Ms Office
Highly experienced and results-oriented professional with over 12 years in the Project, Operation and Maintenance of Iron Ore Beneficiation and Pellet Plants. Demonstrated expertise in leading cross-functional teams, managing large-scale projects from inception to completion, and optimizing plant operations for maximum efficiency and productivity. Proficient in maintenance management, operational excellence, and process improvement, with a proven track record of reducing downtime and enhancing operational workflows. Adept at collaborating at all levels, committed to safety and sustainability standards, and driven by new challenges and continuous improvement in the mining and metals industry.
• Responsible for the production in shift with maintaining quality parametres without compromising with safety .
• Efficiently managing the Indurating Section with Additive grinding circuit, ensuring smooth day to day operations.
• Simultaneously served as Shift-in-Charge of Indurating section & Additive Grinding , demonstrating versatility in handling multiple responsibilities.
• Proven expertise in manpower handling, optimizing team dynamics for enhanced productivity.
• Implemented streamlined billing and documentation processes, maintaining meticulous records.
• Coordination with different departments to facilitate maintenance and shutdowns for Indurating and Additive grinding circuits to minimizing down time for smooth plant operation and production.
• Actively contributed to the successful project and commissioning of both Indurating as a key team member & Additive as a lead member.
• Preparing production reports, and maintained stock of essential consumables, ensuring smooth operations.
•Project, Commissioning, Operation & Maintenance of 1.5 MTPA Iron ore Beneficiation and 1.2 MTPA Pellet plant.
•Functioned as Assistant Shift In-Charge, proficiently managing RMHS and various equipment such as Dryers, Ball Mills, and Mixer, T.G ,Kiln,Cooler.
•Responsible for production with quality parametres (ccs , porosity and other parametre) with Safety.
•Maintained rigorous daily logs, ensuring accurate tracking of operations and addressing issues promptly.
•Demonstrated expertise in handling shifts, troubleshooting, and ensuring seamless plant operations.
•Led as Mechanical Shift-in-Charge for a 1.2 MTPA pellet plant, overseeing comprehensive maintenance activities.
•Prepared detailed scope of work for equipment shutdowns, ensuring efficient and timely maintenance.
•Executed critical maintenance tasks in T.G, Balling Disc, and Enmass, including grate plate, cooling water shaft, and flight replacements, among others.
Ms Office