Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

RAMISETTY BHARGAV

HYDERABD

Summary

Results-driven Senior Civil Engineer with expertise in project leadership, budget management, and construction oversight. Proven success in delivering large-scale infrastructure projects on time and within budget, ensuring compliance with safety and quality standards.

Overview

12
12
years of professional experience

Work History

Senior Engineer

Suvarna Durga Group
Hyderabad
05.2021 - Current

A Senior Civil Engineer is a leadership-level professional responsible for overseeing the design, planning, and execution of large-scale infrastructure projects They bridge the gap between abstract design blueprints and physical construction, managing budgets, cross-functional teams, and regulatory compliance.
• Project Leadership & Management: Overseeing projects from initial feasibility studies through preliminary layouts to final execution. This includes deploying staff, developing work schedules, and ensuring completion on time and under budget.
• Engineering & Design Review: Approving blueprints, structural calculations, and schematic drawings. They ensure the implementation of sound civil engineering disciplines (geotechnical, structural, wind, and hydrology analyses) using software like AutoCAD and Civil 3D.
• Financial & Resource Allocation: Conducting cost estimations, preparing project budgets, managing contract awards, and analyzing expenditures to optimize resource allocation.
• Site Supervision & Safety: Leading on-site engineering and construction teams, managing subcontractors, and verifying that all phases of construction meet rigorous quality standards and health, safety, and environmental regulations.
• Stakeholder Liaison: Acting as the primary point of contact for clients, executive management, municipal councils, environmental agencies, and utility providers.

Projects:

1. Suvarna Durga Paper Boards Industry (600 Tons Production Capacity)

2. Suvarna Durga Centrum (Commercial Building), Kokapet

3. Suvarna Durga Prinia Marketing office(Kismatpur)

4. Suvarna Durga Nexus Project ( National Mart & Style Mart by Ratnadeep ), LB Nagar. Its on going Project.

Site In-Charge

Indu Projects LTD
Ghaziabad
02.2018 - 05.2021

• Daily Progress Reports (DPR): Maintain meticulous records of work completed, labor strength, material receipts, and weather conditions.
• Checklists & Lab Testing: Perform and document mandatory field tests (e.g., concrete cube casting and slump tests) and coordinate with third-party labs for compressive strength results.
• Billing Verification: Measure the work completed by contractors on-site to verify and certify their running account (RA) bills.
• Drawing Interpretation: Thoroughly study and implement Architectural, Structural, and MEP (Mechanical, Electrical, Plumbing) drawings. You must catch discrepancies before concrete is poured.
• Foundation/Raft: Oversee heavy rebar reinforcement and massive concrete pours.
• Superstructure: Inspect shuttering (formwork), reinforcement binding, and concrete cover blocks before clearing any slab for casting.
• Finishing: Monitor blockwork, plastering, waterproofing (especially in toilets/balconies), and flooring.
• Managed on-site construction operations, ensuring compliance with safety standards and project specifications, resulting in timely project completion within budget.

Project: Dream Homes (G+14 residential building), Wave City Sardar Kulwant Singh Chadha Marg, NH 24Ghaziabad , Uttar Pradesh 201015.

Site In-Charge

VNR Constructions
Medhak
04.2016 - 02.2018

In government infrastructure execution—specifically within the Public Works Department (PWD)—the term "Site Incharge" refers to the on-ground execution officer. In the PWD hierarchy, this pivotal field role is almost always manned by a Junior Engineer (JE) or an Assistant Engineer (AE). Unlike a corporate site manager, a PWD Site Incharge for road projects balances physical civil engineering execution with strict government administrative protocols, public accountability, and contractual oversight.

Core Execution Responsibilities:

  • Supervision of Road Layers: Direct monitoring of every critical stage of road building, ensuring contractors lay the sub-grade, sub-base (WMM/GSB), base course, and final wearing course (bituminous concrete or cement concrete) to precise design thickness.
  • Adherence to IRC Standards: Ensuring all construction strictly aligns with the Indian Roads Congress (IRC) guidelines, and the Ministry of Road Transport and Highways (MoRTH) specifications.
  • Level and Alignment Verification: Using leveling instruments (like auto levels or total stations) to verify the road profile, coordinates, gradients, and proper camber to allow efficient rainwater runoff.
  • Drainage and Culvert Oversight: Supervising the simultaneous construction of side drains, catch pits, and cross-drainage structures (culverts/bridges) to prevent waterlogging, which is the primary cause of early road failure.

Project: Widening of from existing single lane to double lane for the roads in TELANGANA STATE(MEDHAK DISTRICT).
1. Widening and strengthening of the single-lane carriageway to a double-lane carriageway of the Kangti to Kodapgal road from Km 0+000 to 13+646 in Medhak District.
2. Widening and strengthening of the single-lane carriageway to a double-lane carriageway from Wadepally to Patancheru, from Km 5+000 to 20+000 in Medak District.

Site Engineer

Raghava Constructions
Medhak
10.2015 - 02.2016

In government infrastructure execution—specifically within the Public Works Department (PWD)—the term 'Site In-Charge' refers to the on-ground execution. In the PWD, this pivotal field role is almost always manned by a Junior Engineer (JE) or an Assistant Engineer (AE). Unlike a corporate site manager, a PWD site in charge for road projects balances physical civil engineering execution with strict government administrative protocols, public accountability, and contractual oversight.

Core Execution Responsibilities:

  • Supervision of Road Layers: Direct monitoring of every critical stage of road building, ensuring contractors lay the sub-grade, sub-base (WMM/GSB), base course, and final wearing course (bituminous concrete or cement concrete) to precise design thickness.
  • Adherence to IRC Standards: Ensuring all construction strictly aligns with the Indian Roads Congress (IRC) guidelines, and the Ministry of Road Transport and Highways (MoRTH) specifications.
  • Level and Alignment Verification: Using leveling instruments (like auto levels or total stations) to verify the road profile, coordinates, gradients, and proper camber to allow efficient rainwater runoff.
  • Drainage and Culvert Oversight: Supervising the simultaneous construction of side drains, catch pits, and cross-drainage structures (culverts/bridges) to prevent waterlogging.

Project: Widening from existing single lane to double lane for the roads in Telangana State (Package – IV; Medhak District)

1. Bonthapally Kaman will meet Gagillapur Road Section (Km 0+000 to 10+000). Jinnaram to Nagaram Road Section (Km 0+000 to 8+000).

Site Engineer

Indu Project LTD
Ghaziabad
06.2014 - 09.2015

• Bar Bending Schedule (BBS).
• Calculate the quantity as per plan.
• Maintained proper documentation of site works.
• Followed up on the work progress on site.

Project: Dream Homes (G+14, 21 Towers)

Client: Uppal Chadda Property Developers.

Consultant: Synergy Property Developers.

Education

Bachelor of Technology - Civil Engineering

Narasaraopet Engineering College, JNTU K
Narasaraopet, AP
03-2014

Intermediate Certificate - MPC

Sri Chaitanya Junior College
Guntur
03-2010

Class X - Secondary Education

Hindu High School
Narasaraopet, AP
03-2007

Skills

  • Project leadership
  • Budget management
  • Cost estimation
  • Construction management
  • Team collaboration
  • Effective communication
  • Problem solving
  • Attention to detail
  • Schedule maintenance
  • Cost analysis
  • Project management
  • Adaptability to change

Languages

English
Advanced (C1)
C1
Hindi
Advanced (C1)
C1
Telugu
Native
Native

Timeline

Senior Engineer

Suvarna Durga Group
05.2021 - Current

Site In-Charge

Indu Projects LTD
02.2018 - 05.2021

Site In-Charge

VNR Constructions
04.2016 - 02.2018

Site Engineer

Raghava Constructions
10.2015 - 02.2016

Site Engineer

Indu Project LTD
06.2014 - 09.2015

Bachelor of Technology - Civil Engineering

Narasaraopet Engineering College, JNTU K

Intermediate Certificate - MPC

Sri Chaitanya Junior College

Class X - Secondary Education

Hindu High School
RAMISETTY BHARGAV