Summary
Overview
Work History
Education
Skills
Languages
Affiliations
Timeline
Generic
RAVI KUMAR

RAVI KUMAR

Hamirpur

Summary

  • Coordinate MEP installations across all project phases—from planning to commissioning.
  • Review and interpret MEP drawings, ensuring alignment with architectural and structural plans.
  • Ensure compliance with local building codes, safety standards, and project specifications.
  • Facilitate communication between architects, engineers, contractors, and subcontractors.
  • Monitor site progress and resolve technical issues related to MEP systems.
  • Inspect installations to ensure quality control and adherence to design intent.
  • Manage documentation, including submittals, RFIs, as-built drawings, and approvals.
  • Oversee HVAC, electrical, fire protection, and plumbing systems integration.
  • Supervise testing and commissioning of MEP systems.
  • Identify and mitigate coordination issues between different disciplines.
  • Prepare and update MEP schedules and resource plans.
  • Track material procurement, delivery timelines, and inventory.
  • Lead weekly coordination meetings with client.
  • Provide technical support during construction and post-handover phases.
  • Enforce safety protocols and ensure all MEP activities follow regulatory guidelines.
  • Conduct risk assessments and implement corrective actions as needed.

Overview

12
12
years of professional experience

Work History

MEP Coordinator Cum Manager

CBRE
Mumbai
11.2024 - Current
  • Coordinated MEP project activities and schedules for efficient workflow.
  • Assisted in managing subcontractor communications and documentation processes.
  • Supported the development of project plans and timelines for MEP systems.
  • Facilitated meetings to discuss project updates and resolve technical issues.
  • Tracked equipment deliveries and installation timelines across multiple sites.
  • Maintained accurate records of project documentation and correspondence.
  • Conducted periodic inspections of MEP installations to ensure quality assurance standards were met.
  • Assisted in the development of MEP construction plans and specifications.
  • Monitored MEP installation progress to ensure adherence to project schedules.
  • Tracked material deliveries, invoices, purchase orders, and other documentation related to MEP installation activities.
  • Provided training sessions for personnel working on site regarding proper installation techniques for various types of mechanical, electrical, and plumbing systems.
  • Investigated potential conflicts between different trades within the MEP system designs.
  • Developed lists of components, materials and systems needed to establish budgetary requirements.
  • Worked with professionals to solve conflicts between mechanical and electrical systems.
  • Estimated quantities and cost of materials, equipment or labor to determine project feasibility.
  • Surveyed sites, collected measurements, and assessed project conditions.
  • Inspected project sites to monitor progress and conform to design specifications and safety or sanitation standards.

MEP Coordinator

Hilltop ref. engineers Pvt. Ltd.
Mumbai
08.2013 - 07.2024
  • Coordinated MEP project schedules and resources across multiple teams.
  • Facilitated communication between contractors and engineering teams.
  • Oversaw MEP system installations and troubleshooting procedures.
  • Managed project documentation and submittals for regulatory approvals.
  • Implemented quality control measures in construction processes.
  • Provided training to staff on safety protocols and best practices.
  • Monitored MEP installation progress to ensure adherence to project schedules.
  • Identified potential safety hazards associated with MEP systems installed onsite.
  • Tracked material deliveries, invoices, purchase orders, and other documentation related to MEP installation activities.
  • Participated in weekly meetings with contractors to discuss MEP issues.
  • Communicated effectively with clients throughout the duration of the project providing updates on progress made towards completion goals.
  • Conducted periodic inspections of MEP installations to ensure quality assurance standards were met.
  • Coordinated with subcontractors and vendors to ensure timely delivery of MEP equipment.
  • Ensured compliance with all applicable codes related to MEP installations.
  • Prepared as-built drawings for completed projects based on field measurements and observations.
  • Lead and organized team of contractors, subcontractors and representatives to efficiently install systems.
  • Estimated quantities and cost of materials, equipment or labor to determine project feasibility.

Education

Bachelor of Mechanical Engineering -

Shiv Shankar Institute of Engineering And Technology
Jalandhar, P.T.U.
05-2011

Skills

  • MEP project coordination
  • Quality assurance
  • Subcontractor management
  • Project scheduling
  • Equipment tracking
  • Team leadership
  • Client communication
  • Site inspections
  • Cost estimation
  • Material procurement
  • Coordination skills
  • Submittal review
  • RFI management
  • Value engineering
  • Site supervision
  • Shop drawing review
  • Scheduling and planning
  • AutoCAD proficiency
  • Operation and maintenance

Languages

Hindi
Native
Native
English
Advanced (C1)
C1

Affiliations

Project 1:

Project: Office building for Central Excise & GST on plot no. P-94, MIDC at Tarapur, Boisar (W), District Thane, Maharashtra

Year: June 2022 to July 2024

Location: Boisar, Maharashtra

Equipment: Including WATER supply, sanitary installation, electrical installations, street lighting, electric substation, fire alarm, PA System & firefighting system, CCTV, lifts, LAN System,UPS, water pumps, air-conditioning system.

Role: MEP coordinator

Project 2:

Project: Extension building of High court, Patna

Year: May 2017 to June 2022

Location: Patna, Bihar

Equipment: Water cooled screw chiller with high and low side, C/S AHU, electrical LT panel, HT panel, transformer and VRV unit, VRV unit operation etc.

Role: Sr. Site Engineer

Project 3:

Project: Tara Mandal, Patna

Year: October 2016 to April 2017

Location: Patna, Bihar

Equipment: Water cooled screw chiller, Pump, cooling tower, FCU Unit & Floor mounted AHU

Role: Site Engineer

Project 4:

Project: - Existing Vidhan Sabha

Year: July 2016 to September 2016

Location: Patna, Bihar

Equipment: Air cooled scroll chiller with high and low side, Pumps, FCU, cassette unit/S AHU,

FCU and Dx unit etc.

Role: Site Engineer

Project 5:

Project: - Extension of Vidhan Sabha and secretariat complex (Bihar)

Year: August 2013 to July 2016

Equipment: Water cooled screw chiller with high and low side, LT panels, Pump/S AHU, FCU,

Hot water generator etc.

Role: Site Engineer

Timeline

MEP Coordinator Cum Manager

CBRE
11.2024 - Current

MEP Coordinator

Hilltop ref. engineers Pvt. Ltd.
08.2013 - 07.2024

Bachelor of Mechanical Engineering -

Shiv Shankar Institute of Engineering And Technology
RAVI KUMAR