Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
RAJ KUMAR SINGH

RAJ KUMAR SINGH

Summary

Mechanical Engineer experienced in construction management, piping, and steel structure erection across refinery, petrochemical, utility, and power projects. Achieved project efficiency and timely delivery through effective planning, budgeting, and coordination of diverse teams while maintaining high safety and quality standards. Focused on risk mitigation and supplier relationship management, resulting in cost reductions without compromising material integrity or workmanship.

Overview

2
2
Languages
4
4
years of post-secondary education
18
18
years of professional experience

Work History

Assistant Construction Manager

L&T Hydrocarbon Engineering Ltd.
Balotra
08.2022 - Current
  • Maintain hundred percent Safety adherence of all workmen by complying JSA,HIRA & PTW.Coordinated delivery schedules for materials at job sites to maintain workflow and prevent delays.
  • Oversaw compliance with safety regulations and construction standards on job sites.
  • Monitored daily construction and evaluated project progress, contract compliance and safety.
  • Maintain hundred percent Safety adherence of all workmen by complying JSA,HIRA & PTW.Coordinated delivery schedules for materials at job sites to maintain workflow and prevent delays.
  • Setting the monthly achievable target of Structure(Scope 1800 MT) &Piping(180 IM)mark wise and Spool wise.
  • Coordinate with Fabrication Shop and Central planning Team for the flow of material erection site.
  • Generated work front for electrical and instrumentation departments by coordinating resource availability.
  • Collaborated with engineers to resolve design issues during construction phases.

Project Engineer

Tuaman Engineering
Barmer
04.2022 - 08.2022
  • Coordinated project timelines and resources to achieve on-time delivery.
  • Managed resources such as equipment, materials, personnel and subcontractors to achieve project goals.
  • Monitored work performance against established milestones ensuring adherence to approved schedules.
  • Managed inventory of piping materials and tools for efficient workflow.
  • Conducted regular safety meetings with crew members to discuss job hazards and safe work practices

Piping Engineer

Bridge and Roof CO(I) Ltd
Bhatinda
12.2019 - 10.2020
  • Executed unit area piping work for branch pipe rack at DFCU unit (Cold section) with total scope of 4.5 lac IM, ensuring compliance with all safety requirements per JSA.
  • Generated work front for subcontractor by coordinating with fabrication shop and EIL to ensure availability of spools and materials, resolving material constraints and sequential holds.
  • Collaborated with consultant to obtain updated engineering drawings and specifications. for issue of latest detailed engineering drawings and specification prior to erection and inline erection elements.
  • Performed front estimation to assess engineering and material needs for timely project execution. with regards to Engineering, Material & Physical site release
  • Prepared and maintained forecast schedule, initiating corrective actions to address deviations proactively.

Construction Engineer

Reliance Jio Infocom Ltd
Hazaribagh
04.2017 - 11.2019
  • Planned work activities, allocated resources, and scheduled underground optical fibre laying in public domain to ensure timely project completion.
  • Coordinating with contractors, vendor and ensuring all project work is being done as per the approved standards without compromising on the cost of quality.
  • Followed up with contractors to mobilize required manpower and resources, facilitating achievement of project targets.
  • Validation of contractors Measurement book in accordance of valid ITP.
  • Proper coordination with circle team for timely resolution of issues and escalations.
  • Ensure the circle teams are fully informed about the progress, work and feedback on the work by the contractors

Construction Engineer

Reliance Industries Ltd
Jamnagar
10.2013 - 03.2017
  • Planned work activities, allocated resources, and scheduled piping activities including fabrication, blasting, erection, mechanical clearance of piping loops, and pre-commissioning activities to ensure project timelines were met.
  • Resolving engineering issues while executing in coordination with Projects and Engineering department for proper layout of equipment and TS.
  • Escalation of issues with Consultant to minimize the fall of foundations, structures and equipment with existing UG and AG piping during detailing phase of project.
  • Resolving engineering issues while executing in coordination with Projects and Engineering department for proper layout of equipment and TS.
  • Escalated issues with consultants to address project challenges. with Consultant to minimize the fall of foundations, structures and equipment with existing UG and AG piping during detailing phase of project.
  • Assisted senior manager in managing the flow of critical documents and drawings. in controlling flow of all important Documents and drawings.

Piping Engineer

Brothers Engineers and Erectors Ltd
Akaltara
05.2012 - 08.2013
  • Prepared, reviewed, and approved job procedures to ensure readiness before work commencement.
  • Interdisciplinary coordination EPC client SEPCO and KSK for proper execution of work.
  • Resolving engineering issues in coordination with Projects & Engineering department.
  • Ensuring availability of all inspection reports in line with ITP and approved QAP.
  • Provided technical assistance in planning and scheduling weekly and monthly job activities.
  • Supported senior manager in managing flow of critical documents and drawings.

Mechanical Manager

Kohinoor steel Pvt Ltd
Jamshedpur
07.2011 - 04.2012
  • Planned and scheduled resources for effective deployment of qualified workforce.
  • Developed plans for major milestones with monitoring to ensure targets were met.
  • Executed and erected structures, pressure parts, APH, ducts, cyclones, bunkers, and fans according to drawings.
  • Planning for major milestones and planning with proper monitoring to achieve the target.
  • Resource planning and work scheduling to achieve effective manpower deployment of qualified workforce.

Assistant Engineer

Amrit Cement Industry Ltd
Meghalaya
12.2008 - 06.2011
  • Played a stellar role in the preparation and release of all the documents required for project execution and included project execution procedures, planning, commissioning documents, project handling documents, Amendment, BOQ and Checklist for various rotary equipment.
  • Erection and commissioning of 1X12 MW Captive Power Plant coal-based single Drum AFBC boiler rating 52 TPH, 66 KG/CM2 AND 490.5Deg.C. Supply: - Cheema Boiler Ltd.
  • Coordinated sub-contractors and workers to complete the project on schedule.
  • Erection and commissioning of 1X12 MW Captive Power Plant coal-based single Drum AFBC boiler rating 52 TPH, 66 KG/CM2 AND 490.5Deg.C. Supply: - Cheema Boiler Ltd.
  • Coordinated sub-contractors and workers to complete the project on schedule.

Education

B.Tech. - Mechanical Engineering

Synergy Institute of Engineering And Technology,;BPUT
Dhenkanal Odisha
07.2004 - 12.2008

Skills

  • Construction Planning
  • Site Supervision
  • Project Scheduling
  • Project scheduling
  • Procurement Management
  • Resource Management
  • Risk management
  • Asset management
  • Communication skills
  • Project scheduling

Languages

English
Advanced (C1)
C1
Hindi
Proficient (C2)
C2

Timeline

Assistant Construction Manager

L&T Hydrocarbon Engineering Ltd.
08.2022 - Current

Project Engineer

Tuaman Engineering
04.2022 - 08.2022

Piping Engineer

Bridge and Roof CO(I) Ltd
12.2019 - 10.2020

Construction Engineer

Reliance Jio Infocom Ltd
04.2017 - 11.2019

Construction Engineer

Reliance Industries Ltd
10.2013 - 03.2017

Piping Engineer

Brothers Engineers and Erectors Ltd
05.2012 - 08.2013

Mechanical Manager

Kohinoor steel Pvt Ltd
07.2011 - 04.2012

Assistant Engineer

Amrit Cement Industry Ltd
12.2008 - 06.2011

B.Tech. - Mechanical Engineering

Synergy Institute of Engineering And Technology,;BPUT
07.2004 - 12.2008
RAJ KUMAR SINGH