Summary
Overview
Work History
Education
Skills
Languages
Additional Information
Timeline
Intern

RAMESHKUMAR Thirugnana Sambandam

Senior Engineer- Mechanical
salem,Tamilnadu

Summary

To be an integral part in providing value addition to client's business, quality and processes, following the company standards.


To work with a reputed organization, where continuous learning along with work is possible.

Overview

22
22
years of professional experience
4
4
years of post-secondary education

Work History

Lead Mechanical Engineer -Structural &Static

Qarn Alam, Power plant Expansion Project
Qarn Alam oman, oman
12.2014 - 12.2022
  • Handled the above Projects with a Team Size varies from 75-120
  • Roles & Responsibilities
  • Performed Constructability studies with the support of other Discipline leads
  • Preparation of Method of Statement for all Erection Jobs and submission for Client approval
  • Allocation of Manpower & Machinery necessary for the execution of Structural / Equipment works
  • Erection of Equipment and Structural Steel Components (E.g
  • Beams, Columns, Stiffeners, Girder) as per
  • Drawings, Specifications and Baseline Schedule
  • Raise Site Technical Queries in case of clarifications required from other Department for execution of Works.

Equipment Engineer

QATAR Engineering and Construction CO.W.L.L
01.2013 - 11.2014
  • Projects Handled
  • Qatar Gas /Samsung Engineering and Construction Limited (SECL) - Laffan Refinery Expansion Project - Diesel
  • Hydro treated Project (QAR 42 Million) - Handled the Project with a Team Size of 50
  • Roles & Responsibilities
  • Examining Equipment received from Vendors for Damage, Corrosion, Cracks and Inspection as per the approved
  • Equipment drawings / Project Specifications
  • Preparation of Method of Statement for Erection of Equipment for Client approval (Qatar Gas)
  • Verification of Cranes, Slings and other lifting devices for performing Erection works
  • N2 Purged equipment's are regularly inspected and Refilled if required and log will be maintained on weekly basis for individual Equipment
  • Attending Weekly and Monthly Meeting with Clients & Subcontractor
  • Monitors the performance and overall progress during the project work
  • Major Structures / Equipments
  • Air fin Cooler (16 Nos) - 592 MT, Vessel - 16 Nos, Heat Exchanger - 30 MT, Columns (96 Meter Elevation) -MT, Reactors (60 m Elevation) - 50 MT, Pumps -16 Nos, Centrifugal & Reciprocating Compressor- 3 Nos

Equipment Engineer

Rolls Royce India Private Limited
New Delhi
03.2011 - 07.2012
  • Projects Handled
  • Bangladesh Power Plant Division - 250 MW & 450 MW Power Plant Project (USD 22 Million) -
  • Handled the Project with a Team Size of 80
  • Roles & Responsibilities
  • Ensure incoming materials meet the Quantities, Size/Dimension, and Chemical Content for Tolerance
  • CURRICULUM VITAE
  • Page 3 of 3
  • Ensure the Erection work being executed at site as per the Erection Scheme/Approved Rigging Plan
  • Redeployment of idle assets at project sites
  • Major Structures / Equipments
  • Bergen Engine Erection (26 Nos) -56 MT each, Pipe module Package (26 Nos) - 16 MT, Chimney Flare
  • Structure Erection and Grating, Handrails Installation, Booster Module, Cooling Tower, HFO & LFO Storage
  • Tank.

Engineer

Firoze Fabricators Private Limited
SALEM, Tamil Nadu
06.2001 - 02.2011

· Power Plant Project executed as a site engineer for various clients Thermax India Private Limited, Ansaldo Private Limited, Enmas Andritz Private Limited, Greensol Power Private Limited, BGR Energy Systems Limited, Chemplast Sanmar Limited

Roles & Responsibilities

· Prepare and Monitor Production Schedules and Resources

· Handle Production Drawings and calculation of bill of materials

· Submission of Daily Production Reports

· Raw material inspection at receipt

· Preparation of Cutting Plan for required Job Length

· Daily stage Fit-Up &Production work monitoring

· Verification of documents of Incoming Consumables & materials as per applicable Codes & Specification

· Major Structures / Equipments

· Fabrication and Erection of Industrial process Equipment, Storage tanks, SS Tanks,



Education

Bachelor of Engineering - Mechanical Engineering

Anna University -Government College of Engineering
salem Tamilnadu India
04.2005 - 04.2009

Skills

  • Good Mentorship quality
  • Strong communication
  • Focus and attention towards job
  • Test plan execution
  • Welding knowledge
  • Quick learner
  • Employee management
  • Technical problem-solving
  • Works well in diverse team environment
  • Microsoft Excel
  • AutoCAD

Languages

English
Advanced
Hindi
Advanced
Arabic
Beginner
Tamil
Fluent

Additional Information

  • Professional with 20+ years of Overall Experience in the Execution of EPCM & LSTK Projects in the field of Oil & Gas brownfield projects, Power and Petrochemical Industries holding various positions in the areas of Structural Steel, Static & Rotary Equipment Erection. Having Onshore Plant Experience of 12 years & Modularized Plant Experience of 8 years.



Declaration

I hereby declare that the above mentioned information is correct to the best of my knowledge and belief.


Yours sincerely,


Place -Salem Ramesh Kumar

Timeline

Lead Mechanical Engineer -Structural &Static

Qarn Alam, Power plant Expansion Project
12.2014 - 12.2022

Equipment Engineer

QATAR Engineering and Construction CO.W.L.L
01.2013 - 11.2014

Equipment Engineer

Rolls Royce India Private Limited
03.2011 - 07.2012

Bachelor of Engineering - Mechanical Engineering

Anna University -Government College of Engineering
04.2005 - 04.2009

Engineer

Firoze Fabricators Private Limited
06.2001 - 02.2011
RAMESHKUMAR Thirugnana SambandamSenior Engineer- Mechanical