Checking of traverse survey to fix-2 Dimensional co-ordinates on traverse stations using Total Station Instruments
Checking of Alignment of road including horizontal curves with 2-Dimensional co-ordinates
Checking levels of different Structure of Building
Checking of Foundation Level and Layout of Different structure
Adhere to project requirements and make sure that contractor are maintain Continually monitor progress and resource level Review of Plan and Profile drawings as well as utility design and layouts submitted by the Contractor
Communication requirements Liaison with Project Manager on progress and issues Regular liaison with other work unit coordinators Liaison with key stakeholders as required.
Sr Surveyor
AECOM India PVT LTD
04.2015 - 09.2016
Adhere to project requirements and make sure that contractor are maintain Continually monitor progress and resource level Supervise the work
Checking and monitoring Highway and Utilities related RFI raised by contractor Attend meetings with contractor as required
Checking of temporary benchmarks
Checking of traverse survey to fix-2 Dimensional co-ordinates on traverse stations using Total Station Instruments
Checking of Alignment of road including horizontal curves with 2-Dimensional co-ordinates
Checking levels of different pavement layers of site
Checking of pile group & pile cap and pier cap Layout of Flyover and Metro line.
Surveyor
PARSONS BRINCKERHOFF INDIA (PVT.) LTD.
12.2012 - 04.2015
Checking of temporary benchmarks
Checking of traverse survey to fix-2 Dimensional co-ordinates on traverse stations using Total Station Instruments
Checking of Alignment of road including horizontal curves with 2-Dimensional co-ordinates
Checking levels of different pavement layers of site
Checking of pile group & pile cap and pier cap Layout of Flyover and Metro Line.
Senior Surveyor
ORIENTAL STRUCTURAL ENGINEERS (P.) LTD.
01.2010 - 11.2012
Fixing levels on temporary benchmarks using auto level instruction
Carrying out traverse survey to fix-2 Dimensional co-ordinates on traverse stations using Total Station Instruments
Setting out of Alignment of road including horizontal curves with 2-Dimensional co-ordinates
Checking levels of different pavement layers of site
Laying of the DLC & PQC With (15.7 Mt
Width) With Paver Laying of the kerb & Shoulder Drain with Paver Construction of Toe Drain
Surveyor
LEIGHTON CONTRACTORS INDIA PVT. LTD.
10.2006 - 12.2009
Fixing levels on temporary benchmarks using auto level instruction
Carrying out traverse survey to fix-2 Dimensional co-ordinates on traverse stations using Total Station Instruments
Setting out of Alignment of major bridge, culverts, road including horizontal curves with 2-Dimensional co-ordinates
Checking Tilt and Shift of well foundation Bridges with 3-Dimensional co-ordinates at different stages of construction
Checking levels of different pavement layers of site
Taking out co-ordinates & levels of borrow areas
Recording and providing levels on string wire execution of D.B.M., BC & Kerb marketing etc
Layout of the TOLL PLAZA Building
Layout & laying of the PCC & PQC
Line &Level SG Top, GSB.
Surveyor
SRC Architect (P) Ltd. & Rites Ltd JV
07.2005 - 10.2006
Topography Survey Carrying out traverse survey to fix 2-Dimentional co-ordinates on traverse stations using Total Station Instrumentations
Contouring of land
Prepared L-section & cross-section of as per site
Fixing levels on temporary benchmarks using auto level instruction.
Education
Institute of Engineering And Technology
Skills
Strategic Planning
Contract Management
Performance Management
Qualification Profile
Matriculation (SCI) from UP Board. (1998), Intermediate (PCM) UP Board. (2000), Diploma in Surveying (2005) From GITI Agra, B.Tech -Civil Engineering (2009) UPTU Lucknow, Diploma in Auto CAD (2007) From IT.com Agra
Job Profile
Design of horizontal curves as per the existing site conditions also design of realignments to eliminate dangerous curves & topographical survey. Fixing of closed Traverse along the Project with respect to the G.P.S. Stations. Fixing of Alignment and taking Cross Sections for getting original ground levels. Collecting Survey data from existing Cross Drainage Structures. Fixing Alignment & Internal points for new Structures. Design of invert levels and top levels of side drains. Adhere to project requirements and make sure that contractor is maintain. Continually monitor progress and resource level. Review of Plan and Profile drawings as well as utility design and layouts submitted by the Contractor. Supervise the work. Checking and monitoring Highway and Utilities and depute subordinates to check related RFI raised by contractor. Attend meetings with client and contractor as required. Checking and reviewing relevant design submissions and variations by the contractor. Supervising Maintenance activities for the stretch under Traffic operation. Preparing and documenting necessary reports as per requirements of Contract.
Key Experience
I have 18 Year Professional experience in field of Survey, Civil (Execution) Building, Urban infrastructure, Metro and Highway works. I got a rich experience in many types of survey works like Plane Table, Leveling, UTM survey and Contouring. Centerline marking, traversing with total station, traversing calculation. Fixing of benchmarks, setting out of reference point, design of super elevation. I was also involved in Conducting Topographical Surveys. The range of instruments for survey work was “Total Station’’ (Different models of, LEICA & NIKON, SOKKIA & TOPCON) ‘Auto level’ etc. Apart from the above involved on Urban Infrastructure Project Sewer Line, Storm Water, Water supply, Gas line & Electric line etc, road project ranged between Flexible Pavement Earthwork, GSB, WMM, DBM, BC, and Rigid Pavement (PQC & DLC), Building-Structural & Architectural and finishing work and Metro-Underground Station Structural and Finishing.
Father's Name
Shri Manik Chand
Accept Salary
negotiable
Personal Information
Current CTC: 12 lac/-Annum + 2 lacs/-Flexible
Notice Period: 2 Month
Date of Birth: 08/15/83
Gender: Male
Nationality: Indian
Marital Status: Married
Religion: Hindu
Disclaimer
I hereby declare that information furnished above is true to best of my knowledge and belief.
Senior Manager ( Civil Engineer ) – Head of Civil Engineering Unit at FGV Palm Industries Sdn . Bhd.Senior Manager ( Civil Engineer ) – Head of Civil Engineering Unit at FGV Palm Industries Sdn . Bhd.