To acquire a position that gives me opportunity to accept the challenges, learn the technologies, create ideas in an organization where I can share knowledge with team members and grow with the growth of the organization. Flexible hard worker ready to learn and contribute to team success.
Managed HSE activities at project site, developing systems and procedures, tracking performance, analyzing incidents. Implemented corrective actions and preventive measures. Conducted internal audits and informed management of HSE issues.
Understanding the contract requirement and local regulations, preparing Project HSE Plan, Risk assessments, developing the safe work methods, convening HSE meetings, imparting HSE induction to staff, workmen, sub-contractor workmen, and Visitors, conducting various HSE inspections, monitoring the HSE performance, and appraising the lacunas for improvements.
Ensured adherence to 'Permit to Work' system and enlightened line managers about its importance at worksite.
Implementation of Company Safety Policy, Rules, Work Procedures, Implementation of Checklists, Preparation of Inspection Reports, Accident Advisory Reports, and Statistics.
Evaluated implemented recommendations from accident investigations to ensure effectiveness in preventing future incidents.
Coordinate and organize safety committee meetings as the Secretary, and hold HOD as the chairman.
Coordinated compliance for various statutory requirements including testing and examination of pressure vessels, lifting tools and tackles, safety valves, and more.
Ensured regular communication and collaboration with HSE representatives to perform required safety surveys, audits, special checks, trainings, and promotional activities.
Cultivated an environment of safety consciousness by actively involving employees and promoting a zero accident ethos.
Advice on safety aspects in all job studies, and to carry out detailed job safety studies of selected jobs, especially of hazardous nature.
Regular checking and evaluating the effectiveness of actions taken or proposed to be taken to prevent personal injuries.
Advise the purchase and stores departments in ensuring high quality and also ensure availability of personal protective equipment to employees.
Maintained effective communication and partnership with various teams such as Rescue, First Aid, and Fire Fighters.
Executed cable tray erection and fabrication, ensuring alignment and straightness per drawing standards.
Measured IR value of cables and ensured cable laying work was executed according to cable schedule.
Experienced in following drawing specifications for the erection of junction boxes.
Erected electrical panels and verified alignments and interconnections.
Conducted material inspection of IPBD and SPBD materials, ensuring quality and adherence to specifications.
Ensured checking of current and potential transformers in accordance with provided drawings. Verified integrity of storage section and evaluated bus insulator's size.
Executed earthing projects by accurately interpreting drawings, supervising laying work, and overseeing the fabrication of electrodes and riser rods. Conducted comprehensive checks on all indoor and outdoor installations while measuring ground resistance for optimal performance.
Measured insulation resistance and winding resistance of both LT and HT motors.
Performed CT & PT testing by measuring winding resistance, insulation resistance, ratio test, voltage knee test, and polarity.
Performed oil breakdown voltage testing and OC/SC testing on transformers.
Checked and measured IR value of SPBD and IPBD during IPBD & SPBD testing. Conducted high-potential test for good isolation on both IPBD & SPBD. Assessed IR value of lightning arrestor and surge capacitor within SPBD.
C, C++, WINDOWS, LINUX
I hereby declare that the above information’s are true to best of my knowledge., 08/29/24, Begusarai