To deliver as per client satisfaction To understand flow of work identifying activity and mobilize accordingly also with quality and safety
PROFILE
Overview
31
31
years of professional experience
21
21
years of post-secondary education
1
1
Certification
3
3
Languages
Work History
Sr Engineer Building
ASSYSTEM STUP
01.2018 - 06.2025
Project - Shalimar Santaragachi Station Development
Project cost (600 crore)
Achievements: 1 COMPLETED 5500 SQ MT STATION BUILDING, 2 COMPLETED cym AND ADMIN BUILDING, 3 FOUR PIT LINE, 4 3NOS TWOLAKH GALLON OVER HEAD TANK, 5. FIRE PUMP HOUSE, 6 PITLINE SUB STATION, 7 Three Underpass with various dispersal.
Presently responsible for a 4 wing two lane ROB and 15 MLD WTP.
Role- Project management as per contract provisions handled contractors such as Bridge and Roof, EPIL, ITD, etc, Communicating with design office.
THE PROCESS DIAGRAM IS COMPLETED for WTP. THE STRUCTURE CONSISTS OF 2 NOS CWR(5MLD) Clarified Water Tank(5MLd), Filter house, Chemical House, Inlet Structures, Centrifuge Building, supernatant sump building Different LT panel Room. Most of it completed under my Supervision. The contract is EPC mode.
Current salary- 105000/CTC
Expected Salary 155000/IN HAND
Project Manager
01.2015 - 06.2018
Responsible for construction of Metro station (DDC Metro) under Metro rail Kolkata a Turnkey EPC project
Role- Project Management including appointment of Consultant/Architect, tendering and finalization of BOQ, appointments of contractor, all correspondences, Contract document billing etc.
Project Manager
01.2012 - 01.2015
Four Irrigation Bridge in south Bengal with five Km Roads under Irrigation and Waterways WB.
Role-Project management leading 6 Engineers and 9 supervisors and other staff with time bound project completion.
Project Manager
01.2010 - 01.2013
Responsible for construction of four krishak bazar under Agri Marketing board Govt of WB
Role-Entire project Management including billing contractual obligation, correspondences and periodic supervision. Leaded a team of six site Engineer and supervisors and accountant.
Project Manager
AK ENGINEERS PVT LTD
01.2005 - 01.2010
Responsible for construction of two minor irrigation bridges
One aqueduct and 3 irrigation fall structure under KEIP funded by Asia Development Bank
Role-Project Management including contractual obligation with billing and client tackle. Leading a Team of five Engineer and 12 other site staff with store.
Project Engineer
APJ(SURRENDRA)
01.2002 - 01.2005
Construction of a Bungalow consisting of Swimming pool Auditorium Gymnasium with 5