Summary
Overview
Work History
Education
Skills
Languages
Spouse
Personal Information
Timeline
Generic

RAMESH KUMAR

Dharmapuri

Summary

Dynamic engineering professional with extensive experience at TATA STEEL, excelling in project management and electrical systems. Proven track record in successfully commissioning multiple cement plants and power systems. Skilled in troubleshooting and team leadership, ensuring safety compliance and optimal performance in high-stakes environments. Adaptable and results-driven, committed to achieving engineering excellence.

Overview

16
16
years of professional experience

Work History

Assistant Site Manager E&I

KHD Humboldt Wedag India Limited
07.2022 - 09.2024
  • Successfully completed Project as an Asst. Site Manager Erection and commissioning of Unit IV Clinker, Cement Mill and at My Home Cement Industries Private Limited Unit-IV Mellacheruvu, Telangana.

Lead Engineer

TATA STEEL
Angul
07.2017 - 07.2022
  • Operation and maintenance of Substation 33 kV, 6.6 kV MV, and 415/690 V LT panels, breakers, and drives, including preventive maintenance and troubleshooting.
  • Operation and Maintenance of MV and LV Motors up to 8.4 MW synchronous motor.
  • Preparing maintenance and shutdown activities and completing them within the planned time.
  • Preparing ESI, SOP, RCFA, failure analysis, and corrective action, and implementing machine healthiness to achieve high production.

Sr. Ere. Comm Engineer

L&T EBG Group
Mumbai
07.2013 - 07.2017
  • Completed projects as a team player and as an assistant. Site in charge of various projects all over India.
  • Er., Comm of the steel plant JSPL Angul, balance package of HTSS, 220 kV GIS substation, and an 8-bay with dual-line switchyard.
  • Participated in team meetings to discuss project progress updates.
  • Provided support during the installation, maintenance, repair, and calibration of equipment.
  • EPC of Gold Stone Cement plant, 3,000 TPD clinker unit, at Meghalaya, May 2016.
  • Erection and commissioning of a 33 kV switchyard at Ultratech Cement Grinding Unit, Patna.
  • EPC of Dalmia Cement 3,500 TPD clinker unit at Umrangso, Assam, 2015.
  • EPC of Dalmia Bharat Cement plant, 5,500 TPD clinker unit, at Belgaum, Karnataka.
  • Performed testing to determine functionality or optimization.
  • Managed project timelines, ensuring adherence to milestones and deliverables.
  • Developed technical documentation to support engineering processes and compliance standards.

Erection Commissioning Engineer

Merit Technologies India Ltd
Chennai
01.2009 - 07.2013
  • Truck loading system erected and commissioned at AMPTPL, Mormugao, Goa, July 2013.
  • Rapid Loading System erected and commissioned at Adani Petronet Port Pvt. Ltd., Dahej, Gujarat, October 2012.
  • TLS commissioned the PET-Coke Loading System at the ESSAR Oil refinery in Jamnagar in April 2012.
  • WLS and TLS were erected and commissioned at Adani West Port, Mundra, Gujarat, in October 2011.
  • Maintenance of WLS at Northern Coalfields Limited, Madhya Pradesh, from Dec 2009 to Oct 2010.
  • Achievements: 5 cement plants erected and commissioned. 4 coal handling plants & wagon loading systems, and 6 truck loading systems were commissioned. 2 MRSS and GIS Power Systems were erected and commissioned. Switch yard and power transformer up to 160 MVA, 220 kV/33 kV erected and commissioned. Having 5 years of experience in O&M at a sinter plant in a steel plant. More than 20 SS power systems have been erected and tested. And relay programming of Schneider make, function checking, testing, and commissioning, along with parallel operations.
  • Managed project schedules and resources to meet engineering deliverables effectively.
  • Provided technical support and training to junior engineers and team members.
  • Performed testing to determine functionality or optimization.
  • Analyzed design or requirement information for equipment or systems.

Education

BE. - Electrical

Emperial Institute of Management Science
Delhi
01.2016

DIPLOMA - Electrical & Electronics Engineering

S.M. Arumugam Polytechnic
Dharmapuri, Tamil Nadu
01.2007

Skills

  • Reading and understanding drawings
  • Interpreting code specifications
  • Circuits troubleshooting
  • Project planning
  • People management
  • Billing
  • Document tracking
  • Project management
  • Safety compliance
  • Team leadership
  • Resource planning
  • System troubleshooting
  • Problem-solving
  • Adaptability to change
  • Technical documentation
  • Electrical systems
  • Equipment maintenance
  • Scheduling coordination
  • Subcontractor management
  • Site supervision
  • Health and safety compliance
  • Safety procedures
  • Documentation and reporting
  • SOP development
  • Skilled in relay programming and logic implementation (Schneider)

Languages

  • Tamil
  • English
  • Hindi
  • Telugu
  • Kannada

Spouse

M. Manonmani

Personal Information

  • Passport Number: W3129362, Valid: 04/2032
  • Father's Name: M. Palani
  • Mother's Name: P. Thangammal
  • Blood Group: O +Ve
  • Date of Birth: 03/12/87
  • Nationality: Indian
  • Marital Status: Married

Timeline

Assistant Site Manager E&I

KHD Humboldt Wedag India Limited
07.2022 - 09.2024

Lead Engineer

TATA STEEL
07.2017 - 07.2022

Sr. Ere. Comm Engineer

L&T EBG Group
07.2013 - 07.2017

Erection Commissioning Engineer

Merit Technologies India Ltd
01.2009 - 07.2013

BE. - Electrical

Emperial Institute of Management Science

DIPLOMA - Electrical & Electronics Engineering

S.M. Arumugam Polytechnic
RAMESH KUMAR