Summary
Overview
Work History
Education
Skills
Accomplishments
Disclaimer
Certification
Cricket and to learn about new gadgets
Timeline
Generic

Rajesh P Maske

Core Engineer
Nagpur,MH

Summary

Dynamic Telecommunication Engineer with a robust blend of technical expertise and managerial acumen, dedicated to driving operational excellence in competitive environments. Proven success in enhancing system performance and ensuring seamless implementation and maintenance processes while prioritizing customer satisfaction. Committed to leveraging innovative solutions to tackle complex challenges and deliver exceptional results. Passionate about fostering collaborative team environments that promote continuous improvement and growth, contributing significantly to overall organizational success.

Overview

18
18
years of professional experience
3
3
Certifications
1
1
Language

Work History

VVM Core Assistant Manager

Reliance Jio
10.2021 - Current
  • Sound knowledge on IMS, PSBC, ALU MGCF/MGW and GENBAND MGCF/MGW
  • Troubleshooting on fault generated in PSBC &CS core network
  • Experience in dealing with Alcatel lucent MGCF/MGW, Genband MGCF/MGW.
  • Optimization & KPI monitoring of PSBC, MGCF node for circle
  • KPI monitoring of P2P and A2P SMS traffic with POI
  • Established IP POI connectivity with Airtel and Vodafone, Ring central and Zoom POI
  • Coordinating with POI operator for Migration, Augmentation and restoration of Fault.
  • Customer complaint handling
  • Volte and CS core operation (network uptime ASR CCR, Utilization)
  • Monitoring of EGCP trend of MGW for Genband
  • SO6 creation and provisioning of media
  • BSNL POI Port infra-Annual bill processing
  • Updation of MNP psap and ECGI database
  • ICR testing with the other operator.
  • Knowledge of IMS Network CFX TAS SBC, MRF, PCRF and CS Core element MGCF/MGW, GMSC


Planning &Deployment Senior Executive

Airtel
08.2020 - 09.2021
  • Role & Responsibility planning & Deployment in FTTH LCO project rollout
  • Survey in LCO Area as per boundaries provided by business team
  • Plan and identify the OSP route for customer connectivity
  • Deployment of OLT As per the plan
  • Rollout of fiber cable work as per plan in LCO area and installation of FAT Boxes
  • Provisioning of backhaul connectivity over CEN MPLS and NPT media
  • Issue Site instruction to Vendor
  • Co-ordinate with vendor for OLT installation and FAT Box installation
  • Issue and keep track of OSP material Quality on Site
  • Verify FAT Box coordinate on google earth implemented as per plan
  • New city launched in Vidarbha region as per business team requirement

CS Core Switch Senior Engineer

Airtel
06.2016 - 07.2020
  • KPI monitoring of CS core Network in term of Loss Calls on POI ,reduction of cause code
  • Observe in node due media outage or peer end congestion, or inter node issue. Monitoring of Link utilization With STP node.
  • Critical node alarm closure in coordination with BO Team
  • BSC rehoming for boundary correction and base on MSS node Utilization. For same Co-ordinate with Core planning and RF planning team, Vendor team
  • Reduction of customer number complaint related CS network
  • Liaisoning with BSNL for Augmentation , payment invoice related infra /Duct/port and IUC charges
  • Media provisioning for Inter MSC ,Ater Addition for High Utilize BSC ,BICC media provisioning IP connectivity between MSS /MGW
  • Co-ordinate With POI (Idea ,Vodafone ,BSNL ,RJIO ,TATA ) Inter circle as well intra circle for Local connectivity Augmentation base on utilization and provisioning of Media for interconnectivity on TDM
  • Opening of Emergency short code in network in co-ordination Regulatory Team and RA
  • Co-ordinate with Local O&M Team, TX Planning, Fiber planning team ,provisioning team ,Testing team, NOC sys Engineering team NWI Team for Handover with MSS/MGW and to check route feasibility in ring. Mux Installation in Network , Provisioning of Media on SDH ,CEN ,NPT ,MPLS Network
  • Co-ordinate with planning team, BO Team for New MSS/MGW Live in Network
  • Incident management: Raise TT for outages happened within Network and further Analysis Take appropriate Action to minimize outages to maintain 100 % Network uptime
  • Change management for diversity of traffic in ring, hardware up gradation change request raised with NOC Team to reduce outages of BSC
  • Delivery Core IP link DRA, IPV6,S1-MME BICC media

Sr.Executive

TATA Communication NOC –Pune –Maharashtra
08.2011 - 12.2011
  • Role & Responsibility: ILD traffic Performance analysis of ASR ,NER, For Various LCR Destination for Countries Like North America ,Australia ,South East America, Europe ,Asia ,UK in Real Time ,Knowledge of Route server RS ,PSX(Soft switch ) ,GSX(Media-Gateway ),SGX(signaling Gateway),controlling Traffic routing
  • Tool Used: LCR-GTM (Global Traffic Measurement), REGI, REMEADY, RTDAS (for Analysis of ISUP Traces in Real Time),AGILENT(for monitoring A/B-link load)

Executive

Bharti Airtel Limited-Nagpur-Maharashtra
12.2007 - 08.2011
  • Role Responsibility as NLD switch Engineer
  • Application Used:-
  • 1) Metasolv: To raised w/o for provisioning/deactivation of electrical or optical E1 drop for POI
  • 2) BMC Remedy Application for Change-management & incident management
  • 3) ADRS application of NMS
  • 4) Telekec Tool for Traces
  • 5) UGIS portal for fiber cut updation
  • 6) ATOMS Portal for OCN and RA
  • Project Handle:-
  • 1) Remote Access of Optical switches used for switching of optical fiber
  • 2) Moran Project Vodafone BSC Connectivity with Airtel MSS/MGW
  • 3) EWSD NLD switch Migration (180 k Capacity) to Huawei NLD switch G-layer

Education

Degree in Electronics & Communication Engineering -

01.2007

Diploma Engineering in Electronics & Communication Engineering - undefined

MSBTE
01.2004

Intermediate (10+2) - undefined

Maharashtra Board
01.2001

10th - undefined

CBSE Board
01.1999

Skills

Knowledge of CS& IMS core Element, volte Network –SIP, VoIP, SS7, Sigtran, Diameter,POI interconnect ,FTTx Network

Accomplishments

  • Migration of 100/112 traffic on Nagpur, Mumbai and Goa Psap PRI
  • Bifurcation of traffic Incoming/Outgoing with BSNL Cellone and L1 POI
  • Migration of 17 STMI traffic with VIL EOL node
  • Migration of BSNL POI from leased media to owned media in panjm and Kolhapur
  • M2M traffic migration with Airtel POI on Sigtran link
  • Migration of SMS traffic on Sigtran Link
  • 120 BSO fixed connectivity established with BSNL
  • Silver Award' remote monitoring of optical switches'
  • Silver Award' ASR improvement with POI in NLD switch.
  • Award for 'Reduction of Equipment Room Temperature
  • Awarded Central level Circle for NLD switch Migration from EWSD to Huawei Sof switch
  • 101 BSC migration done on IP’s
  • traffic Migration of EOL MSC’s
  • Exceptional contribution in the ROM Circle step-up resolved customer complaints and improved core KPIs.
  • Planning and Deployment of 110 OLT's in Vidharbha Region and Lead from front to Rollout 50k Home connection During pandemic Year

Disclaimer

Date: Place: Nagpur Yours sincerely, Rajesh. P. Maske

Certification

CCNA training at Unisoft Technology

Cricket and to learn about new gadgets

Language:-English,hindi,Marathi  


Project handle:-

*Established New connectivity with BSNL Fixed /L2/L1 and Cellone POI.

*Migration of  101 BSC's from TDM to IP  

*First  IP connectivity with 10K TPS  between JIO and Airtel 

*EWSD switch 180k capacity Migration to Huawei 

*Planning and Deployment of 110 OLT's in Vidharbha Region Roll out 50k Home conection




Timeline

VVM Core Assistant Manager

Reliance Jio
10.2021 - Current

Planning &Deployment Senior Executive

Airtel
08.2020 - 09.2021

CCNA training at Unisoft Technology

07-2016

CS Core Switch Senior Engineer

Airtel
06.2016 - 07.2020

Sr.Executive

TATA Communication NOC –Pune –Maharashtra
08.2011 - 12.2011

Completed the Training Program for NGN customized Basic Training

07-2009

Executive

Bharti Airtel Limited-Nagpur-Maharashtra
12.2007 - 08.2011

Basic telecom engineer Training at BSNL training center

07-2007

Diploma Engineering in Electronics & Communication Engineering - undefined

MSBTE

Intermediate (10+2) - undefined

Maharashtra Board

10th - undefined

CBSE Board

Degree in Electronics & Communication Engineering -

Rajesh P MaskeCore Engineer