Summary
Overview
Work History
Education
Skills
Accomplishments
Personal Information
Languages
Disclaimer
Timeline
Generic
Rajasekar Govindaraj

Rajasekar Govindaraj

Coimbatore

Summary

To work for an organization that will assign challenging job in order to bring out best of my talent utilizing my skill to the fullest and offer me learning experience so that It may be able to achieve desired goals of mine and the organization

Overview

9
9
years of professional experience

Work History

Supply Chain Management - Senior Engineer

Solavio Labs Pvt Ltd
Coimbatore
04.2020 - Current
  • Developed and implemented supply chain strategies to optimize inventory levels, reduce costs, and improve delivery times.
  • Monitored supplier performance metrics such as quality, cost, lead time, and delivery accuracy.
  • Coordinated with vendors to ensure timely availability of raw materials for production.
  • Collaborated with other departments to design efficient logistics solutions for product distribution.
  • Identified potential suppliers and negotiated contracts that met the company's needs in terms of pricing, quality, service level agreements.
  • Managed the procurement activities of goods or services from vendors or subcontractors according to corporate policies.
  • Created reports summarizing supply chain operations such as inventory levels and shipping schedules.
  • Implemented processes for order tracking and tracing from vendor through customer delivery.
  • Conducted regular reviews of existing supply chain procedures to identify opportunities for streamlining operations.
  • Planned transportation routes for domestic and international shipments using routing software applications.
  • Tracked shipments to ensure on-time deliveries while minimizing transit costs.
  • Enhanced supply chain processes, strengthening planning procedures, organizing schedules and maintaining records.
  • Implemented communication channels with customers, clientele and key vendors, prioritizing opportunities and ensuring quick problem resolution.
  • Negotiated prices and terms with suppliers, vendors and freight forwarders.
  • Design Verification before sharing the drafts with the Supplier based on the feasibility for manufacturing

Quality Assurance Engineer - Line Incharge

Craftsman Automation Ltd.,
Coimbatore
04.2017 - 12.2018
  • Maintain TPM in all Lines to attain Zero Accident, Zero Rejection (I Work, I Inspect, I Maintain) Concept
  • Developing and Submitting PPAP Documents for New Products to meet Customer Requirement
  • Preparing Control Plan, FMEA, CAR Based On the Process Change and Customer Specific Requirement of the Parts
  • Maintaining PFD & CRN Based on the Process Changes In Day to Day Process Flow
  • To Create SPC Chart for manufacturing process to increase Product and Process Quality
  • Preparing ISIR Reports for Developing Components.
  • Analyzed customer feedback to identify areas of improvement in product quality.
  • Conducted reviews of design documentation to verify compliance with quality assurance standards.
  • Created detailed reports on the results of quality assurance tests conducted.
  • Provided technical guidance to junior quality assurance engineers.
  • Performed root cause analysis on identified defects in order to determine corrective action plans.

Production Engineer

ELLEN Industries Pvt. Ltd
Coimbatore
09.2014 - 04.2016
  • Project Management - Looking Day-Today commitment towards Production
  • Production Planning & Control
  • Detailed study over the Production components considering the Process to be carried over and implement
    new concept to increase production rate
  • Conducting Meeting with Production Department Periodically and discuss about the resources utility, finally
    take a necessary step to increase the productivity and reduce the downtime to achieve on time delivery
  • Micro level planning to be schedule considering the process
  • Collecting Monthly Project Achievement reports for scheduling
  • Auditing the Daily Operator performance to reduce down time
  • Standardizing & Utilization of resources to reduce the cycle time
  • Preparing Operator List & skill matrix for Management Purpose
  • Auditing for Standardization towards Line - Production Process
  • Discussion with customers related to increase the performance of the pumps at various fields
    Preparation of 2D & 3D model for component using Auto CAD & Solid Works
    Design verification as per assembly and part design
  • Implemented Plug Gauges in Line Inspection to reduce Process Cycle Time

Education

BACHELOR OF ENGINEERING (MECHANICAL DEPARTMENT) -

Karpagam University
01-2014

HIGHER SECONDARY -

Gopal Naidu Higher Secondary School
01-2010

SSLC -

Smt .D. Padmathi Ammal High School

Skills

  • Design Verification
  • Risk Analysis
  • Management Skills
  • 2D and 3D Modeling
  • Cost Analysis
  • Staff Supervision
  • Team Leadership
  • Process Development
  • Project Coordination
  • Continuous Deployment
  • Dedicated
  • Independent
  • Fast in Work
  • Practical Mind in all Premises
  • Willing to Learn and Work
  • Capable of Handling Multitask
  • Man Power Management

Accomplishments

  • Reduce Machine Break Down Percentage by Proper Maintenance (ellen)
  • Introduced New Gauges for Inspecting Run-Out Manually in Valve Seat (CAL)
  • Introduced Kaizen In Child Part Inspection to Improve Productivity (CAL)
  • Succeeded in Government Project by Using Aluminium Rotor In V6 Motor
  • Introduced 5S in Machine Shop (ellen)
  • Introduced Function Gauges in Machine Shop and improve machine Utilization
  • Auditing for Standardization towards Line - Production Process
  • Discussion with customers related to increase the performance of the pumps at various fields
  • Preparation of 2D & 3D model for give component using Auto CAD 2010, Solid Works 2014
  • Design verification as per assembly and part design
  • Project Management - Looking after Day-Today commitment towards Production
  • Production Planning & Control
  • Detailed study over the Production components considering the Process to be carried over out and implement new concept to increase production rate
  • Conducting Meeting with Production Department Periodically and discuss about the resources utility, finally take a necessary step to increase the productivity and reduce the downtime to achieve on time delivery
  • Auditing the Daily Operator performance to reduce down time
  • Standardizing & Utilization of resources to reduce the cycle time
  • Preparing Operator List & skill matrix for Management Purpose
  • Micro level planning to be schedule considering the process
  • Collecting Monthly Project Achievement reports for scheduling
  • Daily Customer Interaction - To Dispatch the Part Quantity they Required without any Deviation in Quality (Including PPC Team)
  • Implementing Customer Requirements in Line, Based on Customer Audit
  • Following Child Part Suppliers to Improve Part Quality and to Reduce Customer Complaints
  • Proper Intimation of Inward Part Defects to Supplier End in regular Basis
  • Conducting DRM Meeting in Regular Basis with Production, Quality, PPC Team

Personal Information

  • Father's Name: Govindaraj.A
  • Mother's Name: Dhanabakiyam.G
  • Date of Birth: 11/21/92
  • Gender: Male
  • Nationality: Indian

Languages

  • TAMIL
  • ENGLISH

Disclaimer

I hereby confirm that the information given above is true to the best of my knowledge.

Timeline

Supply Chain Management - Senior Engineer

Solavio Labs Pvt Ltd
04.2020 - Current

Quality Assurance Engineer - Line Incharge

Craftsman Automation Ltd.,
04.2017 - 12.2018

Production Engineer

ELLEN Industries Pvt. Ltd
09.2014 - 04.2016

BACHELOR OF ENGINEERING (MECHANICAL DEPARTMENT) -

Karpagam University

HIGHER SECONDARY -

Gopal Naidu Higher Secondary School

SSLC -

Smt .D. Padmathi Ammal High School
Rajasekar Govindaraj