M s office
Proven track record in construction supervision and project oversight, honed at BHEL, where I led teams to complete complex engineering projects on time. Expert in Total Station Operation and adept at fostering client relations, my analytical thinking and problem-solving skills ensured a 100% client satisfaction rate on key projects. Experienced Site Engineer with 21 years of experience managing multiple simultaneous responsibilities to foster construction project completion. Well-organized planner and problem-solver versed in site preparation and day-to-day management. Ingenious Site Engineer successfully implementing project cost procedures and monitor quality construction. Skilled at reading blueprints and communicating duties to workers. Proficient in methods, principles and applications of engineering, design, building and construction. Accurately recording progress notes and providing patient education and counseling. Kind-hearted and friendly professional with expertise Hydro Power Machines erection and commissioning, fault identification. Superb communication, multitasking and time management abilities.
Unit#01-
a. Stator segments jointing, bar laying, HV test (before brazing of bars) at 25 KV and Brazing of Bars carried out.
b. Final erection of pit liner. Second stage embedment pipes erection and hydraulic testing.
Unit#02-
a. Stator segments jointing, bottom bar laying, HV test of assembled bottom bars at 27 KV carried out.
b. Final erection of pit liner and diameter and centering correction. Second stage embedment pipes erection and hydraulic testing. Hydraulic Testing of the spiral casing.
Unit#03-
a. Final erection of Stayring after x-y positioning, leveling, centering.
b. Final erection of Spiral casing after x-y positioning, leveling, and centering.
The total machine was severely damaged and dismantled completely from its 1.5 m (approx.). Of Unit-03, MGKLIS-1. Irrigation Department, Telangana has entrusted BHEL for the Restoration of UNIT #3.
1) Stator ELCID test (for core healthiness), damaged and faulty bars were replaced, HV test was carried out successfully. Even though the material was limited, I managed to complete the work.
2) Rotor: Replacement of damaged and faulty rotor poles, IR and PI, Impedance test, and final HV test were carried out successfully.
3) Due to damage to the stay ring holes, in-situ hole enlargement by drilling and tapping was carried out successfully.
Construction supervision
M s office
Hydro Engineer Expert in erection, commissioning and R & M works
Resident Engineer, Capital Overhauling Works Chunchankatte- Graphite India Limited
Resident Engineer - Restoration of Unit 03 Mahatma Gandhi Lift Irrigation Scheme Stage 1 Irrigation & CAD Deptt Telangana
Resident Engineer, Capital Overhauling Works Chunchankatte- Graphite India Limited
Resident Engineer-Capital Overhauling of Unit 03 and Centering and Alignment of Unit 02 Upper Kolab Hydro Electric Project OHPC
Resident Engineer - Thrust Collar replacement and Alignment works of Kaplan Turbine Rengali Hydro Electric Project OHPC