Ramachandran Mannankatti

Timisoara

Overview

18
18
years of professional experience

Work History

Electrical Installation Engineer

Audiotech Multimedia Group SRL
Bucuresti
02.2025 - Current
  • Installation, Testing and Commissioning of Power & Lighting Distribution Boards, earthing system, power & lighting system, cable tray, MV/LV Cable, pumps, Diesel generators, Lightening system & Heating system.
  • Installation, Testing and Commissioning of Fire alarm system & fire damper, door access, Anti-burglary system, CCTV, Intercom, Rack, telecom, TV, Internet, Thermostat temperature controller, UPS, handicap alarm system.
  • Design, develop, and maintain electrical systems and layouts.
  • Review and approve construction drawings and technical proposals.
  • Coordinate with project teams, contractors, and clients.
  • Inspect electrical materials, equipment, and installation.
  • Prepare and review technical documentation, reports, and as-built drawings.
  • Preparation of daily progress reports and site documentation.
  • Quantity estimation and material planning.
  • Execution and supervision of electrical installation work at site.
  • Ensure installation follows technical drawings and electrical standards.
  • Ensure compliance with site safety regulations.
  • Ensuring work is executed as per safety standards and project timeline.
  • Bucuresti - Romania (Eastern Europe)

Electrical Superintendent Engineer

Othman Saleh AL- Ghamdi Trading & Contracting
Jubail
09.2020 - 04.2023
  • Having experience in LV/MV Electrical Equipment Installation, Testing and Commissioning of LV/MCC panels, MDB, SMDB, DB, Power transformer, Busbar instruments (CT & PT), fire and water pumps, Diesel generators and MV & LV Cable works.
  • Preparation of Shop drawing and as-built drawings in AutoCAD, its submittal and obtaining client, consultant and Authority approvals.
  • Review and check Shop drawing, technical analysis and specifications, Preparing Load schedule, Prepare and monitor Engineering documents.
  • Selection and calculation of LV/MV electrical equipment- cable size, circuit breaker size, voltage drop, lighting & power load calculation.
  • Testing of LV/MV Cables, Grounding & Earthing systems.
  • Preparing of work progress reports.
  • Jubail - Saudi Arabia.

Electrical Technical Engineer

Manazel Construction co
Riyadh
07.2019 - 08.2020
  • Preparation of QA/QC documents such as RFI, MOS, ITP, WIR, MAR, MIR,etc.
  • Preparation of Shop drawing and as-built drawings in AutoCAD, its submittal and obtaining client, consultant and Authority approvals.
  • Review and check Shop drawing, technical analysis and specifications, Preparing Load schedule, Prepare and monitor Engineering documents.
  • Riyadh - Saudi Arabia.

Electrical Engineer

Al Tasnim Enterprises
01.2017 - 02.2018
  • Oman

Electrical Engineer

BT Applied Technology
09.2012 - 09.2014
  • Saudi Arabia

Electrical Site Engineer

Reliable Power Solution
05.2008 - 05.2011
  • India

Timeline

Electrical Installation Engineer

Audiotech Multimedia Group SRL
02.2025 - Current

Electrical Superintendent Engineer

Othman Saleh AL- Ghamdi Trading & Contracting
09.2020 - 04.2023

Electrical Technical Engineer

Manazel Construction co
07.2019 - 08.2020

Electrical Engineer

Al Tasnim Enterprises
01.2017 - 02.2018

Electrical Engineer

BT Applied Technology
09.2012 - 09.2014

Electrical Site Engineer

Reliable Power Solution
05.2008 - 05.2011