Summary
Overview
Work History
Education
Skills
Personal Information
Career Review
Timeline
Generic
RAJ KUMAR YADAV

RAJ KUMAR YADAV

Motihari

Summary

Seasoned professional with 15 years of experience in Stores and Warehouse Management, Procurement, Inventory Management, Logistics, and Transport Management within the construction sector. Proven track record of optimizing supply chain processes and enhancing operational efficiency. Committed to leveraging extensive expertise to drive organizational growth and project success.

Overview

16
16
years of professional experience

Work History

Asst. Manager Store

DILIP BUILDCON LIMITED
11.2024 - Current
  • Project: Narmada- Gambhir MVS MPJNM Turnkey Engineering Procurement Construction Testing Commissioning Trail Run and Operation and Maintenance for 10 Years of Narmada Gambhir Multi Village Drinking Water Supply Scheme District Ujjain in Single Package on Turnkey Job Basis.
  • Project Value: 1,275.30 crore.
  • SAP/Inventory System Management: Ensuring real-time stock visibility reconciliation, audit compliance, and coordination with accounts and procurement.
  • Overseeing Store Operations: Supervising and coordinating all store activities, including inventory management, procurement, and distribution of materials for the Narmada Gambhir Water Supply Project.
  • Facilitating Inventory Management:Managing the entire spectrum of inventory operations, including storage, distribution, and tracking, to ensure optimal stock levels and efficient utilization of resources.
  • Spearheading Vendor Relationship Management: Cultivating and nurturing strong relationships with suppliers through effective communication, negotiation, and collaboration to foster mutually beneficial partnerships and ensure reliable and timely supply chain management.
  • Implementing Inventory Optimization Techniques: Utilizing advanced inventory optimization techniques, such as ABC analysis and Just-in-Time (JIT) inventory management, to minimize carrying costs, reduce inventory holding periods, and mitigate the risk of stock obsolescence.
  • Supervising Warehouse Operations:Directing warehouse operations, including receiving, storage, and dispatching of goods, to maximize operational efficiency, minimize errors, and uphold safety and security standards within the facility.
  • Driving Continuous Improvement Initiatives: Leading continuous improvement initiatives within the procurement and inventory management functions, fostering a culture of innovation, efficiency, and excellence to achieve operational excellence and meet evolving business needs.
  • Proactively Resolving Supply Chain Challenges: Proactively identifying and addressing supply chain challenges, such as material shortages, production delays, and transportation disruptions, through effective problem-solving and contingency planning to minimize impact on project timelines and deliverables.

Asst. Manager Store

DILIP BUILDCON LIMITED
06.2024 - 11.2024
  • Preparing Purchase Order (PO)in SAP in accordance with the requirement of Projects Management team and maintain tracker of PR
  • Ensure accuracy of PO created in SAP for vendor details, prices, quantities, rate, tax code etc.
  • Controlling and managing a wide variety of inventory & inter site transfer of materials as per the need of the project.
  • Physical verification, quality inspection, preservation, and stacking of materials as per Indian standards and safety codes.
  • Asset and Equipment Management, including tracking, transfer, coordination, and maintaining up-to-date asset registers across site locations.
  • Stock level optimization and logistics coordination to avoid shortages or overstocking, minimize discrepancies, and ensure timely supply to the project site.Project: Prithla to Dhulawat railway project, a 21.14 km stretch of the Haryana Orbital Rail Corridor (HORC).
  • Project Value: 1092.46 Crore.
  • Preparing Purchase Order (PO)in SAP in accordance with the requirement of Projects Management team and maintain tracker of PR
  • Physical verification, quality inspection, preservation, and stacking of materials as per Indian standards and safety codes.
  • Controlling and managing a wide variety of inventory and inter-site transfer of materials as per the needs of the project.

S. Executive Store

DILIP BUILDCON LIMITED
08.2021 - 05.2024
  • Project: Rehabilitation and Up-gradation from 2 lane to 4 lane of NH Stretch under NHDP-IVB for Varanasi-Dagamagpur (Pkg-1) Section of NH-7 on EPC Mode.
  • Project Value: 670.5 Crore.
  • Preparing Purchase Order (PO)in SAP in accordance with the requirement of Projects Management team and maintain tracker of PR
  • Ensure accuracy of PO created in SAP for vendor details, prices, quantities, rate, tax code etc.
  • Controlling and managing a wide variety of inventory & inter site transfer of materials as per the need of the project.
  • Physical verification, quality inspection, preservation, and stacking of materials as per Indian standards and safety codes.
  • Asset and Equipment Management, including tracking, transfer, coordination, and maintaining up-to-date asset registers across site locations.
  • Stock level optimization and logistics coordination to avoid shortages or overstocking, minimize discrepancies, and ensure timely supply to the project site.

Executive Store

DILIP BUILDCON LIMITED
11.2017 - 08.2021
  • Project: Four Lanning of Wardha-Buti Bori (Package IV) section of NH-361 from km 465.500 to km 524.690 (Design Length: 59.190 km) under NHAI.
  • Project Value: 1,065.51 crore.
  • Responsibilities include SAP material receipts, physical inspection, stacking, issuing, condition monitoring, maintaining minimum and maximum levels of critical and fast-moving items, and maintaining the FIFO system. Day-to-day reporting to planning and PM, creating different reports as required by management.
  • Monitoring stock levels and reordering materials as needed to prevent shortages.
  • Executing regular stock audits and implementing strategies to reduce shrinkage and wastage.

Sr Store Assistant

LARSEN & TOUBRO LIMITED
Noida
09.2016 - 11.2017
  • Project: Delhi One Sec-16 Noida (Delhi NCR).
  • Project Value: 700 Crore.
  • Conduct quality inspections to ensure all materials meet the required specifications and standards.
  • Physical verification, quality inspection, preservation & stacking of materials as per Indian standards and safety codes.
  • Conducting regular stock checking and implementing measures to minimize shrinkage and wastage.
  • Ensured compliance with all safety regulations throughout the store premises.
  • Maintained compliance with safety and sanitation regulations in the store environment.

Store Assistant

LARSEN & TOUBRO LIMITED
Gurugram
08.2015 - 04.2016
  • Oversaw project valued at 500 Crore for Adani M2K Oyster Grande in Sec-102 Gurugram.

  • Maintained inventory accuracy through regular stock checks and updates.
  • Cleaned and tidied store to reduce health and safety hazards.
  • Received deliveries from vendors and ensured proper storage in designated areas.

Store Assistan

LARSEN & TOUBRO LIMITED.
GURUGRAM
03.2010 - 05.2015
  • The Grand Arch Multistories Building Project By Ireo-250 Crore in Sec-58 Gurugram
  • Maintained inventory accuracy through regular stock checks and updates.
  • Cleaned and tidied store to reduce health and safety hazards.
  • Received deliveries from vendors and ensured proper storage in designated areas.

Education

PGD+MBA - Material Management/General Management

MIT(Pune)+ JNU (Jaipur National University)
01.2017

B. Tech - Electronics & Telecommunication Engineering

JRN Rajasthan Vidyapeeth Deemed University
07.2013

O level -

DOEACC Society(MCIT Govt Of India)
01.2008

12th - PCM

CBSE
01.2007

10th -

CBSE
01.2004

Skills

  • Supply chain operations
  • Stock inventory management
  • Procurement processes
  • Material handling
  • Compliance with safety standards
  • Logistics planning and execution
  • Supplier relationship management

Personal Information

  • Date of Birth: 01/05/89
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Career Review

  • LARSEN & TOUBRO LIMITED, The Grand Arch High Rise Building Project Sec-58, Gurugram, 230 Crore, 08/03/10, 07/07/15, Store Assistant
  • LARSEN & TOUBRO LIMITED, Adani M2K Oyster Grande, Sec-102, Gurugram, 500 Crore, 08/07/15, 09/04/16, Store Assistant
  • LARSEN & TOUBRO LIMITED, Delhi One Sec-16, Noida, Delhi NCR, 700 Crore, 09/05/16, 10/11/17, Sr Store Assistant
  • DILIP BUILDCON LIMITED, Four Lanning of Wardha-Buti Bori, Maharashtra, 1065.51 Crore, 11/18/17, 08/13/21, Executive Store
  • DILIP BUILDCON LIMITED, Rehabilitation and Up-gradation of NH Stretch, Varanasi-Dagamagpur, Uttar Pradesh, 670.5 Crore, 08/13/21, 05/31/24, S. Executive Store
  • DILIP BUILDCON LIMITED, Prithla to Dhulawat railway project, Haryana, 1092.46 Crore, 06/01/24, 11/20/24, Asst. Manager Store
  • DILIP BUILDCON LIMITED, Narmada- Gambhir MVS MPJNM Turnkey, Ujjain, Madhya Pradesh, 1275.30 Crore, 11/20/24, Present, Asst. Manager Store

Timeline

Asst. Manager Store

DILIP BUILDCON LIMITED
11.2024 - Current

Asst. Manager Store

DILIP BUILDCON LIMITED
06.2024 - 11.2024

S. Executive Store

DILIP BUILDCON LIMITED
08.2021 - 05.2024

Executive Store

DILIP BUILDCON LIMITED
11.2017 - 08.2021

Sr Store Assistant

LARSEN & TOUBRO LIMITED
09.2016 - 11.2017

Store Assistant

LARSEN & TOUBRO LIMITED
08.2015 - 04.2016

Store Assistan

LARSEN & TOUBRO LIMITED.
03.2010 - 05.2015

PGD+MBA - Material Management/General Management

MIT(Pune)+ JNU (Jaipur National University)

B. Tech - Electronics & Telecommunication Engineering

JRN Rajasthan Vidyapeeth Deemed University

O level -

DOEACC Society(MCIT Govt Of India)

12th - PCM

CBSE

10th -

CBSE
RAJ KUMAR YADAV