Summary
Overview
Work History
Education
Skills
Project Highlights
Attributes
Interests
Software
Timeline
Generic
Rajkumar Singh

Rajkumar Singh

Mumbai

Summary

Results-driven professional with a proven track record in all aspects of building services, including MEP, design validation, value engineering, contract finalization, execution, testing and commissioning, and project handover. 25 Years of experience as a Project Manager overseeing multi-Crore rupees construction projects in the Hotel, Hospital, Commercial, and Residential sectors for private-sector clients. Core capabilities in project planning, execution, and engineering, as well as scheduling, manpower and materials management, and defining technical specifications. Dedicated to enhancing productivity, improving decision-making processes, minimizing costs, and maximizing profits. Strong credentials and history of delivering projects on time, within budget, and to the highest quality standards. Eager to take on challenging assignments to continuously learn and contribute to the success of the organization.

Overview

24
24
years of professional experience
8
8
years of post-secondary education
2
2
Languages

Work History

AGM – (MEP) Engineering

K Raheja Corp.
Mumbai
12.2021 - Current
  • Working as a MEP Lead in commercial building of 3.5 Million sq.ft construction area
  • Overlooking an entire service which includes, HVAC, Plumbing, Firefighting, Electrical, DG, HSD, OWC, STP, MGL Gas, Elevators, Mechanical /Smart Parking, FAPA, IBMS, CCTV, Access Control ,ELV,UPS,EV Charging& S olar System.
  • Co-ordination with design consultants for design finalization and value engineering
  • To ensure smooth progress of day-to-day activities of MEP services of the entire project
  • Manage overall project strategy, direction & performance of project
  • Preparation and conducting progress reports & technical meetings for MEP work
  • Reviewing & commenting on MEP Contractors submittals and shop drawings
  • To ensure comprehensive understanding of the contract documents, Construction sequence and project schedule
  • Checking MEP deliverables of project requirements and ensuring achievement of quality standards
  • Managing all RFI’s, change orders, amended submittals and procurement logs
  • Ensuring norms related to green building are getting followed
  • Self-motivated, with a strong sense of personal responsibility.
  • Excellent communication skills, both verbal and written.
  • Skilled at working independently and collaboratively in a team environment.
  • Worked well in a team setting, providing support and guidance.
  • Passionate about learning and committed to continual improvement.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Used strong analytical and problem-solving skills to develop effective solutions for challenging situations.

MEP Manager

Blue Star Ltd
Mumbai
11.2017 - 11.2021
  • Working as MEP Manager – Service, Engineering and Execution work in Projects
  • Overlooking Mechanical ,Electrical ,Fire Fighting ,Plumbing & FAPA works with entire coordination with Architect, Structural, Interior and MEP team
  • Co-ordination of all MEP related activities at project sites and day-to-day operation
  • Increased client satisfaction by consistently delivering high-quality MEP designs and installations.
  • Giving guidance to contractors and subordinates & making sure work quality is as per our requirements
  • Ensuring that contractors prepare shop drawings and obtain approval from MEP/ Project Manager/ Architect before executing the job
  • Ensuring checking of the HVAC, Fire-fighting plumbing drawing, specs, brands quality and giving guidelines to contractors site engineers and Supervisors from time to time
  • Certification of work executed quantities & conduct random checks to certify quality of material
  • Checking the RA bill, final bill quality and quantity inspection site measurement as per the work order
  • Making sure proper design co-ordination being achieved before commencement of work
  • (Collect GFC drawings before starting work)
  • Participation in the design of Firefighting & Plumbing system for residential & commercial projects
  • It includes space planning, concept layout, water demand, Pipe sizing, Pump head calculation, schematic & VFC layout
  • Review of Design basis, technical comparatives, submittals, and layouts from external MEP consultants
  • Ensuring compliance with CFO NOC, MOEF and other statutory regulatory guidelines
  • Designing and liaison of gas pipeline which includes reticulation agreement, vendor finalization and drawing approvals from MGL authorities

Sr. Project Engineer

Empire Engineering Corporation
Mumbai
01.2001 - 10.2007
  • Worked as Sr
  • Project Engineer for HVAC projects, Performed a role of Site-In charge of HVAC project for BARC ,RBI,BEST , hotel and commercial buildings
  • Responsible for the review of BOQ and tender documents for the purpose of complete familiarization of assigned projects
  • Preparation of Technical bid comparison and Vendor offer evaluation
  • Vendor management from kick off meeting until handover of the project
  • Checking of contractor bill and ensuring timely payment
  • Maintaining positive cash flow by raising and certifying RA bills and collection of payment from clients
  • Providing resolution of all site issues by involving & coordinating all stakeholders at site level like civil, finishing, structural, architect and consultants
  • Responsible for Material planning, budgeting, monitoring, and controlling the entire execution and handover project on time
  • Managing all RFI’s, change orders, amended submittals and procurement logs and ensuring all project team members are informed of this information
  • Ensuring an acceptable profit level by completing the assigned project within or below the estimated budget

Education

MBA -

International MBA: Two Years Corse
Ural Federal University
06.2017 - 06.2019

Auto CAD -

Govt Polytechnic ,Bandra
Mumbai, India
01.2002 - 03.2002

Diploma In Mechanical Engineering -

IME (India)
Mumbai, India
07.1997 - 03.2000

SSC -

Allahabad Board
UP
07.1994 - 04.1996

HSC -

Allahabad Board
UP
07.1992 - 04.1994

Skills

  • Project Management

  • ELV/UPS

  • Site Safety

  • MEP

  • Water Body

  • QA/QC/Field Engineering

  • MGL Gas

  • Steam Bath

  • Change Order Management

  • HSD Yard

  • BGM/Video Wall

  • Labor Management

  • Elevator

  • Bollard/Boom Barrier

  • Budgeting & Cost Controls

  • Smart car Parking

  • Baggage Scanner

  • Clear Communication Abilities

  • DG

  • IBMS

  • Subcontractor

  • STP

  • FAPA/CCTV/ACS

  • Crew Supervision

  • OWC

  • Smoke Vent Window

  • Project Control and Reporting

  • Solar System

  • BMU

  • HOTO

Project Highlights

  • NRPP - BARC- Tarapur, Turnkey project Design Supply, 2001 - 2002, 50-Lacs, Installation testing of HVAC system of entire building, 40 TR capacity.
  • RLG-BARC- Air conditioning system, 2003 - 2004, 50 Lacs, 11TR x 19Nos Package units, Model - 132S.
  • BARC Praful 1 Project, 2004 - 2006, 125 Lacs, AC and Ventilation system consisting of AHU Blower, Cooling coil, MS Duct, GI Duct Insulation, MS & SS Piping. Plant capacity 230 TR.
  • Oberoi Mall, 2007 - 2008, 12 CR, Capacity 2100 TR.
  • Oberoi commerce & Hotel, 2007 - 2010, 17 CR, Capacity 3000 TR.
  • Oberoi International school, 2007 - 2010, 9 CR, Capacity 650 TR.
  • D B Mall (Bhopal), 2009 - 2009, 8 CR, Capacity 2400 TR.
  • Ashima Mall (Bhopal), 2009 - 2009, 7 CR, Capacity 1500 TR.
  • Indiabulls Elphinston-1, 2009 - 2011, 5 CR, Capacity 1350 TR.
  • Aswani RPS BMC Warli, 2009 - 2011, 6 CR, Capacity 1450 TR.
  • Indiabulls Elphinston-2&3, 2010 - 2011, 22 CR, Capacity 5500 TR.
  • J.W. Marriott Hotel, 2011 - 2015, 28 CR, (Sahara Airport) Capacity 2170 TR.
  • J.W. Marriott Hotel, 2014 - 2016, 12 CR, (Retal Block (MEP) (Sahara Airport).
  • Bhagubai college, 2013 - 2015, 6 CR, (Mumbai) Capacity 900 TR.
  • Indospace PVT LTD., 2014 - 2015, 6 CR, (Pune.) Capacity 825 TR.
  • Omkar 1973, 2016 - 2018, 100 CR, (Worli projects) Capacity 3675 TR.
  • Apollo Hospital, 2018 - 2019, 4 CR, (New Mumbai) -MEP.
  • CtrlS Data center M&P, 2018 - 2021, 7 CR, (New Mumbai).
  • Radisson Blu Nasik, 2019 - 2021, 17 CR, M&P.
  • Mass Hotel Mumbai, 2019 - 2021, 7 CR, HVAC.
  • Yotta Data center-HVAC, 2019 - 2021, 18 CR, Ponvel.
  • Indiabulls New IFC, 2018 - 2020, 33 CR, (New Mumbai) - MEP.
  • Lodha T4 Mumbai -MEP, 2020 - 2021, 60 CR.
  • Altimus Siemens Worli, 2021 - Present, 836 CR., (K Raheja Corp.)

Attributes

Hindi, English, Microsoft Office (Word, Excel, PowerPoint Presentations), Basic knowledge of AutoCAD, SAP

Interests

Playing & Watching Games

Watching NEWS

Social Activities

Software

MS Word ,MS Excel , Power Point ,SAP ,Auto CAD

Timeline

AGM – (MEP) Engineering

K Raheja Corp.
12.2021 - Current

MEP Manager

Blue Star Ltd
11.2017 - 11.2021

MBA -

International MBA: Two Years Corse
06.2017 - 06.2019

Auto CAD -

Govt Polytechnic ,Bandra
01.2002 - 03.2002

Sr. Project Engineer

Empire Engineering Corporation
01.2001 - 10.2007

Diploma In Mechanical Engineering -

IME (India)
07.1997 - 03.2000

SSC -

Allahabad Board
07.1994 - 04.1996

HSC -

Allahabad Board
07.1992 - 04.1994
Rajkumar Singh