Summary
Overview
Work History
Education
Skills
Professional Recognition
Publications
Accomplishments
Affiliations
Timeline
Generic
RAMAN BAJPAI

RAMAN BAJPAI

General Manager, Electrical & Instrumentation Engg.
Hirakud,

Summary

Accomplished leader with 20+ years of specialized experience in power generation systems, electrical infrastructure, and industrial automation. Demonstrated expertise in managing multi-crore renovation projects, implementing energy efficiency initiatives, and establishing robust maintenance protocols that minimize downtime and enhance operational reliability. Recognized troubleshooting expert with proven ability to resolve complex technical challenges across multiple plant locations. Recipient of the Star Mentor Award from Hindalco Industries' Managing Director for exceptional technical leadership.

Professional managerial candidate with deep understanding of operational excellence and team leadership. Proven ability to drive growth and enhance productivity through strategic planning and effective resource management. Emphasizes collaboration and adaptability to meet organizational goals, showcasing excellent problem-solving and decision-making abilities. Esteemed member of CIGRE-Paris

Overview

20
20
years of professional experience

Work History

General Manager - Department Head (E&I)

HINDALCO INDUSTRIES LTD. - Aditya Birla Group Flagship Company
05.2008 - Current
  • Led comprehensive Electrical and Instrumentation operations for an 477.5 MW captive power plant with 05 nos. Turbo-Generator units. Directed capital projects, maintenance activities, and system upgrades while managing technical teams across multiple locations.
  • Instrumental in leading the Power Plant towards 100% Reliability and thus ensuring Zero Tripping.
  • Speraheaded various Reliability Projects and Maintenance Practices which resulted in achieving 100% reliability of the VFD System, DCS, CILMS, Protection Relaying System and High Voltage System.
  • Achieved zero motor failures due to electrical faults in FY'23 through implementation of advanced protection schemes
  • Directed protection system coordination and testing for diverse equipment (ABB, GE, SIEMENS, Easun Reyrolle)
  • Oversaw erection and commissioning of 400/220 kV switchyard infrastructure, Inter Connecting transformers, and Protection System and integration to CILMS system.
  • Managed transition from legacy protection systems to state-of-art numerical protection platforms
  • Trained personnel in equipment maintenance and enforced participation in exercises focused on developing key skills.
  • Monitored financial performance, set budgets and controlled expenses to provide financial stability and long-term organizational growth.
  • Increased overall company efficiency by streamlining operations and implementing innovative managerial strategies.
  • Implemented effective cost-saving measures to reduce overhead expenses without compromising quality or service.

Assistant General Manager

Hindalco Industries Ltd- Renusagar Power Division
07.2022 - 10.2024

Effectively managed Total Electrical and Instrumentation Renovation and Modernization of Turbo Generator Unit #1 and Unit #2 with approximately 120 crore capital expenditure.

Competently directed Total Electrical and Instrumentation Renovation and Modernization of Turbo Generator Unit #5, adhering to Cap-Ex of 56 Crore.

Coordinated procurement, assembly, and commissioning of electrical and instrumentation system for 7.5 KM aerial ropeway and belt pipe conveyor system with CapEx of 20 crore for coal transportation through mines.

Pivotal role in rectifying extensive winding failure in 100 MVA generator in record timeframe of 21 days, allowing generation with reduced outage, preserving Rs. 260 Cr

Protection relays testing, coordination, and protection planning of the captive power plant (829.5 MW, 10 units) of Hindalco Industries Ltd. Of various makes (ABB, GE, SIEMENS, Easun Reyrolle, etc.), intra-plant communication, and maintenance of the Automatic Voltage Regulator (AVR) of Siemens, ABB, and GE.

Facilitated erection and commissioning of 132 kV switch yard, transformers, CT, PT, PLCC, VFD drives, PLC, and 132 kV bus bar differential system involving 32 buses

Installation and commissioning of PLC panels (SIEMENS S5-S7), programming, and VFDs (SIEMENS, SIEI, YASKAWA) rated at 1000 kW capacity.

Oversee maintenance of 132 kV substation power transformers and associated accessories, including circuit breakers (SF6, VCBs).

Established Disturbance Fault Recorder (DFR) for assessment and planning of relay settings aimed at avoiding blackout at Hindalco Industries Limited

Commissioned numerous UPS units of Emerson with associated battery banks, Commissioned 48 battery banks with rating ranges from 65 Ah to 1,820 Ah.

Commissioned Solar panels and micro hydro generators for renewable energy.

Reduction of the auxiliary consumption of the plant by using Variable Frequency Drives (VFDs) wherever necessary at Hindalco Industries Limited.

Sr.Manager

Hindalco Industries Ltd-Renusagar Power Plant
07.2017 - 07.2024
  • Implemented and developed operational standards, policies and procedures.
  • Provided strong leadership to enhance team productivity and morale.
  • Led cross-functional teams to achieve project milestones and deliver high-quality results.
  • Collaborated closely with peers from other departments to drive organizational success jointly as one cohesive unit.

- Commissioned Disturbance Fault Recorder of Easun Reyrolle make in record 10 days for analysing the effects during the faults occurring in the power system which starts from Renusagar which is providing electricity (829.5 MW) to Hindalco Renukoot over a distance of 35 kM.After studying the reports generated by DFR, settings of various Protection relays were changed due to which Blackout was prevented.

Reduction of the auxiliary consumption of plant by using Variable Frequency drives (VFD’s) wherever necessary at Hindalco Industries Limited

- Pivotal in the installation and commissioning of DG sets, various sub-stations, transmission towers and lines, cables etc.

- Installed Complete PLC System for Coal Handling Plant#4 and minimising the outage time of Plant.

- Studied the effects of jerk, and then planned to reduce it at the turbo generator at Hindalco Industries Ltd., thus preventing the machine from tripping.

Reduction to Zero Boiler tripping due to Tripping of VFD’s of ID, PA, and FD Fan

Due to efficient Maintenance Practices saved approximately 21 Crores by reducing Unit Tripping due to VFD’s,UPS,Relay coordination etc

- Taking adequate measures to monitor and analyze the performance of transporters pertaining to cost, quality and delivery norms.

Carrying out Isolation, decontamination, re commissioning, preventive maintenance schedules of equipments and instruments to increase their reliability.

Proactively identifying areas of obstruction/breakdowns and taking steps to rectify the machines through application of trouble shooting tools.


Manager

Hindalco Industries Ltd
07.2013 - 07.2017
  • Accomplished multiple tasks within established timeframes.
  • Maximized performance by monitoring daily activities and mentoring team members.
  • Cross-trained existing employees to maximize team agility and performance.
  • Carried out testing of the station battery, battery charger, UPS, etc.
  • Maintenance of VFDs of various makes, like Siemens, L&T, and SIEI, of various capacities for PA, ID, and FD fans.
  • Executed programming and maintenance of Siemens, Rockwell Automation PLCs, and ABB PLCCs.
  • Calibration of multiple types of meters, transducers, etc. executed preventive maintenance on power transformers (132/33kV, 48MVA, 11/33kV, 33/3.3kV, 3.3/.415kV)


Deputy Manager

Hindalco Industries Limited
07.2010 - 07.2013
  • Improved team efficiency by streamlining processes and implementing innovative management strategies.
  • Identified areas for improvement within the department, implementing strategic initiatives to address gaps in performance or resources.
  • Completed extensive testing of protection relays across multiple functions during Turbo-Generator shutdown. Tested generator protection, distance protection, feeder protection, and bus-bar differential protection. Carried out various interlock tests to validate operational integrity.
  • Executed extensive inspection of AVRs from diverse manufacturers.
  • Executed comprehensive testing on GE 76 MW, SIEMENS 88 MW, ABB 80 MW, and Kraftwerk Union 80 MW generators during scheduled shutdown. Completed multiple interlock tests to verify system integrity and functionality.

Assistant Manager

Hindalco Industries Ltd
05.2008 - 07.2010
  • Promoted teamwork within the workplace by encouraging collaboration among staff members on various project tasks.
  • Collaborated with the management team to develop strategic plans for business growth and improvement.
  • Commissioned numerous UPS of Emerson make of 2 x 135kVA, 6 x 120 kVA, 4 x40 kVA with associated battery banks.
  • Spearheaded commissioning of 48 Battery Banks across rating ranges of 65 Ah to 1820 Ah.
  • Executed installation of solar panels alongside micro hydro generator to optimize renewable energy generation.
  • Conducted VFD deployment for Ash Plant Compressors aimed at optimizing energy savings.
  • Commissioned Energy Management System for Renukoot Plant, enhancing operational efficiency. Implemented Fast Bus Changeover System to ensure uninterrupted power supply. Established 132 kV Bus-Bar Differential System for improved fault detection and reliability.
  • Identifying potential performance bottlenecks and executing corrective actions to eliminate risks

Executive

SIEMENS LTD., BANGALORE
01.2008 - 04.2008
  • Provided specialized technical support for power distribution and control systems at Bangalore International Airport during critical pre-launch phase.
  • Enhanced customer satisfaction by streamlining communication channels and improving response times.
  • Developed innovative solutions to complex problems, resulting in improved organizational performance.
  • Mentored junior staff members for accelerated career growth, developing future leaders within the organization.
  • Optimized operational efficiency by redesigning processes, systems, and workspaces for increased productivity.
  • Managed cross-functional teams for successful project completion within budgetary constraints and deadlines.

Engineer

HEG LIMITED, MANDIDEEP
08.2006 - 01.2008
  • Managed maintenance operations for 132 kV sub-station infrastructure, power transformers, circuit breakers, and industrial equipment including EOT cranes and CNC machines.
  • Responsible for maintaining the Reid Hammer, Graphite Anode Plant Maintenance and its reliability.
  • Improved Maintenance practices resulted in increasing the Plant reliability by 25% and reduction in Unplanned outages by 12%.
  • Achieved successful project outcomes by maintaining accurate documentation and meeting strict deadlines.
  • Provided input to team lead regarding areas for process and procedural improvement.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Enhanced plant performance by conducting thorough failure analysis and recommending improvements.

Field Engineer

JAYPEE REWA CEMENT
07.2005 - 08.2006
  • Conducted Erection, Installation and Commissioning of power distribution systems including DG sets, substations, and transmission infrastructure.
  • Delivered high-quality field services, ensuring all projects were completed on time and within budget constraints.
  • Provided review of design modifications and requests for clarification.
  • Prepared documentation that would be used in requests for proposal.
  • Collaborated with multidisciplinary teams to develop innovative solutions for challenging field problems.

Education

MBA -

GlobalNxt University
01.2019

Bachelor of Engineering - Electrical and Electronics

L.N.C.T Bhopal
Bhopal, India
07-2005

Higher Secondary -

St. Xavier's Sr.Sec.School
Bhopal
04.2001 -

Skills

Operations management

Professional Recognition

  • Recipient of Star Mentor Award from Hindalco Industries' Managing Director
  • Selected member of Hindalco Industries' Prestigious Talent Pool and Think Tank
  • Senior member of Technical Career Path at Hindalco Industries Limited
  • Multiple formal appreciations from unit heads for critical issue resolution: Managing Director-Metal Business for Mahan Plant improvements, Metals Cluster Head-Eastern Region for Hirakud Plant stabilization, ABCIL-Garhwa Unit Head for critical fault diagnosis, Hi-Tech Carbon Plant Unit Head for rapid troubleshooting.

Publications

  • Published technical article on '132 kV Unique Application of Line Differential Relay' in Electrical India Magazine
  • Presenter: 'HVDC Technology' at LNCT, Bhopal
  • Presenter: 'DNA & DNA Fingerprinting' at ABV-IIITM, Gwalior
  • Paper on Mitigating Generator and Primary Equipment Stress through Sub-Cycle Fault Clearing
  • A Unique Implementation of Ultra High-Speed Travelling Wave Protection at Hindalco-Renusagar due for publishing in Electrical India Magazine.
  • Esteemed member of CIGRE

Accomplishments

  • Staffing - Worked directly with Human Resources to streamline hiring and onboarding process.
  • Achieved Enhanced Safety and Reliability by introducing Adaptive AI Based Maintenance Trouble Shooter (applied for Patent) for Maintenance jobs of both Critical and Non-Critical nature.
  • Projects of Various nature completed well under timelines by effective planning and tracking
  • Protection Relay coordination was done for complete Hindalco Industries Limited-Renukoot and Hirakud Plant effectively which reduced the unplanned shutdown of plant due to system disturbances
  • Stabilized various Plants Electrical and Instrumentation System of Hindalco, Grasim, Hi-Tech Carbon and Ultratech Cement reducing their Black-Outs to Zero
  • Published various Papers on Electrical System stabilization by usage of Newer Technology
  • Instrumental in In-House Repair of the Severe Winding Failure of the Turbo-Generator Winding in record 21 days hereby saving approx. Rs. 260 Cr. of Revenue

Affiliations

Esteemed member of CIGRE-Paris

Member of Talent Pool and Technical Career Path of Hindalco Industries Limited

Faculty of HTU for Training and capability building of the Experienced and GET's of Hindalco.


Timeline

Assistant General Manager

Hindalco Industries Ltd- Renusagar Power Division
07.2022 - 10.2024

Sr.Manager

Hindalco Industries Ltd-Renusagar Power Plant
07.2017 - 07.2024

Manager

Hindalco Industries Ltd
07.2013 - 07.2017

Deputy Manager

Hindalco Industries Limited
07.2010 - 07.2013

General Manager - Department Head (E&I)

HINDALCO INDUSTRIES LTD. - Aditya Birla Group Flagship Company
05.2008 - Current

Assistant Manager

Hindalco Industries Ltd
05.2008 - 07.2010

Executive

SIEMENS LTD., BANGALORE
01.2008 - 04.2008

Engineer

HEG LIMITED, MANDIDEEP
08.2006 - 01.2008

Field Engineer

JAYPEE REWA CEMENT
07.2005 - 08.2006

Higher Secondary -

St. Xavier's Sr.Sec.School
04.2001 -

MBA -

GlobalNxt University

Bachelor of Engineering - Electrical and Electronics

L.N.C.T Bhopal
RAMAN BAJPAIGeneral Manager, Electrical & Instrumentation Engg.