Summary
Overview
Work History
Education
Skills
Websites
Timeline
Certification
Passport Details
Personal Information
Disclaimer
Passport Details
Personal Information
Disclaimer
Passport Details
Personal Information
Disclaimer
Generic
Rajkumar Radhakrishnan

Rajkumar Radhakrishnan

Senior Project Engineer & Coordinator
Bangalore

Summary

ABOUT ME:

Result driven and focused project engineer who loves to deep dive into smallest details to determine the correct direction for project planning and technical drawings and to establish precise project specifications. Competent go getter with undeniable technical knowledge, proficient communication and strong foundation in engineering, design and project management. Effective cross team collaborator with proven record of leading projects to on time completion steering through adversities.



Overview

14
14
years of professional experience
1
1
Language
1
1
Certificate

Work History

Senior Project Engineer & Coordinator

Magnus Power Pvt Ltd
2016.01 - Current

Oversee and execute all aspects of delegated projects driving superior customer service and rich and quality experience in Erection, Testing & Commissioning of Electrical systems, Process Control, Project Engineering & Management, Design Engineering Review and Troubleshooting Functions

KEY PROJECTS

113 MW HFO Power Plant Project

Budget: $45M

Team Size: 40 Engineers & 6 Contractors

Methodology/Tools: MS Project

  • Led from project kick off to handing over green field 113 MW HFO Power Plant Project with Wartsila Genset W20V32 Finland Genset over span of 11 months
  • Attained main DG set from Wartsila Finland, waste heat recovery boiler from Alfa Laval Finland, and outdoor AIS substation equipment including power transformer from ABB India
  • Collaborated with client, main equipment manufacturer, and company to report on project progress, aligned with parameters, and utilized Wartsila DCM365 data exchange platform
  • Pre-engineering building construction with design criteria of seismic zone, wind velocity, BNBC codes
  • Equipment erection includes waste heat recovery boiler from Alfa Laval, Steam turbine 3.1MW with 16 bar inlet pressure and 320-degree temperature, HFO/LO separators etc
  • Well conversant with protection schemes of 132KV, 11KV and various interlock logic
  • LT PMCC panel, MCC panel, 11KV SF6 switchgear panel, Twin parallel outgoing breaker panel considering current rating, Fault current limiter on 132KV downstream at 11KV with set point of 22KA for 50ms
  • Line protection panel with line distance and differential as First main and backup protection as other over current and earth fault
  • Transformer protection with transformer differential protection and REF as main protection
  • Conversant with plant and substation earthing requirement
  • Energized 132KV transmission line 5Kms with monopole structure from power plant to Chowmuhoni PGCB 132/33KV grid substation
  • Energized 132/11KV substation with one outgoing bay and two power transformers of 80 MVA from ABB India

30 MW Gas Power Plant, Baloi

  • Expedited project completion by 20% by owning both onshore and offshore contracts and project schedule
  • Monitored and analyzed progress to give early warning signals for delays in procurement and suggested remedial actions for same

WHRB project, Bangladesh

  • Reduced project cost by USD 300,000.00 and brought down project time by 30 days by adopting cost effective ways like in house manufacturing of major auxiliary equipment
  • Drove cross functional activities (commissioning team from Alfa laval Alborg Finland) including planning, monitoring and controlling of project activities right from proposal to commissioning phase of project

OTHER RESPONSIBILITIES

  • Pioneered several changes; initiated tender department and independently led Tender department, participated in Government and Private company tenders:
  • 50MW Gas Power Plant tender, for NTPC Vidyut Vyapar Nigam Ltd in 2022
  • EPC Package supply of Ambient Air heating system tender for Konkan LNG Plant in 2023
  • Involved in (waste to Energy Facility) Torrefaction Facility (MSW to Torrefied Charcoal) along with Waste Segregation system and its integration tender Project Capacity of 400TPD and 200TPD with Technology partner and Manufacture Partner
  • PT Cikarang - 55MW Gas Engine Power Project tender IPP, Indonesia
  • Enlistment of EPC tender for Development of Floating/ Ground Mounted Solar PV Power Projects below 10 MW Capacity of NVVN Ltd

OTHER PROJECTS

  • 55 MW KANCHAN MAN HFO Power Plant
  • 15 MW Flex Americas S.A de C.V., Mexico
  • 10 MW Flex Film Africa Pvt Ltd., Nigeria
  • 30MW Consortium of Maxpower - Cogindo, Batam, Indonesia

Senior Project Engineer

Magnus Power Pvt Ltd
2010.05 - 2016.12

KEY PROJECTS

109 MW HFO Power Plant Project

Budget: $28M

Team Size: 20 Engineers

Technology/Tools: MS Project

  • Collaborated on green field HFO/Diesel Power Plant projects with MAN Germany Genset, heading off project kick off to closure and handing over
  • Guaranteed export power at 132KV terminal 10700KW including co-generation with specific fuel oil consumption of 8100 Kj/KWH
  • Directed EPC scope of work including fabrication of storage tanks, 132 KV switchyard, turbine, boiler, power house, fuel treatment plant, water treatment plant, engine auxiliaries, MV/LV switchgear, UPS system, battery, and battery charger
  • Orchestrated fabrication for 14 storage tanks with highest tank fabricated for HFO storage of 4000KL
  • Organized pre-engineering steel building for power house, administration, workshop, and fuel treatment house
  • Handled laying and termination of power cables, control cable, instrument cable, and communication cables for entire system
  • Developed electrical system including MV 11KV by ABB India with over 17 breaker panels, NGR panels for genset earthing, station transformers to run mechanical auxiliary equipment of 2MVA and 2 Nos supplied by GE Prolec Chennai
  • Coordinated control and relay panel testing and commissioning for 132/11 KV substation with 47, 3MVA power transformers, CT, CVT, isolators, and SF6 circuit breaker from ABB India

3 X 55 MW MAN HFO Power Plant, Bangladesh

  • Led design department with consultant by Sized Mechanical equipment as per OEM recommendation and reduced Project Cost via ordering cables and accessories to Direct Manufacturer
  • Supervised all Electrical Panel, 33kV Substation equipment's and Mechanical Equipment Inspection at Supplier Factory to ensure operational effectiveness of utilities, effectuating maintenance plans
  • Handled logistic and Customs Clearance

OTHER PROJECTS

  • 55 MW DESH MAN Diesel Power Plant Bangladesh

Education

Bachelor of Engineering - Electrical & Electronics

MNM Jain Engineering College
Chennai, India
2006.01 - 2009.01

Diploma - Electrical & Electronics

Thai Moogambigai Polytechnic College
Chennai, India
2003.01 - 2005.01

Skills

Engineering Design

undefined

Timeline

Senior Project Engineer & Coordinator

Magnus Power Pvt Ltd
2016.01 - Current

Senior Project Engineer

Magnus Power Pvt Ltd
2010.05 - 2016.12

Bachelor of Engineering - Electrical & Electronics

MNM Jain Engineering College
2006.01 - 2009.01

Diploma - Electrical & Electronics

Thai Moogambigai Polytechnic College
2003.01 - 2005.01

• Microsoft Project ALL: BEGINNER to EXPERT 10 Projects 9 PDU

Certification

• Microsoft Project ALL: BEGINNER to EXPERT 10 Projects 9 PDU

Passport Details

Z5884227 Valid up to 06/01/2030.

Personal Information

Date of Birth: 09/22/1986

Disclaimer

I hereby declare that above mentioned details are true to the best of my knowledge and belief.

Passport Details

Z5884227 Valid up to 06/01/2030.

Personal Information

Date of Birth: 09/22/1986

Disclaimer

I hereby declare that above mentioned details are true to the best of my knowledge and belief.

Passport Details

Z5884227 Valid up to 06/01/2030.

Personal Information

Date of Birth: 09/22/1986

Disclaimer

I hereby declare that above mentioned details are true to the best of my knowledge and belief.

Rajkumar RadhakrishnanSenior Project Engineer & Coordinator