Summary
Overview
Work History
Education
Skills
Certification
Previous Experience
Salary Details
Disclaimer
Personal Information
Timeline
Generic
RAMESH KUMAR YADAV

RAMESH KUMAR YADAV

ENGINEER (PIPING)
Ratsimehmapur, Ballia,Uttar Pradesh

Summary

Highly motivated professional with 8.10 years of experience in managing thermal and nuclear power projects. Dedicated to utilizing skills and experience to contribute to company objectives of achieving customer satisfaction. Goal-oriented mindset with successful execution of multi-disciplinary activities and on-time deliverables. Experience includes fabrication and erection of ESP, piping systems, and cross-country pipelines. Completed commissioning of pipelines and handled projects worth 450 crore. Expertise in boiler pressure parts and miscellaneous piping fabrication & erection work. Track record of managing change and leading teams of up to 740 individuals. Skilled in identifying areas for improvement and implementing successful action plans. Received Best Employee Award from Adani Power Jharkhand Limited for work on the Intake Water Pipeline project.

Strong leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Uses independent decision-making skills and sound judgment to positively impact company success. Detail-oriented, organized, and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.

Overview

9
9
years of professional experience
2
2
Certifications
2
2
Languages

Work History

Engineer - Mechanical

Innovsource Services Pvt. Ltd.
Waidhan Singrauli
01.2020 - Current

PROJECT-ADANI MAHAN ENERGEN LTD

(MP) (2X800MW ULTRA SUPERCRITICAL THERMAL POWER PROJECT)

  • Minimizing the downtime to minimum by administering the functions of troubleshooting & preventive/breakdown maintenance of machines & equipment
  • Heading regular inspections to prevent hazard occurrences & adhere to regulatory norms.
  • At adani worked in Boiler Column & Ceiling Guider Successfully Erected with Alignment.
  • At adani in Boiler Pressure Parts (Piping of down-comer line, Eco feed water system, C P supply line, riser pipe, manifold system, startup system, separator tank, and water collecting tank and their connecting piping etc).
  • Achieved successful project outcomes by maintaining accurate documentation and meeting strict deadlines.
  • Led engineering teams to successfully complete projects on time and within budget.
  • At adani worked in erection of boiler Pressure Parts & structure (Piping Support, Misc Piping, Duct, mill area & Insulation work etc).
  • At adani Worked in ESP Column, Casing wall, Hopper box, Ridge, GD Screen, Bracing, Emitting Frame, TR Frame, LR Beam, Collecting Electrode, Inlet & Outlet Funnel, Mini Hopper, Staircase successfully erected & Alignment timely done.
  • At adani worked as client's site in charge for MS pipe bends fabrication and erection of intake water line.
  • At adani monitored contractor's work and to ensure proper fit-up of pipes before welding starts.
  • At adani responsible for proper weld visual of the joints.
  • At adani responsible for external wrapping coating with bitumen tar and holiday test of the coating.
  • At adani also responsible for internal painting near joints and to check DFT of the paint.
  • At adani checking and verification of contractor's bill
  • Inspection of joint fit up, spool direction and alignment, flange alignment, bending of pipe, line elevation and co-ordinates, valve and orifice installation as per specification and approved job procedure.
  • Selection and issue of require materials as per isometric drawing, GA and codes.
  • Prepare necessary piping execution documents.
  • Scrutinize contractor's bills and pass on further to management.
  • Selection of standard supports and fabrication of the same as per the drawing.
  • Make a month ahead planning and monitor the progress at site.
  • Arrange stage wise inspection as required and clearance from competent authority.
  • Responsible for material follow up for continuous supply of materials and smooth fabrication as well as erection.
  • Responsible for small and big bore piping of utility system inside and outside Reactor building.
  • At J P Engineer worked on preheating system.
  • At J P Engineer installation of valves in reactor building.
  • At J P Engineer responsible for pickling & blasting of pipe and fittings of small & Big bore.
  • Responsible for Tools & Materials Management required for Erection and Fabrication
  • Preparation of As Built drawings and documents of the completed jobs.
  • Maintain the welding register for fabrication and erection work separately.
  • At J P Engineer worked as engineer for hot water make system of stainless-steel low bore pipes, fabrication and erection.
  • At J P Engineer I was also in charge of carbon steel and alloy steel of small and big bore of the re-heater drain system, moisture separator system, main steam system, main steam dump line system feed water system & also done the fabrication and erection of the system which includes all types of valves.
  • Working as In charge of construction of two condensate storage tanks & working as commissioning.
  • Erection of Plant such as Water treatment Plant, Cooling towers and DM plant.

HIGHLIGHTS

  • Played a key role as a Site engineer of Water Intake System of 95 KM underground MS water pipeline from Sahibganj to Godda ADANI POWER JHARKHAND LTD 2x800MW.
  • Successfully completion of 2X800MW Supercritical Boiler Hydro Test, Light up, Synchronization, COD & RRT Test without any Tube leakage whereas 45000+ Tube Joints.
  • Successfully completion of 2X800MW Supercritical Boiler Hydro Test, Light up, Synchronization, COD & RRT Test ALSO Miscellaneous Piping Work Approx 16KM within 3 Months.
  • Got rewarded of the project for best progress: Three times at ADANI.
  • Pipeline Engineering at booster intake pump house and booster pumping station at adani Power Jharkhand Ltd.
  • Directed site execution activities involving erection of pipeline at ADANI POWER JHARKHAND LTD.
  • Risk reporting to business heads to ensure mitigation of risks relevant to the business other personnel for understanding their liability for risks; implemented an overall HSE / Risk Management process for the organization.
  • Vendor Management work: - Material Handling/ Material Issuing.
  • Land liaison work with Local villagers & Govt Authorities.

Engineer

J P Engineer's
Gorakhpur (UP)
03.2019 - 01.2020

PROJECT- HURL Fertilizer Gorakhpur, UTTAR PRADESH

Engineer

J P Engineer's
Rawatbhata
07.2018 - 03.2019

PROJECT-2x700MW, NPCIL Power Project Rawatbhata-7&8 Rajasthan

Engineer

J P Engineer's
Vyara, Gujrat
06.2016 - 07.2018

PROJECT-2x700MW, NPCIL Power Project Kapp-3&4 Vyara Gujrat

Education

B. Tech - Mechanical Engineering

UTTAR PRADESH TECHNICAL UNIVERSITY
Greater Noida UP
01.2012 - 2016.01

Intermediate -

U.P. Board
Ballia UP
01.2010 - 2011.01

High School -

U.P. Board
Ballia UP
01.2008 - 2009.01

Skills

  • Boiler Pressure Part (Piping and Structure)

  • Time management

  • Project planning

  • Technical reporting

  • Engineering documentation

  • Quality control

  • ESP Fabrication & Erection Work

  • Critical Piping

  • Boiler - Miscellaneous Piping

Eco inlet economizer feed water line

Project management

Root-cause analysis

Team collaboration

Technical writing

Critical thinking

Project estimation

Certification

Certificate of Diploma in Hardware (Computer), 2011

Previous Experience

  • Innovsource Services Pvt. Ltd., Adani Power MAHAN ENERGEN LTD. (MP) (2X800MW ULTRA SUPERCRITICAL THERMAL POWER PROJECT), Engineer, 04/01/24, Present
  • Innovsource Services Pvt. Ltd., Adani Power JHARKHAND LTD. (JHARKHAND) (2X800MW ULTRA SUPERCRITICAL THERMAL POWER PROJECT), Engineer, 01/01/20, 03/31/24
  • J P Engineer's, HURL Fertilizer Gorakhpur Uttar Pradesh, 03/01/19, 01/31/20
  • J P Engineer's, 2x700MW, NPCIL Power Project Rawatbhata-7&8 Rajasthan, 07/01/18, 03/31/19
  • J P Engineer's, 2x700MW, NPCIL Power Project Kakarapara-3&4 Vyara Gujrat, 06/01/16, 07/31/18

Salary Details

Negotiable, 30 Days

Disclaimer

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.

Personal Information

  • Passport Number: P1300869
  • Passport Date Of Issue: 06/30/16
  • Passport Expiry Date: 06/29/26
  • Date of Birth: 01/03/94
  • Marital Status: Married

Timeline

Engineer - Mechanical

Innovsource Services Pvt. Ltd.
01.2020 - Current

Engineer

J P Engineer's
03.2019 - 01.2020

Engineer

J P Engineer's
07.2018 - 03.2019

Engineer

J P Engineer's
06.2016 - 07.2018

B. Tech - Mechanical Engineering

UTTAR PRADESH TECHNICAL UNIVERSITY
01.2012 - 2016.01

Intermediate -

U.P. Board
01.2010 - 2011.01

High School -

U.P. Board
01.2008 - 2009.01
RAMESH KUMAR YADAVENGINEER (PIPING)