Summary
Overview
Work History
Education
Skills
Languages
DECLARATION
Place
Timeline
AccountManager
Raja  Gupta

Raja Gupta

Deoria

Summary

Skilled Site Engineer with a strong foundation in civil engineering principles, construction project management, and team leadership. Proven track record of overseeing all phases of multi-million dollar construction projects. Strengths include ability to manage teams, implement operational processes, and drive project completion within budget and timeline constraints. Significant contributions made in previous roles include enhancing operational efficiency and improving quality control measures. Skilled civil engineer with background in designing and implementing infrastructure projects, including roads, bridges, and water systems. Strong in project management, team collaboration, and problem-solving to deliver projects on time and within budget. Demonstrated ability to adapt to new technologies and methodologies in civil engineering for efficient project execution. Contributed to enhancing infrastructure quality and safety standards through innovative design solutions.

Overview

7
7
years of professional experience

Work History

Site Engineer &site Incharge

Evergeen Enterprises
Tamilnadu
02.2019 - Current
  • Provided supervision, mentorship, and training to a team comprising of junior engineers and workers.
  • Prepared detailed reports on project progress and presented findings to senior management.
  • Coordinated the logistics of material delivery to ensure smooth project operations.
  • Executed data collection on various sites, analyzing measurements and appraising project conditions.
  • Executed projects with precision by implementing strategic planning, budgeting, and coordination.
  • Anchors: These are metal structures that are placed in holes drilled into the slope and filled with cement.
  • A cellular confinement system (CCS) is a three-dimensional, honeycombed sheet, mat, or interlocking structure filled with soil and planted with vegetation used to stabilize the surface of earthen cut and fill slopes
  • Anchor the cellular confinement system sections at the top of the slope across a 2-4 foot ledge. Expand and stretch the cellular confinement system down the slopes.
  • All types of grouting work.
  • Ground reinforcement includes, among other methods, the techniques of ground anchoring, cable bolting, and rock bolting. Ground anchors tend to be longer with higher capacity and are usually associated with civil infrastructure projects. Rock bolts tend to be shortest with lowest capacities. Cable bolts are used in stability problems that lie between the two, and are commonly used.

Jr.Engineer

Land mark constuction pvt ltd.
Mumbai
08.2017 - 01.2018
  • Performed all tasks in accordance with supervisor instructions.
  • Superior skills in reading maintenance and operation instructional manuals.

Education

DIPLOMA IN CIVIL ENGINEERING - Civil Engineering

RUDRAPUR INSTITUTE OF TECHNOLOGY
ROORKEE, UK
06-2017

12th passed -

Janta Inter Collage
Deoria UP
05-2014

10th Passed -

S.L J Inter Collage
Deoria UP
07-2012

Skills

  • MS Office
  • Net Browsing
  • AutoCAD proficiency
  • Project Coordination
  • Cost Control
  • Technical reporting
  • Work Planning
  • Scheduling and Planning
  • Site Inspection
  • Subcontractor Management
  • Staff Management
  • Civil engineering

Languages

Hindi
First Language
English
Upper Intermediate (B2)
B2

DECLARATION

  • I hereby declared that the above information given by me is true to best of my Knowledge

Place

  • Uatter pradesh

Timeline

Site Engineer &site Incharge

Evergeen Enterprises
02.2019 - Current

Jr.Engineer

Land mark constuction pvt ltd.
08.2017 - 01.2018

DIPLOMA IN CIVIL ENGINEERING - Civil Engineering

RUDRAPUR INSTITUTE OF TECHNOLOGY

12th passed -

Janta Inter Collage

10th Passed -

S.L J Inter Collage
Raja Gupta