Summary
Overview
Work History
Education
Skills
Certification
Additional Information
Timeline
Generic

RAVI NAWGHARE

Sr. Quality Engineer
Pune

Summary

Effective quality professional bringing proven success in driving continuous improvement initiatives in Quality Engineer roles. Focused and diligent with commitment to fostering corporate mission. Consistently acknowledged for implementing actionable initiative to reduce error rates and optimize company processes.

Overview

10
10
years of professional experience
4
4
Certifications
3
3
Languages

Work History

Sr. Quality Engineer

Wika instrumentation pvt ltd
pune
06.2020 - Current


  • Responsible for quality control of all stages of manufacturing and detect problems before they cause losses in the product or the product quality.
  • Supported quality team members during corrective action updates.
  • Performed quality inspections and drafted reports to detail non-conforming material issues.
  • Contributed to root cause analysis to determine core reason for failures and errors.
  • Helium Test / DP Test / Hydro Test/PMI Test/Hardness Test/Ferrite Test.
  • Material testing by using NDT methods Thermowell inspection & Preparing reports .Working with other internal QA leaders Work with development teams to evolve the automated test portfolio usage in the continuous integration/continuous deployment (CI/CD) flow Understand the pain points, problems, and challenges faced by the automated test engineering teams, provide technical direction to address them and in turn enhance quality and productivity Self-motivated and self-driven, continuously learning, and capable of working both independently and collaboratively.
  • Prepare WPS & PQR .
  • Perform PESO Audit .

Sr. Production Planning Engineer

Wika instrumentation pvt ltd
pune
05.2014 - 06.2020
  • Responsible for Planning related activities like creation of Route & BOM (Bill of Material) preparation, Order Scheduling, Material planning.
  • Preparing Material’s master plan quarterly for the ETM Line to meet the set production targets.
  • Preparation of Route operation & Bill of Material (BOM) as per the Sales Order.
  • Preparing Production Plan on Quarterly, Monthly, Weekly & Daily basis as per the orders received from the customers to achieve the production targets
  • Production Planning Supervision, Scheduling for production. Making sure each process meets Customer Delivery Date (CDD) as per orders possible for production as per production plan.
  • Drawing Study, P&ID Study & QAP study Assembly of instruments like PG/TG / RTD & Thermocouple.
  • Monitoring velocity matrix parameters like On Time to Release(OTR), On Time to Cycle (OTC), On Time to Delivery (OTD) & taking actions with the help of CFT for improving company measures like Request Date Service Level (RDSL).
  • Responsible for packing as per the BOM and preparing the packing list as per Instruments. monitoring 5S Audit .
  • Making weekly assembly plan analysis as well as monthly delivery index to take corrective & preventive action for future project.
  • Maintain data of master gauge NABL calibration .
  • Time study VSM of process.
  • Monitoring various quality initiatives like KAIZEN & POKA YOKE.
  • Manpower handling & training to new employees to achieve daily production target.
  • Start material kitting on shop floor to avoid wrong part fitment & also maintain the material flow with quality.( FIFO )
  • Achievements: Implementation of POKA YOKE on shop floor.
  • Reduce rejection cost of Assembly.

Production Engineer

Span Met Tech Pvt Ltd
pune
02.2013 - 05.2014
  • Decreased in-house production issues by establishing and coordinating sub-contracting and outsourcing requirements and processes.
  • Created engineering documentation for manufacturing processes, equipment specifications and change notices.
  • Performed root cause analysis and implemented corrective actions.
  • Determined root causes of failures and recommended changes in designs, tolerances or processing methods.
  • Analyzed product and process and provided actionable solutions for changes to processes, products or quality standards.
  • Completed and submitted monthly and yearly reports to support executive decision making.
  • Investigated and proposed corrective actions for quality issues.

Education

DME - Diploma Mechanical Engineering

MOD - TECH COLLAGE OF ENGINEERING
Pune
04.2001 -

Skills

    Problem-solving skills

undefined

Certification

V.T level ii mechanical production engineer

Additional Information

1) Meticulous Quality Engineer with 8 years of audit coordination and execution experience.

2) Skillfully manages manufacturing & Quality reviews and implements continuous improvement initiatives to increase quality.

3) Implementation of Kaizen to achieve good quality, efficiency, profitability.

4) Expertise in SOP development and enforcing regulatory compliance

5) Knowledge for job execution at project sites by reading and understanding piping Plans, isometrics and P&ID drawing.

6) Knowledge of Stationary and rotary process equipment used in Chemical plants , process plant and Oil and Gas Industry.

7) Technical knowledge of Instruments with procedures and Codes.

8) Aware of non-destructive testing ( NDT )Thorough Knowledge of welding and fabrication techniques and Codes.

9) ASME,API code Piping and process equipment standards.

10) Aware of Tool box talk and can implement safety at works.

Timeline

Sr. Quality Engineer

Wika instrumentation pvt ltd
06.2020 - Current

Sr. Production Planning Engineer

Wika instrumentation pvt ltd
05.2014 - 06.2020

Production Engineer

Span Met Tech Pvt Ltd
02.2013 - 05.2014

DME - Diploma Mechanical Engineering

MOD - TECH COLLAGE OF ENGINEERING
04.2001 -

V.T level ii mechanical production engineer

P.T Level II Certificate

R.T Level II Certificate

U & R Stamp

RAVI NAWGHARESr. Quality Engineer