Summary
Overview
Work History
Education
Skills
Accomplishments
Software
Languages
Interests
Affiliations
Certification
Additional Information
GYMASTICS AND KABADDI
Timeline
Generic

RANJEET GUPTA

SENIOR HYDRO ENGINEER
Hyderabad

Summary

Proven track record in construction supervision and project oversight, honed at BHEL, where I led teams to complete complex engineering projects on time. Expert in Total Station Operation and adept at fostering client relations, my analytical thinking and problem-solving skills ensured a 100% client satisfaction rate on key projects. Experienced Site Engineer with 21 years of experience managing multiple simultaneous responsibilities to foster construction project completion. Well-organized planner and problem-solver versed in site preparation and day-to-day management. Ingenious Site Engineer successfully implementing project cost procedures and monitor quality construction. Skilled at reading blueprints and communicating duties to workers. Proficient in methods, principles and applications of engineering, design, building and construction. Accurately recording progress notes and providing patient education and counseling. Kind-hearted and friendly professional with expertise Hydro Power Machines erection and commissioning, fault identification. Superb communication, multitasking and time management abilities.

Overview

18
18
years of professional experience
4
4
Certifications

Work History

SENIOR RESIDENT ENGINEER

BHEL
06.2024 - Current
  • Enhanced patient satisfaction through effective communication, empathy, and active listening to address concerns and provide tailored care.
  • Implemented quality improvement initiatives to optimize patient care processes, resulting in better service delivery.
  • Continuously updated clinical knowledge through continuing medical education courses and attending conferences or seminars related to the field of expertise.
  • Executing R&M works of Unit 01, Nagjhari HEP, Kalinadi (6 x 150 MW), KPCL.Nagjhari HEP Kalinadi (6 x 150 MW) KPCL
  • Ordered and executed diagnostic tests and analyzed diagnostic images to further investigate patient conditions.

Resident Site Engineer

BHEL
09.2023 - 05.2024
  • Conducted regular site inspections, identifying potential risks and hazards to prevent accidents or delays in construction progress.
  • Managed budgets and financials, optimizing expenditures while maintaining high-quality standards in workmanship.

Unit#01-

a. Stator segments jointing, bar laying, HV test (before brazing of bars) at 25 KV and Brazing of Bars carried out.

b. Final erection of pit liner. Second stage embedment pipes erection and hydraulic testing.

Unit#02-

a. Stator segments jointing, bottom bar laying, HV test of assembled bottom bars at 27 KV carried out.

b. Final erection of pit liner and diameter and centering correction. Second stage embedment pipes erection and hydraulic testing. Hydraulic Testing of the spiral casing.

Unit#03-

a. Final erection of Stayring after x-y positioning, leveling, centering.

b. Final erection of Spiral casing after x-y positioning, leveling, and centering.

Resident Site Engineer

BHEL
11.2022 - 08.2023
  • Conducted regular site inspections, identifying potential risks and hazards to prevent accidents or delays in construction progress.
  • Managed budgets and financials, optimizing expenditures while maintaining high-quality standards in workmanship.
  • Resolved conflicts among stakeholders promptly, fostering positive relationships throughout the project lifecycle.
  • Enhanced project efficiency by streamlining communication between contractors and architects.

The total machine was severely damaged and dismantled completely from its 1.5 m (approx.). Of Unit-03, MGKLIS-1. Irrigation Department, Telangana has entrusted BHEL for the Restoration of UNIT #3.

1) Stator ELCID test (for core healthiness), damaged and faulty bars were replaced, HV test was carried out successfully. Even though the material was limited, I managed to complete the work.

2) Rotor: Replacement of damaged and faulty rotor poles, IR and PI, Impedance test, and final HV test were carried out successfully.

3) Due to damage to the stay ring holes, in-situ hole enlargement by drilling and tapping was carried out successfully.

  • Liaised with local authorities to secure permits and approvals in a timely manner, avoiding unnecessary delays in project execution.

Resident Site Engineer

BHEL
01.2022 - 08.2022
  • Assisted in dispute resolution among various parties involved in the project when required.
  • Ensured timely completion of projects through effective resource allocation and strict adherence to schedules.
  • Conducted regular site inspections, identifying potential risks and hazards to prevent accidents or delays in construction progress.
  • Resolved conflicts among stakeholders promptly, fostering positive relationships throughout the project lifecycle.

Resident Site Engineer

BHEL
06.2020 - 08.2021
  • Ensured timely completion of projects through effective resource allocation and strict adherence to schedules.
  • Mentored junior engineers, sharing expertise and knowledge to foster a strong team dynamic.
  • Evaluated subcontractors' performance, providing feedback and guidance for improvement, ensuring a high-quality finished product.
  • Enhanced project efficiency by streamlining communication between contractors and architects.
  • As the Resident Engineer, I individually handled the project of Unit 03 Capital Overhauling Works. As major vibrations and bearing pads heating problem were reported. Also Stator Core were reported High core leakage current and local hot spot burning. That was the specialized job. Independently handled and successfully completed. That was a big milestone and a very difficult task. The customer was extremely satisfied.
  • Resolved conflicts among stakeholders promptly, fostering positive relationships throughout the project lifecycle.
  • Assisted in dispute resolution among various parties involved in the project when required.

Assistant Engineer

BHEL
05.2017 - 06.2020
  • Erection and Commissioning of Hydro Generator for Pranhita 06 and 08 - Kaleshwaram - Megha Engineering.
  • Erection and Commissioning of Hydro Motor - Kalwakurthy Lift Irrigation Scheme III, Gammon India Limited.
  • Site In Charge/Resident Engineer for Thrust collar replacement and alignment of Kaplan Turbine at Rengali Hydroelectric Project - OHPC.
  • Site In Charge/Resident Engineer for Unit 04 Major Capital Overhauling at Upper Kolab (4 x 80 MW) Hydroelectric Project - OHPC.
  • Provided technical assistance to staff when needed.
  • Assisted in development, design and execution of projects.

Assistant Engineer

BHEL
06.2015 - 05.2017
  • Erection and Commissioning In charge of Hydro Generator.
  • Provided technical assistance to staff when needed.
  • Assisted in development, design and execution of projects.

Assistant Engineer

BHEL
12.2010 - 06.2015
  • Hydro Generator Erection and Commissioning Parbati II (4 X 200 MW), PELTON MACHINE and PARBATI III (4 X 130 MW), FRANCIS TURBINE- NHPC
  • Provided technical assistance to staff when needed.
  • Assisted in development, design and execution of projects.

Assistant Engineer

BHEL
11.2008 - 12.2010
  • Unit Commissioning In charge Sewa Hydro Electric Project (3 x 40 MW) NHPC
  • Provided technical assistance to staff when needed.
  • Assisted in development, design and execution of projects.

Assistant Engineer

BHEL
11.2007 - 11.2008
  • Unit commissioning in charge of Maneribhali Hydro Electric Project (4 x 76 MW), UVJNL.
  • Provided technical assistance to staff when needed.
  • Assisted in development, design and execution of projects.

Assistant Engineer

BHEL
10.2006 - 10.2007
  • Worked at LARJI HYDRO ELECTRIC PROJECT (3 X 42 MW) HPSEB.
  • Worked as Unit Commissioning In charge independently in commissioning activities.
  • Assisted in development, design and execution of projects.

Assistant Engineer

BHEL
07.2006 - 10.2006
  • Monitored construction progress, updating documents and information.
  • Wrote reports, kept thorough field notes, and logged daily activities.
  • Evaluated and adjusted construction and engineering processes to maximize project efficiency, solving technical problems.
  • Reviewed design drawings and specifications with meticulous attention to detail, identifying errors or areas requiring clarification before construction commenced.
  • Optimized resource allocation for multiple concurrent projects, resulting in cost savings and increased productivity.
  • Coordinated closely with regulatory agencies to ensure compliance with all applicable codes, permits, and regulations throughout the duration of projects.
  • Monitored project budgets closely to identify areas for cost optimization, reducing overall expenses without compromising quality or safety standards.
  • Established strong relationships with clients through regular updates on project status while addressing any concerns that arose during the construction process.
  • Created project schedules and evaluated construction plans using maps and blueprints.
  • Identified potential risks during project planning stages, developing proactive mitigation strategies to minimize disruptions to timeline or budget constraints.
  • Coordinated with subcontractors and consultants to boost productivity and efficiency.
  • Implemented continuous improvement initiatives within the team by analyzing past performances on completed projects and identifying areas for growth or enhancement moving forward.
  • Developed comprehensive technical reports, providing detailed analyses of project progress and recommendations for improvement.
  • Developed cost estimates and project specifications for proposals.
  • Collaborated with architects and designers to create sustainable solutions for challenging infrastructure projects.
  • Enhanced safety measures on site by conducting thorough risk assessments and implementing effective protocols.
  • Resolved complex engineering issues by conducting root cause analysis and implementing corrective actions promptly.
  • Evaluated subcontractor performance through regular audits, ensuring adherence to quality standards and contract requirements.
  • Led cross-functional teams to ensure timely project completion, maintaining open lines of communication between all stakeholders.
  • Contributed to the development of company-wide best practices for engineering and construction, sharing knowledge and expertise with colleagues across various disciplines.
  • Improved project efficiency by implementing streamlined construction processes and coordinating with various departments.
  • Reduced construction timeframes for projects by utilizing innovative engineering techniques and technologies.
  • Spearheaded value engineering efforts, which led to improved design solutions without sacrificing functionality or aesthetics.
  • Mentored junior engineers, fostering a positive work environment and promoting professional development opportunities.
  • Streamlined procurement processes, improving the overall efficiency of material acquisition for construction projects.
  • Interacted with state and local agencies concerning compliance with codes and regulations.
  • Designed utilities and facilities for construction projects.
  • Analyzed and interpreted data to identify trends and recommend improvements.
  • Performed complex calculations to analyze and optimize engineering processes.
  • Designed and implemented quality control processes to facilitate customer satisfaction.
  • Developed high-quality engineering designs and plans to meet industry standards.
  • Implemented new strategies to reduce costs and improve efficiency of the engineering team.
  • Analyzed and interpreted customer requirements to develop engineering solutions.
  • Developed comprehensive engineering documents for all projects.
  • Documented and developed engineering procedures and processes.
  • Collaborated with other departments to facilitate successful project completion.
  • Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.
  • Created detailed reports on engineering activities and findings.
  • Led engineering teams to successfully complete projects on time and within budget.
  • Verified construction documentation to meet client requirements and vision.
  • Implemented automated systems to improve accuracy and efficiency of engineering processes.
  • Conducted technical evaluations of engineering designs and test results.
  • Assisted in developing cost-effective solutions to engineering problems.
  • Trained and mentored junior engineers, providing guidance and direction.
  • Conducted research to identify and evaluate new technologies and concepts.
  • Successfully managed project schedules by implementing effective time management strategies, mitigating any potential delays or disruptions in the construction process.
  • Communicated with staff teams, creating schedules, and recommending employees for promotions.
  • Monitored and evaluated engineering performance to recommend improvements.
  • Developed and implemented procedures to verify compliance with engineering standards.
  • Mentored junior residents and provided constructive feedback on performance, helping them enhance their clinical skills.
  • Enhanced patient satisfaction through effective communication, empathy, and active listening to address concerns and provide tailored care.
  • Implemented quality improvement initiatives to optimize patient care processes, resulting in better service delivery.
  • Resolved customer complaints with empathy, resulting in increased loyalty and repeat business.
  • Managed high-stress situations effectively, maintaining professionalism under pressure while resolving disputes or conflicts.
  • Oversaw daily operations of the department, ensuring smooth workflow and timely completion of tasks.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Provided technical assistance to staff when needed.
  • Assisted in development, design and execution of projects.

Education

GED -

INSTITUTION OF ENGINEERS
Kolkata, India
04.2001 -

High School Diploma -

GOVERNMENT POLYTECHNIC
Lucknow, India
04.2001 -

Skills

Construction supervision

Accomplishments

  • Documented and resolved issue of Severe Stator core damage in Upper Kolab Hydro Electric Project and turbine vibration and alignment issue Unit 03 and MGKLIS Stage I Unit 03 Stator winding repair which was severely hit by rotor as complete rotational parts with top cover lifted by 1.5 meters. Rectification work carried out satisfactorily.
  • Supervised team of 35 staff members at various project as Site Resident Engineer and completed the work successflly.


Software

M s office

Languages

Hindi
Bilingual or Proficient (C2)
English
Bilingual or Proficient (C2)

Interests

Hydro Engineer Expert in erection, commissioning and R & M works

Affiliations

  • American Society of Safety Professionals

Certification

Resident Engineer, Capital Overhauling Works Chunchankatte- Graphite India Limited

Additional Information

  • HPBP Inductee/Promotee Training- INSPIRE FOR PROMOTEE in BHEL from 25.08.2021 to 31.08.2021 in TIRUCHIRAPPALLI, India .
  • HRDI Functional Program's-Web Web: Costing Estimation & Budgeting at CLD-HRDI Online from 20.06.2022 to 20.06.2022.
  • HRDI Managerial & Behavioral-Web Web: Programme on Communication Skills CLD-HRDI Online from 29.12.2023 to 29.12.2023.

GYMASTICS AND KABADDI

  • STATE LEVEL PARTICIPATION IN GYMNASTICS
  • KABADDI DISTRICT LEVEL CHAMPION


Timeline

SENIOR RESIDENT ENGINEER

BHEL
06.2024 - Current

Resident Engineer - Restoration of Unit 03 Mahatma Gandhi Lift Irrigation Scheme Stage 1 Irrigation & CAD Deptt Telangana

12-2023

Resident Site Engineer

BHEL
09.2023 - 05.2024

Resident Site Engineer

BHEL
11.2022 - 08.2023

Resident Site Engineer

BHEL
01.2022 - 08.2022

Resident Engineer, Capital Overhauling Works Chunchankatte- Graphite India Limited

01-2022

Resident Engineer-Capital Overhauling of Unit 03 and Centering and Alignment of Unit 02 Upper Kolab Hydro Electric Project OHPC

02-2021

Resident Site Engineer

BHEL
06.2020 - 08.2021

Resident Engineer - Thrust Collar replacement and Alignment works of Kaplan Turbine Rengali Hydro Electric Project OHPC

03-2019

Assistant Engineer

BHEL
05.2017 - 06.2020

Assistant Engineer

BHEL
06.2015 - 05.2017

Assistant Engineer

BHEL
12.2010 - 06.2015

Assistant Engineer

BHEL
11.2008 - 12.2010

Assistant Engineer

BHEL
11.2007 - 11.2008

Assistant Engineer

BHEL
10.2006 - 10.2007

Assistant Engineer

BHEL
07.2006 - 10.2006

GED -

INSTITUTION OF ENGINEERS
04.2001 -

High School Diploma -

GOVERNMENT POLYTECHNIC
04.2001 -
RANJEET GUPTASENIOR HYDRO ENGINEER