Diploma in Building Design from CADD center, Nagpur- STAAD-PRO, AUTOCAD
Professional in PPM software from CADD center, Nagpur - PRIMAVERA P6, MS PROJECT, PPM CONCEPTS
Primavera P6 & MS Project
AUTOCAD
SAP ( SD,MM & PS Module
MS Office
Project Management Professional certified from Project management Institute (PMI) – 2872316
Project Management Professional certified from Project management Institute (PMI) – 2872316
Chartered Engineer Certificate – AM183512-5
Diploma in Building Design from CADD center, Nagpur- STAAD-PRO, AUTOCAD Professional in PPM software from CADD center, Nagpur - PRIMAVERA P6, MS PROJECT, PPM CONCEPTS