Summary
Overview
Work History
Education
Skills
Roles And Responsibilities
Postaladdress
Personal Information
Timeline
Generic

Rewant Kumar Singh

MEP Engineer
NOIDA,UP

Summary

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

16
16
years of professional experience
7
7
years of post-secondary education

Work History

Deputy Project Manager MEP

NCC LIMITED (RYSN INFRA)
5 2023 - Current

Oversee the planning, design, and implementation of mechanical, electrical, and plumbing (MEP) systems on construction projects to ensure they meet all requirements specifications, codes and standards. Collaborate with architects, engineers and construction teams to integrate MEP systems into the overall project design, ensuring compatibility and efficiency.

  • Manage project budgets, including estimating costs associated with materials, labor, and MEP equipment, and controlling costs within financial limits.
  • Plan and supervise MEP system installations, ensuring work is completed on time, on budget and in accordance with project specifications.
  • Perform quality inspections of MEP installations to verify that they meet the highest industry standards and comply with all relevant regulations and codes.
  • Negotiate contracts with suppliers and subcontractors for MEP materials and services, ensuring favorable terms and compliance with project specifications and deadlines.
  • Direct Supervision of Erection, Testing and Commissioning of all major electrical equipment.
  • Perform Erection to Commissioning activities of Transformers ranging from 2 MVA Distribution Transformers to 7.5 MVA 66 KV Power Transformers.
  • Billing and Audit of services (MEP) bills for the work contract awarded to contractors as per technical specification at various projects submitted by contractor/project team.
  • Project execution of electrification work of 33kv s/s with a capacity of 8 MVA including erection installation and commissioning of power Transformer, H.T/L. T switchgear Installation, testing & commissioning of Electrical Work 33/0.433 KV line from in-coming main power & distribution lines, Transformer Testing/Inspection, Knowledge of Transformer Standards, CT, PT and Energy Meter Testing/Inspection, HT CABLE TESTING, Reviewing Calibration Certificate. Firefighting work with pump room installation, hydropneumatics pumping system for water supply etc.


Project Manager

EMUNET Contracts PVT. LTD.
01.2020 - 04.2023

Sr. Engineer (MEP)

ATS NIRMAN PVT. LTD.
05.2019 - 12.2020

SR. ENGINEER (MEP)

ANNIKA PROMOTORS PVT. LTD.
07.2015 - 03.2019

Sr. Project Engineer

M/s MAHAGUN INDIA PVT.LTD
07.2010 - 02.2015

Site Engineer

RPS INFRASTRUCTURE LTD.
08.2008 - 07.2010

Education

High School -

Devi Dayal High School

Intermediate - undefined

B.E. - Electrical Engineering

K.D.K College of Engineering
Nagpur, India
04.2001 - 04.2008

Skills

Technical Planning

Roles And Responsibilities

  • Design, Engineering of, Procurement, Construction & overall Project Management activities. Co-ordination
  • Experienced with standard installation and testing plans and procedures for ensuring quality in project commissioning and good equipment life.
  • Direct supervision of Erection, Testing and Commissioning of all major electrical equipment and components of manufacturing plants.
  • Thorough Execution of HV & LV systems, Transformers, Cabling, HT & LT motor, construction power etc.
  • Experienced in Erection to Commissioning activities of MV & LV motors up to 11 Kv.
  • Perform Erection to Commissioning activities of Transformers ranging from 2 MVA Distribution Transformers to 7.5 MVA 66 KV Power Transformers.
  • Study and Evaluation of Equipment, Electrical Schematics, SLD, BOQs and Technical specifications
  • Monitoring of Project continuously at each stage and guide Erection &Testing agency to Schedule and specifications
  • Billing and Audit of services (MEP) bills for the work contract awarded to contractors as per technical specification at various projects submitted by contractor/project team.
  • Quantity Surveying for all commercial & Residential Projects.
  • Preparation of Deviation statement including quantity measurements, bill of quantities, analysis of rates.
  • Check the final bills as well as R.A. bills if required quantity and taking actual joint measurement with contractor representative.
  • Responsible for planning & monitoring execution of all Electrical works at site.
  • Installation, testing & commissioning of Electrical Work 33 KV line from in-coming main power & distribution lines, transformer, HT/LT panel and Earthling system.
  • Co-ordinate with the Consultants for receiving drawings clarifications and make a report of observation.
  • To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
  • Monitor work progress and quality of work as per approved specifications.
  • Ensure all works are undertaken in a safe manner utilizing a project specific safety plan and adopt safe working culture with help of safety person at site
  • Attend daily Site Meeting for work plan & target.
  • Oversee installation, operation to ensure that equipment is installed and functioning according to specifications.
  • Planning with Contractor's Representatives to maintain the Progress & Quality Aspect.
  • Checking of All Electrical & Other Related Services before Execution.
  • Maintain all Data Related to Electrical Work Recorded the same in Measurement Book and Abstract Sheet.
  • Maintain of R/A Bills.
  • Resolve the Discrepancy Arises During the Work.
  • Responsible for Execution of Electrical Work as per G.F.C. Drawing & Specification Maintaining Quality Aspect within Determined Time Frame.
  • Maintaining all Data Related to Electrical work recorded the same in Measurement Book and Carry over to Abstract Sheet.

Postaladdress

Flat No-202, Lalita Kunj, Apartment, Bengali Road, Patna, Bihar, 800001

Personal Information

  • Date of Birth: 01/05/86
  • Gender: Male
  • Marital Status: Married

Timeline

Project Manager

EMUNET Contracts PVT. LTD.
01.2020 - 04.2023

Sr. Engineer (MEP)

ATS NIRMAN PVT. LTD.
05.2019 - 12.2020

SR. ENGINEER (MEP)

ANNIKA PROMOTORS PVT. LTD.
07.2015 - 03.2019

Sr. Project Engineer

M/s MAHAGUN INDIA PVT.LTD
07.2010 - 02.2015

Site Engineer

RPS INFRASTRUCTURE LTD.
08.2008 - 07.2010

B.E. - Electrical Engineering

K.D.K College of Engineering
04.2001 - 04.2008

Deputy Project Manager MEP

NCC LIMITED (RYSN INFRA)
5 2023 - Current

High School -

Devi Dayal High School

Intermediate - undefined

Rewant Kumar SinghMEP Engineer