Summary

Civil Engineer with 20+ years of experience across site execution and QS & Billing in civil and infrastructure projects. Strong expertise in quantity take-offs, BOQ preparation, material estimation, JMR verification, subcontractor/client billing, and cost control, with a 100% on-time billing record. Hands-on background in civil works execution, quality control, and site coordination, enabling effective alignment between engineering and commercial functions. Proven capability in contractor negotiations, documentation, and compliance with quality and safety standards.

Overview

20
20
years of professional experience
4
4
Certifications
4
4
Languages

Work History

Executive / Engineer QS & Billing

M/S Amararaja Infra Pvt. Ltd
04.2016 - Current
  • Processed subcontractor invoices with 100% on-time submission rate, ensuring uninterrupted cash flow and positive vendor relations.
  • Performed detailed JMR verification, reconciled quantities, and validated against site measurements and drawings.
  • Reviewed and validated construction blueprints to guarantee accurate quantity take-offs and mitigate billing errors.
  • Negotiated successfully with subcontractors and suppliers, securing substantial cost reductions for the project.
  • Collaborated closely with the site execution team to harmonize progress measurement, invoicing, and material tracking.
  • Managed all QS-related documentation, including RA Bills, MBs, material consumption reports, deviation statements, and audit logs.
  • Detected discrepancies between drawings and on-site implementation, enabling the issuance of RFIs and variation orders.

Deputy Engineer, Site Execution

M/S Amararaja Infra Pvt. Ltd
04.2014 - 04.2016
  • Successfully delivered the Mahadevamangalam Substation project four weeks ahead of schedule through strategic planning and site monitoring.
  • Ensured strict compliance with technical specifications, quality standards, and safety protocols during all construction activities.
  • Coordinated with clients, consultants, and approval authorities, ensuring timely inspections and smooth project clearances.
  • Supervised daily site activities, including workforce allocation, material planning, and contractor management.
  • Maintained precise daily progress reports (DPR), quality checklists, and measurement records to support billing and audits.
  • Proactively identified site issues and implemented corrective measures to avoid delays and rework.

Assistant Engineer, Execution

M/S Amararaja Infra Pvt. Ltd
03.2010 - 04.2014
  • Executed daily civil works in accordance with approved drawings, specifications, and technical standards.
  • Supervised shuttering, reinforcement, concreting, masonry, finishing, and other site activities to ensure quality execution.
  • Planned and allocated manpower, materials, and machinery for effective workflow and timely task completion.
  • Ensured strict adherence to safety procedures, toolbox talks, and on-site hazard prevention practices.
  • Monitored work progress and coordinated closely with site supervisors to meet scheduled targets.
  • Verified workmanship throughout all construction stages and ensured corrective actions as necessary.
  • Coordinated with contractors for uninterrupted execution and promptly resolved field-level issues.
  • Maintained execution logs, including daily work completed, material usage, and site activity updates for internal reporting.

Execution Engineer

M/S Kirloskar Brothers Ltd
03.2008 - 03.2010
  • Executed civil works related to Concrete Volute Pump (CVP) foundations, including excavation, PCC, reinforcement, shuttering, and precision RCC works.
  • Ensured precise implementation of pump house layouts, CVP volute geometry, inlet/outlet channels, and structural elements as per approved GA and structural drawings.
  • Supervised the construction of volute chambers, draft tubes, pump foundations, and equipment support structures, maintaining dimensional accuracy and alignment tolerance.
  • Coordinated closely with mechanical and electrical teams during pump casing placement, alignment checks, embed plate fixing, and anchor bolt positioning.
  • Managed daily execution activities, including material planning, manpower deployment, equipment utilization, and task sequencing.
  • Ensured compliance with quality standards through cube testing, surface tolerance checks, compaction, curing, and concrete pour monitoring.
  • Monitored safety practices and ensured secure working conditions during heavy lifting, shuttering work, confined spaces, and installation phases.
  • Liaised with design teams, manufacturing units, and vendors to ensure smooth integration of civil and electromechanical components.
  • Prepared daily progress reports (DPR), site records, and documented technical deviations to facilitate project control and approvals.

Execution Engineer

M/S Engineering Projects (I) Ltd
06.2006 - 02.2008
  • Executed large-scale irrigation and canal development works under Government of Andhra Pradesh projects.
  • Conducted topographic surveying, leveling, and setting out, ensuring accurate alignment of canals and related structures.
  • Performed earthwork quantity calculations, excavation planning, embankment formation, and verification of contractor measurements.
  • Supervised the construction of canal linings, head regulators, sluices, cross-drainage structures, and RCC works as per design specifications.
  • Implemented rigorous quality control, including soil compaction tests, concrete checks, and material compliance verification.
  • Coordinated daily field activities with contractors, ensuring smooth workflow and timely completion of work fronts.
  • Maintained DPRs, site checklists, and technical documentation for approvals and inspections by government authorities.

Execution Engineer

M/S BNR Constructions
09.2005 - 06.2006
  • Assisted senior engineers in surveying, leveling, and setting out for dam alignment, embankment profile, and foundation areas.
  • Supported the execution of earthwork operations, including excavation, filling, spreading, and compaction in accordance with approved layers and moisture content.
  • Monitored borrow area operations, including soil selection, transportation, and quality control during filling activities.
  • Observed and recorded compaction tests, density tests, and moisture content tests under the guidance of QA/QC teams.
  • Assisted in supervising the construction of core zones, casing zones, filter layers, rip-rap, and toe drainage systems.
  • Inspected revetment works, stone pitching, and crest preparation to ensure satisfactory placement and workmanship.
  • Helped oversee the construction of spillways, surplus weirs, and outlet structures as per drawings.
  • Maintained daily site logs, DPRs, and material usage records to support senior engineers.
  • Coordinated with contractors, machine operators, and labour teams to ensure smooth execution of daily work fronts.
  • Followed safety practices during heavy machinery operations, working near slopes, and waterlogged areas.
  • Reported any deviations, issues, or site challenges to senior engineers for timely corrective action.
  • Learned and interpreted site drawings, cross-sections, embankment details, and technical specifications to assist with execution activities.

Education

Diploma - Civil Engineering

S.V. Govt. Polytechnic
Tirupati, India
03.2005

SSC - undefined

TPPM High School
Tirupati, India
03.2002

Skills

Total Station

Certification

Quantity Surveying, NICMAR, 2019

Software

Auto Cadd

Architectural Cadd

MS office

Edificius (BIM)

Timeline

Executive / Engineer QS & Billing

M/S Amararaja Infra Pvt. Ltd
04.2016 - Current

Deputy Engineer, Site Execution

M/S Amararaja Infra Pvt. Ltd
04.2014 - 04.2016

Assistant Engineer, Execution

M/S Amararaja Infra Pvt. Ltd
03.2010 - 04.2014

Execution Engineer

M/S Kirloskar Brothers Ltd
03.2008 - 03.2010

Execution Engineer

M/S Engineering Projects (I) Ltd
06.2006 - 02.2008

Execution Engineer

M/S BNR Constructions
09.2005 - 06.2006

SSC - undefined

TPPM High School

Diploma - Civil Engineering

S.V. Govt. Polytechnic