Summary
Overview
Work History
Education
Skills
Websites
Accomplishments
Interests
Languages
Timeline
PERSONAL PROFILE
Generic

RAMESH KAMTANAM

ZAHEERABAD

Summary

Seeking a challenging position in an organization that provides me opportunities to explore & excel while carrying out the role for personal, professional as well as organizational goals. Offering over 8 years of experience in managing paint shop & Body shop operations, implementing lean manufacturing techniques, and driving continuous improvement initiatives to enhance throughput and reduce defects.

Overview

9
9
years of professional experience

Work History

Deputy Manager

BODY PU
09.2020 - Current
  • Led daily production operations ensuring delivery, quality, and safety targets.
  • Implemented process improvements reducing cycle time by 10% and material wastage by 20%.
  • Conducted RCA and defect analysis for paint/welding quality issues, improving first-pass yield.
  • Worked with cross-functional teams (Quality, Maintenance, Design) to resolve bottlenecks.
  • CAPEX projects implementation like White Body Storage system installation, storage capacity enhancement
  • Led the smooth implementation of LTS in coordination with the union, ensuring seamless transition and workforce alignment.
  • Cost saving projects & production improvements to enhance PQCDSM
  • Led the team responsible for commissioning activities in a greenfield project; successfully completed system readiness ahead of product launch.
  • Process defining & productionizing for M2/M4 level Projects like BIW welding Jigs & fixtures design, Gun study, Transfer systems installation.
  • Reporting to: HOD

Assistant Manager

Paint PU
08.2017 - 08.2020
  • Responsible for Production ramp up & Standardization of Process Lines with digital technology leverage by coordinating with central team.
  • Allocate manpower efficiently to optimize productivity and reduce downtime.
  • Responsible for Ensure paint line runs smoothly and meets daily target
  • Monitor and control paint mixing, application, and curing processes to meet quality standard.
  • Implement and maintain standard operating procedures (SOPs) for consistent output.
  • Address defects or deviations and implement corrective actions promptly
  • Maintain cleanliness and proper ventilation in the paint shop to minimize health risks.
  • Ensure proper maintenance and calibration of spray booths, ovens, and other paint equipment.
  • Manage inventory of paints, solvents, and other raw materials.
  • Coordinate with procurement to ensure timely availability of supplies.
  • Collaborate with other departments like quality control, logistics, and engineering.
  • Train and mentor paint shop staff to improve skill levels and performance
  • Prepare reports for management review and suggest process improvements.
  • Maintain accurate records of production output, material usage, and equipment performance.
  • Reporting to: Production Head

Education

B.Tech - Mechanical Engineering

GNIT, JNTU UNIVERSITY
HYD
01-2016

12th - undefined

Narayana Jr college
Nallagandla Hyderabad
01-2012

10th - undefined

Gandhi memorial high school
ZAHEERABAD
01-2010

Skills

    ● CATIA,CAD
    ● Project Management
    ● Budgeting and Cost Control
    ● Process improvements
    ● Safety Compliance
    ● Troubleshooting

    ● MOST

Accomplishments

  • Recognized by CEO for successfully driving PT/CED defect reduction, improving overall paint quality and reducing rework.
  • Awarded by OOC for enhancing PT/CED production capacity, contributing to improved throughput and operational efficiency.
  • Received appreciation from Plant Head (ED) for effective initiatives in drip mark defect reduction, ensuring better surface finish and quality standards.
  • Honored by CEO for the smooth implementation of new EV models — Treo, UDO, and Zeo, ensuring seamless paint shop integration and production readiness.
  • Recognized by COO for achieving 10% sealant optimization, resulting in significant material cost savings and reduced wastage.
  • Rewarded for Machine-to-Machine integration project to avoid Wrong part assembly in UV Body shop & also for low cost implementation.
  • Rewarded for implementation of In house Lift & transfer system with zero cost which benefitted with 10 Lacs investment saving & increment of productivity through Manpower reduction & production increase.
  • Rewarded for capacity enhancement of WBS(White Body Storage) from 35 to 55 BIWs.
  • Awarded by COO for successful LTS implementation & boosting production by 15% through feasible inputs given to Industrial Engineering team for work study and line balancing.
  • Received Spot Award from Plant Head for achieving significant IMCR cost savings

Interests

Cooking, Listening to music

Languages

TELUGU
HINDI
KANADA
ENGLISH

Timeline

Deputy Manager

BODY PU
09.2020 - Current

Assistant Manager

Paint PU
08.2017 - 08.2020

12th - undefined

Narayana Jr college

10th - undefined

Gandhi memorial high school

B.Tech - Mechanical Engineering

GNIT, JNTU UNIVERSITY

PERSONAL PROFILE

  • Date of Birth: 03-06-1994
  • Marital status: Married
RAMESH KAMTANAM