Summary
Overview
Work History
Education
Skills
Roles and Responsibilities
Timeline
Generic

Ranvijay Kumar Singh

Assistant Project Manager - HVAC
Bengaluru,KA

Summary

Proactive manager with demonstrated leadership abilities, strategic planning expertise and problem-solving acumen. Assists senior managers with accomplishing demanding targets by encouraging staff and coordinating resources. Methodical and well-organized in optimizing coverage to meet operational demands.

Overview

10
10
years of professional experience
4
4
years of post-secondary education

Work History

Assistant Manager

Voltas Limited
Bangalore, Karnataka
02.2015 - Current

BHABHA ATOMIC RESEARCHCENTRE, MYSORE

Execution, Commissioning & Handing Over of Low side and High side works which includes installation of water-Cooled chillers, Cooling towers, Pumps, Clean Rooms AHU’S, Ventilation Units, VRF units, Split units, underground chilled water pipeline, Clean rooms ducting and Insulation Works & also Chiller and AHU’S Panel cabling.

BHARAT ELECTRONICS LIMITED, Bangalore

Execution, Commissioning & Handing over of Low side and High side works which includes installation of Water-Cooled Chillers, AHU’S, VRF cassette units, Ducting, Insulation, Pre insulated Pipeline, VAV’S, Dampers & AHU’S Electrical works.

WIPRO IT SEZ, Kodhati, Bangalore

Execution of High and Low side works which includes installation of Water-cooled chillers, cooling towers, Pumps, AHUs, ceiling suspended units, low side piping, electrical, ducting works complete with dampers, VAVs, VRF and grills. Project consists 4 blocks and one data centre. All piping is pre insulated and joints will be done by groove coupling and fittings.

MTB 4 ITPL, Bangalore

Execution of High side works which includes installation of Water-cooled chillers, cooling towers, Pumps, AHUs, ceiling suspended units, FCU, electrical, ducting works complete with dampers, Insulation of ducting and piping, Basement ventilation work with PLC.

NCC - KRIES, Bangalore

Execution of Low and High side works which includes installation of Air -cooled chillers, Primary and secondary Pumps, AHUs, ceiling suspended units, FCU, electrical, ducting works complete with dampers, Insulation of ducting and piping. Total 30 Rmt of height in Auditorium area for duct installation.

BEL Tarbanahalli, Bangalore

Execution of Low and High side works which includes installation of Air-cooled chillers, Hot and Chilled water Pumps, Hot water generators, PAC units, AHUs, ceiling suspended units, electrical panels, SS ducting works complete with dampers, Insulation of ducting and SS piping with each joint of DPT test and 10% of Radiography test.

Senior Executive

Infragreen
Bangalore, Karnataka
03.2013 - 01.2015

COCA COLA, WORLD TRADE CENTRE Brigade Enterprises Limited

Execution, Commissioning & Handing Over of Low side works which includes installation of chilled water cassette units, vertical AHUs, ceiling suspended units for critical areas & low side piping, electrical, ducting works complete with dampers, VAVs, grilles, diffusers.

AMAZON, WORLD TRADE CENTRE Brigade Enterprises Limited

Execution, Commissioning & Handing Over of High side works inside the AHU’S Rooms which includes installation of BTU Meter and MS chilled water pipe, wall acoustic and VFD PANNEL. It also includes the commissioning of all AHU’S.

BRIGADE RUBIX, Brigade Enterprises Limited

Execution, commissioning of high side works which includes primary pump, secondary pumps and air-cooled chillers in terrace for retail area. Separate chilled water tapping with BTU meter installation work inside the shop or office.

SHANGRI LA HOTEL, ADARSH DEVELOPERS, Bangalore

Execution of High and Low side works which includes installation of Water-cooled Screw chillers, Cooling towers, Pumps, AHUs, ceiling suspended units, low side piping, electrical, ducting works complete with dampers, VAVs, grills for banket halls, commissionery kitchen, etc.

Project Engineer

VKHVAC SYSTEMS
Bangalore, Karnataka
08.2011 - 01.2013

BRIGADE WORLD TRADE CENTER, KPMG Bangalore:

Execution of Low side works which includes installation of chilled water cassette units, vertical AHUs, ceiling suspended units for critical areas & low side piping, electrical, ducting works complete with dampers, VAVs, grilles, diffusers.

TULIP DATA CENTER, Bangalore:

Execution, Commissioning & Handing over of Low side work which includes PAC units, ceiling suspended units and high side works which includes primary pump, secondary pumps and chillers in terrace at data center.

HP GR TECH PARK, Whitefield:

Execution, Commissioning & Handing over of Low side works which includes installation of ductable DX units and removal of existing PAC units.

SSGA, RMZ INFINITY, Bangalore:

Execution, Commissioning & Handing over of Low side works which includes installation of chilled water cassette units, ducting works complete with dampers, VAVs, grilles and diffusers.

Education

GED -

SJCIT
Chickballapur
08.2007 - 06.2011

Skills

Sound Knowledge of HVAC & R in Project management

undefined

Roles and Responsibilities

· Receiving BOQ from Planning department, Interaction with Consultant, Clients & Business Associates.

· Coordination with design team for preparing shop drawing.

· Attending the weekly review meetings with clients and ensure work progress as per scheduled commitment.

  • Project scheduling in order to plan for material and man power allocation.
  • Vendor finalization and allocation for different jobs within the cost and maintain the profit margin.

· Installation of the equipment’s as per the approved shop drawings and procedures.

· Monitoring the work progress of entire project with our project team and providing the support.

· Making Billing annexure and approval from clients and collecting Payments in regular intervals.

· Joint Measurement certification from client and also to the Vendors.

· Commissioning of Plant and AHUS with based design Parameters.

· Preparation of AS BUILT drawing.

Timeline

Assistant Manager

Voltas Limited
02.2015 - Current

Senior Executive

Infragreen
03.2013 - 01.2015

Project Engineer

VKHVAC SYSTEMS
08.2011 - 01.2013

GED -

SJCIT
08.2007 - 06.2011
Ranvijay Kumar SinghAssistant Project Manager - HVAC