Professional Engineer (Registration No PE/00075/23) with specialization in Supervision, Installation, Testing and Commissioning. I have 20+ years of Experiences in Various Projects/ Sectors like Substation, Petrochemical Plants, Oil & Gas, Infrastructure Development, Water Treatment & Sewage Treatment Plants, Construction (Villas & Hospitals). I hold Middle East Experiences of 15 years & Indian Experience of 5 years.
Client/Contractor : QAPCO - Kharama / L&T Qatar
PROJECTS: (E&I Network Up gradation Project)
· Electrical , Instrumentation & Telecom Systems Works - QAPCO / Kharama
SCOPE:
· Construction Supervision, Inspection, Testing, Pre-commissioning and Commissioning, Shutdown , Operation & Maintenance Works
Key Deliverables:
· Construction Supervision and Monitor Installation of all Electrical, Instrumentation and Telecom Systems
· Installation of 132kv Gas Insulated Switchgear Systems – Hyousung Make( as per Kahramaa Electricity Specification)
· Installation Telecom / Metering and Control Rooms ( as per Kahramaa Electricity Specification)
· 100MVA 132kv/33kv Power transformers – GE Make ( as per Kahramaa Electricity Specification)
· 132kv / 33kv / 6.6kv cable laying systems - Doha Cables ( as per Kahramaa Electricity Specification)
· MV, LV Systems – Switchgear- Siemens Make (( as per Kahramaa Electricity Specification / QAPCO Standards)
· Fire Alarm System, Public Address System, SCADA Systems, Substation Automation Systems, Earthing Systems
· Supervision, Inspection, Testing, Pre-commissioning and Commissioning testing of PV Systems
· Supervise and Monitor Installation of Instruments (PT, FT, FCV, MOV, PG, Temperature Scanner Panels, Vibration
Sensors, Vibration Monitoring Panels (VMS), Analyser’s, Level Transmitters, DPT, DPG, Level Gauges, Pneumatic
Valve, Actuators, ESD Systems,HART, Loop check)
Client/Contractor : ADNOC Onshore (Qusahwira Oil Field Development) / Petrofac, Galfar, CPEC,NBTC
PROJECTS: (Petrochemical, Oil & Gas Projects, Well Pads, Compressors Gas Lift & Injection, Pipeline CP)
· Electrical , Instrumentation & Telecom Systems Works - Completion of Qusahwira Phase-II Oil Field Development / Mender/Shah & Borouge Petrochemical Plant Construction Project Works
· Completion of Oil Production Wells Gas Lift, Gas Injection, Water Alternate Gas /Completion of 9 Well pads
· Completion of gas lift and gas compression facilities at CDS- Central Degassing Station
SCOPE:
· IPMT (Construction Supervision, Inspection, Testing, Pre-commissioning and Commissioning, Shutdown Works)
Key Deliverables:
· Construction works at Borouge Petrochemical Plant E&I Works(Substation, SIS, Process Building, Peroxide Building,
Packaging, Silos, Soaking Tower, )
· Installation of HV & LV Switchgears, Power & Distribution Transformers, Generators, LV & HV Power Cables
· New Substation Building(s) and Power Supply Skids (Siemens Make) ,
· New 33kV OHL Distribution System & 33kV MV Main Switchgear
· New 33/34.5kV(16/20MVA), 33/11.5Kv (16MVA) and 33/3.45kV Power Transformers ,33/0.433kV, 11/0.433kV and
3.3/0.433kV Distribution Transformers (Federal Transformers)
· New 11kV and 3.3kV Switchgear – Modification & New Motors 11kv, 8MW Gas Lift & 6MW Gas Injection Compressor
(Neumann & Essar Make)
· AC Uninterrupted Power Supply (UPS) System, AC/DC Uninterrupted Power Supply (UPS) System Battery Bank
· Neutral Earthing Resistors (NER) Capacitors / Harmonic filters Solar Power Systems Local Push button Stations
· Inspection of HV, MV, LV Power Cable 1.1 KV, 3.3kv,6.6kv ,11 KV, 33kv, Installation & SAT
· Cable Glanding, Termination, Continuity test, Insulation Resistance test, Hi-Pot test, Ductor test, Primary & Secondary
Injection Test
· Cathodic Protection Systems (A/G, U/G Plant Piping, Well Casing, Tank Internal/External & Vessel Internal
· Supervise and Monitor Installation of Instrumentation Cables (Control Cable & IS Cables)
· Supervision, Inspection, Testing, Pre-commissioning and Commissioning testing of Agile Europe Make PV Modules Projects for ADNOC Onshore (Oil Producer / WAG Well/ WI Well/ Cathodic Protection)
· Supervise and Monitor Installation of Instruments (PT, FT, FCV, MOV, PG, Temperature Scanner Panels, Vibration
Sensors, Vibration Monitoring Panels (VMS), Analyser’s, Level Transmitters, DPT, DPG, Level Gauges, Pneumatic
Valve, Actuators, ESD Systems,HART, Loop check)
Witness, Testing of Foc Cables with OTDR (Single Mode /Multi Mode)
Client/Contractor : ONGC (Mangalore Refinery & Petrochemical Limited ) /Vatech Wabag
PROJECTS:(Petrochemical, Oil & Gas Projects, Water Treatment , Sewage Treatment, Pumping Stations)
· 70MLD Desalination Project / Mangalore Refinery & Petrochemical Works (Upper Plateau, Lower Plateau, Demineralization, Remineralization, Substation & Control Room)
SCOPE:
· PMC (Construction Supervision, Inspection, Testing, Pre-commissioning and Commissioning, Shutdown Works)
Key Deliverables:
· 220kv/ 300MVA - Electrical Substation Works(AIR Insulated Substation, Gas Insulated Substation)
· Supervise & Witness Installation of Potential Transformers, Isolators, Current Transformers
· Supervise & Witness Installation of Power Transformer- 220KV/11KV/6.6 KV, 30 MVA
· Distribution Transformer – 11kv/ 430 V Systems & VFD Transformer – 6.6kv/690V Systems
· GIS Switchgear -11 KV, 6.6KV Systems Installation & SAT
· HV, MV, LV Motors , Power Cable & Control Cables 1.1 KV, 11 KV, 6.6kv, 690V Installation & SAT
· Supervision, Inspection, Testing, Pre-commissioning and Commissioning testing of PV Systems (200KW)
· Fire Alarm System, Public Address System, SCADA Systems, Substation Automation System
· Supervise and Monitor Installation of Instruments (PT, FT, FCV, MOV, PG, Temperature Scanner Panels, Vibration
Sensors, Vibration Monitoring Panels(VMS),Analyser’s, Level Transmitters, DPT, DPG, Level Gauges, Pneumatic Valve,
Actuators, ESD Systems, F&G Systems, HART, Loop check
Client/Contractor : ADNOC (Takreer)- Ruwais
PROJECTS:( Oil & Gas, Refinery Projects, Water Treatment , Sewage Treatment, Pumping Stations)
· Ruwais Refinery Shutdown Project – RRW (Brown Field)
· Crude Flexibility Construction Project(Green Field – North Zone, Utility & South Zone)
SCOPE:
Third Party Inspection & Certification, Supervision, Inspection, Testing , Pre-commissioning, and Commissioning
Key Deliverables:
· Electrical Substation Works, Transformer- 220KV/132 KV, 130MVA, 132/33 KV, 10 MVA, 33/11KV & 11/0.433
· Switchgear -1.1KV, 11 KV, 33 KV ,132KV & 220KV GIS Systems Installation & SAT
· HV, MV, LV Power Cable 1.1 KV, 11 KV, 33 KV, 220KV Installation & SAT
· Supervision, Inspection, Testing, Pre-commissioning and Commissioning testing of PV Systems
· Supervise and Monitor Installation of Instruments (PT, FT, FCV, MOV, PG, Temperature Scanner Panels, Vibration
Sensors, Vibration Monitoring Panels (VMS), Analyser’s, Level Transmitters, DPT, DPG, Level Gauges, Pneumatic
Valve, Actuators, ESD Systems, F&G Systems, HART, Loop check
Client/Contractor : MOH, SECO
PROJECTS:(MOH Development Projects, SECO Projects, Water Treatment & Sewage Treatment Plants)
SCOPE:
· PMC (Construction Supervision, Inspection, Testing, Pre-commissioning and Commissioning, O&M Shutdown Works)
Key Deliverables:
· 17.5kv Package Substation,17.5kv Unit Substation, 17.5kv Ring Main Unit, HV Switchgears, LV Switchgears,
· 1 MVA,1.5MVA,0.5 MVA Transformers,350 kva Generators,250 kva Generators, Lighting Systems, MCC & PCC, UPS,
Grounding Systems, HVAC Systems
· Supervision, Inspection, Testing, Pre-commissioning and Commissioning testing of PV Systems
· Laying of MV&LV Power Cables, Fiber Optic Cables, Low Current Systems,
Fire Alarm Systems, Electrical and control works for Water Treatment, Sewage Treatment Plant, SLS
CLIENT : ADCO (Abu Dhabi Company for Onshore Oil Operation) –UAE
ADCOP (Abu Dhabi Crude Oil Pipeline-Pumping Stations)-UAE
PROJECTS:( Oil & Gas Projects, Water Treatment , Sewage Treatment, Pumping Stations)
· Electrical and Instrumentation Works for 13clusters in ADCO Facilities (Dhabiya & Rumaitha)
· Abu Dhabi Crude Oil Pipeline-Pumping Stations Electrical Works
SCOPE:
· PMC (Construction Supervision, Inspection, Testing, Pre-commissioning and Commissioning, O&M Shutdown Works)
Key Deliverables:
· 11/0.415 kv Substations,6.6 kv Switchgears, 415 V Switchgears &
· 6.6 kv / 0.415 kv, 2500KVA Transformer,6.6 kv / 0.415 kv, 400KVA Package Substation
· AHU'S, Solar Panel Systems, Sensor Tower, Grounding System, Lighting Systems, Fire Alarm Systems, Fiber optic
cables (72c, 36c, 6c ,4c) using OTDR (optical time-domain Reflectometer)
Sensor, Smart fence Systems, Anti-Terror Barrier, Vertical Arm Barrier, Security
CLIENT : Ministry of Health, Saudi Electricity Company
PROJECTS:(Electrical Shutdown Projects, Hospital Construction Projects – KSA, Substation construction projects)
SCOPE:
· Construction Supervision, Inspection, Testing, Pre-commissioning and Commissioning, O&M Shutdown Works
Key Deliverables:
· 13.8kv Substation ,13.8kv RMU, HV & LV Switchgears, 2500KVA,1600 KVA and 800 KVA,13.8kv/380 V transformers
· 1040 KVA, 380V , 3 Phase Synchronization System of 8 Generators & 2 Feeders with ISNT & IMNT Controller (ComAp
Systems- Saudi Arabia)
· 1100 KVA, 13.8 kv, 3 Phase Synchronization System of 3 Generators+BTB+2 Mains with ISNT & IMNT Controller
· Supervision, Inspection, Testing, Pre-commissioning and Commissioning testing of PV Systems
· 380V ATS System & Distribution Panel with IMNT Controller (ComAp Systems- KSA)
Electrical and control works for Water Treatment, Sewage Treatment Plant, Sewage Lifting Station
CLIENT : BSNL
PROJECTS: (Electrical & Control works for BSNL Projects)
SCOPE:
· Construction Supervision and Inspection
Key Deliverables:
· 11kv Switchgears, 415V Switchgears, MCC& PCC,1600 KVA Transformers, 742 KVA Generator
· UPS Systems, Grounding Systems, Motors, Cables, AMF Panels
Supervision, Inspection, Testing, Pre-commissioning and Commissioning testing of PV Systems