Summary
Overview
Work History
Education
Skills
Personal Information
Passport
Disclaimer
Languages
Timeline
Generic

RAMBABU BODEPUDI

Guntur

Summary

Experienced, Mechanical Engineer with a background in API brown field and green field Projects Execution and Maintenance. Mechanical back ground with knowledge of , CGMP requirements fulfillment , Documentation process. In profession of strong communication and leadership skills. Good knowledge on solution giving experience as Sr manager in the API plant Execution and Maintenance. Multi-talented Senior Manager well-versed and highly effective at developing, executing and directing key improvements to enable business enhancements and growth. Visionary leader with solid success leading business operations toward growth. Skilled Senior Manager skilled in cross-functional collaboration. Optimizes processes and communication and drive results. Dedicated to continuously improving professional knowledge and business operations by applying top-notch skills.

Overview

29
29
years of professional experience

Work History

Sr Manager Project Construction and Maintenance

Jubilant ingrava ltd
Bharuch
08.2023 - Current
  • Developed and implemented strategies to improve operational efficiency, reduce costs, and increase productivity.
  • Managed a team of 30+ employees by providing guidance, setting goals and objectives, delegating tasks, and monitoring performance.

Sr Manager Engineering and Projects

Hetero Labs
Hyderabad
01.2022 - 06.2023
  • General maintenance and modification works, as per the new product and facility upgrade works, Brownfield projects, energy-saving works.

Sr Resource Manger Projects

Dr Reddy's Laboratories
10.2013 - 01.2022
  • Planning of Project as per the available product
  • Execution of peptide projects equipment's installation RPHCL, Rota evaporators, Huber systems, microwave reactors, filtration systems, lyophilizes, multiple column extraction systems, capacity enhancement, Fume hood systems for negative section draft maintenance for critical products
  • Estimation of project cost including, mechanical, electrical, instrumentation, Civil, HAVA etc
  • Preparation BOQ as per the project
  • Selection of equipment as per the process requirement
  • Preparation of Documentation like URS, DQ, IQ, OQ validation etc
  • Following of safety norms as per the best industry to be following
  • Handover of project and capitalization of project after successful completion of operational trails
  • Vendor selection, vendor evaluation and order issue from SCM
  • Installation of water plants and Validating as per Guide lines
  • HAVC installation and validation activities
  • Special type of equipment's installation, Qualification and Maintenance
  • Contractor management system and Legal requirements monitoring
  • Conducting Process hazard analysis, process safety management, with internal and External team to mitigate the safety requirements
  • Implementation hydrant, sprinkler system for solvent tank, fire alarm system and Following the fire safety norms
  • Installation of Water plants, Ie RO, purified water plants, WFI, steam injection systems as per process requirement.

Management Staff

CIPLA Ltd
Bommasandra, Bangalore
10.2010 - 10.2013
  • Installation of the imported ANFD isolators, and all Glass ANFDs etc
  • Installation of material charging isolator form Indian and chem reactors with Huber units
  • Follow-up with mechanical contractor for procurement and installation works as per schedule
  • Utility plants installation i.e
  • Chillers, air compressors, N2 generators, air dryers, oil fired boiler and AHUs
  • Installation of VTD, co-mill, packing with isolator
  • BOQ, technical comparison, and tender finalization and technical discussion with the venders for supply and service
  • Co-ordination between the contractors and company requirement
  • Follow upping the consultant for providing the drawings and follow up of co-ordination drawing and in Execution of work
  • All preventive and break down maintenance of Plant
  • Process related operation issues resolution works.

Sr Executive Project

Primal Healthcare
Digwal, Telangana
03.2007 - 10.2010
  • Installation of Process equipment
  • Zero Liquid Discharge Scheme of 100kl/per day of utility and process R.O
  • Modification of existing plants for GSK products of FADCP, Amino alcohol
  • Installation of air compressors for air breathing with control pressure monitoring system in plant
  • GMP Block For GSK and Merck purpose 2kl to 4kl SS reactors - installation with single fluid system and also automated ANFD Installation and maintenance (Huber system)
  • All pressure related equipment's safety compliances
  • Installation of distillation columns of packed and seave try columns of dia 250m to 1500mm SS and haler coating
  • Installation of Cold storage for different products with dedusting facility
  • Installation of High Vacuum Distillations setups like ejector systems dry vacuum system
  • Experience Installation of HAVC systems and commissioning and validation
  • Chilling plants from 10ºc to -80ºc plants installation
  • Multi effect MEEK, ATFD, stripper, and R.O plants installation and commissioning
  • Single fluid system process block installation.

Sr. Engineer Maintenance and Process Modification Projects

Suven Life Sciences Ltd.
Dasaigudem (V), Suryapet-508213,T. Telangana
08.2000 - 03.2007
  • Maintenance of 0.5kl to 12kl Glass and SS reactor, 24" to 48" centrifuges, of 3 point and 4 point suspension type, Centrifugal pumps Maintenance, 4 sq.mm to 60 sq.mm condensers and tray dries
  • Maintenance of air handling units of class one lack area
  • Maintenance of thermo packs systems from 100000 kcal to 6lack kcal
  • Maintenance of vacuum tray dryers
  • Fluid bed dryers
  • Maintenance of High pressure reactors up to 60kg/cm2
  • Maintenance of MMA Gas, Tankers unloading & dispensing system
  • Preparation of documents as per CGMP guideline
  • Preparation new process pipe line and modifications of equipment's as per process requirements
  • Preparation of Qualification documents to meet the regulatory requirements.

Maintenance Engineer

SIRIS Ltd
LB Nagar, Hyderabad
09.1995 - 08.2000
  • Maintenance of reactors and process related equipment
  • Maintenance of FBDS with RH control, Rcvds etc
  • Vacum pumps, Water ejector system
  • Installation & Maintenance of Distillation Columns of 250 mm dia to 1.8 M dia Packed column
  • Maintenance of thermo pack, oil heating system
  • Maintenance of Rotary dryers, utilities, air compressors, n2 plants
  • Product modification required modification works.

Seiner Manger Projects

Cushman and Wakefield
08.2023
  • Project execution planning, material indenting, BOQ preparation, co-ordination from consultants for Drawings and cross function team reviews
  • Approval of drawings for Execution
  • Tender documents review and commenting as per company process requirements
  • Execution plan preparation, equipment delivery follows up
  • Meeting the GMP requirements and legal compliance
  • Meeting the safety requirements, QMP, Hazard identity study, PSSR, P&ID and process safety review from consultant and internal team and same implementation from project starting itself, safety interlock check identity works.

Education

B.tech Mechanical Engineering (correspondence -

Vinayaka Missions University
Salem, Tn
06-2007

High School Diploma -

Department of Technical Education
Bengaluru, KA

Skills

  • Schedule monitoring
  • Coordination with External Agencies
  • Cost/ capex monitoring
  • Coordination from consultant if required
  • Contract review and recommendations
  • Interdepartmental coordination
  • Legal requirement following
  • Meeting the API/CGMP regulatory requirements
  • Issue resolution and Employee relations
  • Technical support and Team building
  • Stakeholder relations

Personal Information

  • Father's Name: Subba rao B
  • Date of Birth: 08/04/72

Passport

Available

Disclaimer

I hereby declare that all the information made in the above is true and correct to the best of my knowledge and belief.

Languages

Telugu, English, Hindi, English, Hindi, Kannada

Timeline

Seiner Manger Projects

Cushman and Wakefield
08.2023

Sr Manager Project Construction and Maintenance

Jubilant ingrava ltd
08.2023 - Current

Sr Manager Engineering and Projects

Hetero Labs
01.2022 - 06.2023

Sr Resource Manger Projects

Dr Reddy's Laboratories
10.2013 - 01.2022

Management Staff

CIPLA Ltd
10.2010 - 10.2013

Sr Executive Project

Primal Healthcare
03.2007 - 10.2010

Sr. Engineer Maintenance and Process Modification Projects

Suven Life Sciences Ltd.
08.2000 - 03.2007

Maintenance Engineer

SIRIS Ltd
09.1995 - 08.2000

B.tech Mechanical Engineering (correspondence -

Vinayaka Missions University

High School Diploma -

Department of Technical Education
RAMBABU BODEPUDI