Summary
Overview
Work History
Education
Skills
Personal Information
Languages
Personal Qualifications
Disclaimer
Languages
Timeline
Generic

Ravi Kumar Sankar

Riyadh

Summary

To work in a creative environment and effectively contribute to the success of the organization.

Over all 15 Years of working Experience in the International projects executed in KSA,Qatar and India. I have 9 years of working in KAFD (King Abdullah Financial District),Having well versed knowledge in supervising of installation of Electrical system such as MV Switchgear, Transformer, LV switchgear, Earthing, lighting, power, Fire Alarm system, Fire Fighting System, Plumbing, CCTV and BMS. Having good ability to understand functional requirements with Excellent Communication skills.

Overview

3
3
Languages
16
16
years of professional experience

Work History

Senior Electrical Engineer

First Fix (PIF Tower 1.16, kimpton Hotel project 4.05
Riyadh
11.2024 - Current
  • Developed single-line diagrams, load calculations, grounding plans, and panel schedules for new construction and system upgrades.
  • Coordinated with mechanical, civil, and architectural teams to resolve design conflicts and ensure system integration.
  • Managed vendors, RFIs, submittals, procurement schedules, and change orders.
  • Assisted in producing detailed construction drawings, specifications, As-Built packages, and material takeoffs.
  • Supported commissioning activities: continuity checks, insulation resistance testing, relay testing, and system energization.
  • Designed lighting, power, and control systems for commercial and industrial projects.
  • Review and verify contractor work according to NEC, IEC, NFPA, IEEE standards.
  • Managed and resolved requests for information (RFIs) to ensure project clarity., NCRs, site queries, inspection requests, and punch lists.
  • Coordinate with civil and mechanical teams to resolve site clashes, routing issues, and design discrepancies.
  • Coordinated with commissioning teams to support system energization.
  • Conducted redline mark-ups and assisted in preparing As-Built drawings.

Senior Electrical Engineer

Saudi Arabian Baytur Construction Co. (Aramco Tower 2.13, J01 Project,PIF Tower Project
Riyadh
01.2021 - 11.2024
  • Taking off quantities from the drawings and making breakdown BOQ for major electrical items. (Wiring devices, cables, Lighting Fixtures & Low current devices etc...) (1st & 2nd and 3rd Fixing Materials)
  • Installation, Testing Commissioning of Lighting Control System (Dali Control System)
  • Preparation of weekly progress report.
  • Monitor and control of the outgoing and incoming Inspection Request.
  • Coordination with site team Architectural, Civil, Structural, Mechanical, Façade Contractor and other specialist disciplines.
  • Responsibility of monitoring all electrical site activities are conducted under controlled conditions as per Shop drawings.
  • Ensure the Electrical works carried out as per approved shop drawings and within the time frame and progress of the approved construction program.
  • To coordinate with material department & Supplier's for procurement availability of materials at site.
  • Preparing for As-Built Drawings.
  • Coordinating with different agencies involved in the project for quality execution and timely delivery.
  • Planning and execution on the electrical side for MEP projects closely monitoring the construction activities, attending weekly meetings at site with other Engineers and Contractor. Monitor activities of supervision contractor and construction Contractors. Issued punch listing for outstanding works.
  • Preparation of snag list and attending to complete the work for the consultant/ client satisfaction.

Electrical Site Engineer

Samsung C&T,KSA (Tadawul Tower)
Riyadh
09.2017 - 11.2020
  • Broad experience in high rise buildings which serves for commercial space, residential.
  • Worked for TIER 4 data center -Responsible for power containment of substation which is dedicated for data centers, MV cabling, LV cabling and also include Testing & termination of power cables for electrical equipment's such as RPP, PDUS , UPS , CONTROL BATTERY SYSTEM FOR auxiliary power for the switch gears, CRAH Units and earthing system for data centers.
  • Supervision of subcontractors for each and every activity which is carried out in substations, data centers, Fire Alarms & CCTV and BMS Work.
  • Installation, Testing Commissioning of Central Battery system.
  • Experienced in Installation of Busway system (Schneider Electric) rating from 4000 A to 1200 A.
  • Installation of 13.8kv MV Switchgear and Transformer(2500/3500Kva) as per approved shop drawing.
  • Review and scrutiny of the Equipment layouts, equipment specification, BOQ verification.
  • Installation of Cable Trays, Cable Trunking, Bus bars, Cable Installation, Transformers, Light fixture installations, MV and LV panels, and Main Distribution Boards installations complete with Testing & Commissioning activities.
  • Load test carried out successfully for MV & LV Generator's up to 3500 kVA, UPS, PDU.
  • Responsibility of all electrical works carried related to DATA CENTER substations.

Electrical Engineer

Gera Developments Pvt.Ltd., Goa (India) (Gera Imperium Grand, Gera Imperium Star,Gera School, Gera
Goa
11.2015 - 08.2019
  • Preparing work schedule in accordance with civil construction program.
  • Executing installation of HDPE, Geberit, UPVC and PVC for water line and Drainage system.
  • Executing installation of Fire Fighting Service with HYDROSTATIC PRESSURE Testing.
  • Leading the MEP Projects in a proper coordination with Client and consultant.
  • Determine the scope of work, type of project and limitations.
  • Keeping good co-operation with client engineer, consultant and subcontractors. & Successfully complete the project in time and handover to the client.

Sr.Electrical Supervisor

ETA Star Engineering & Contracting CO LLC. (QATAR)(Lusail Multipurpose Stadium)
Doha
06.2013 - 05.2015
  • Preparing work schedule in accordance with civil construction program.
  • Coordinating with different agencies involved in the project for quality execution and timely delivery.
  • Planning for resources as per work schedule.
  • Responsible for preparing inspection request on site progress productivity.
  • Conduct inspection together with consultant.
  • Executing installation of LDP and LRP system for lighting control & Easi Check Panel Addressable.
  • Controlling the manpower, material and other resources.
  • Conducting the Testing and commissioning for the completed works.

Electrical Supervisor

Consolidated Construction Consortium Limited(India)(Goa Airport Project)
Goa
06.2010 - 04.2013
  • Coordinating with client for measurement certification.
  • Timely completion of the job with the schedule.
  • Check the drawings and documents used at site for approvals and compliance with project requirements.
  • To attend all electrical inspection with client/contractor representatives.
  • Prepare the daily report.
  • Preparing Bill for Client and Sub Contractor.
  • Raise (RFI) Request for Inspection for electrical activities.
  • MV Panel Erection and HV Cable Puling and Dressing Work.

Education

Diploma -

Electrical & Electronics Engineering

Skills

  • Auto Cad
  • MS Office
  • Lighting Control System (LCS)
  • MEP Coordination & Integration
  • High-Rise Building Electrical Systems
  • LV & MV Electrical Systems
  • Power Distribution Systems
  • Electrical Load Calculation & Load Schedule
  • Transformer, Generator & UPS Systems
  • LV Panels, MDB, SMDB & DB installation
  • Cable Tray & Cable Ladder Systems
  • Lighting & Small Power Systems
  • Emergency Lighting & Exit Lighting
  • Earthing & Lightning Protection
  • Fire Alarm & ELV Systems Coordination
  • BMS & Building Automation Coordination
  • Testing & Commissioning
  • Inspection & Testing Procedures (ITP)
  • Method Statements & Risk Assessments
  • Shop Drawings & As-Built Drawings
  • Material Submittals & Technical Submittals
  • QA/QC & Electrical Inspections
  • Authority / Consultant Coordination
  • Subcontractor & Vendor Management
  • Site Supervision & Installation Management
  • Project Planning & Progress Monitoring
  • BOQ, Quantity Take-Off & Cost Control
  • Procurement & Material Management
  • RFI, MIR, WIR & Technical Documentation
  • HSE / Safety Compliance
  • AutoCAD & Electrical Design Software
  • Team Leadership & Problem Solving

Personal Information

Senior Electrical Engineer (Transferable Iqama)

Languages

  • English
  • Tamil
  • Hindi

Personal Qualifications

Diploma Electrical & Electronics Engineering

Disclaimer

  • English
  • Tamil
  • Hindi

Languages

Tamil
First Language
English
Advanced
C1
Hindi
Proficient
C2

Timeline

Senior Electrical Engineer

First Fix (PIF Tower 1.16, kimpton Hotel project 4.05
11.2024 - Current

Senior Electrical Engineer

Saudi Arabian Baytur Construction Co. (Aramco Tower 2.13, J01 Project,PIF Tower Project
01.2021 - 11.2024

Electrical Site Engineer

Samsung C&T,KSA (Tadawul Tower)
09.2017 - 11.2020

Electrical Engineer

Gera Developments Pvt.Ltd., Goa (India) (Gera Imperium Grand, Gera Imperium Star,Gera School, Gera
11.2015 - 08.2019

Sr.Electrical Supervisor

ETA Star Engineering & Contracting CO LLC. (QATAR)(Lusail Multipurpose Stadium)
06.2013 - 05.2015

Electrical Supervisor

Consolidated Construction Consortium Limited(India)(Goa Airport Project)
06.2010 - 04.2013

Diploma -

Electrical & Electronics Engineering
Ravi Kumar Sankar