Summary

Dynamic Electrical Manager with over 10+ years of hands-on experience specializing in the installation, commissioning, and maintenance of critical electrical equipment within thermal power plants. Adept at leading end-to-end project management processes, including estimating, planning, and executing electrical power projects. Recognized for expertise in managing generating switchyards, power transformers, and FGD system packages. Proficient in overseeing EPC activities, encompassing material handling, erection, testing, commissioning, and ongoing maintenance. Known for delivering projects on time and within budget, while maintaining stringent quality and safety standards.

Lead Electrical Manager (Project) skilled in the meticulous planning and seamless execution of installation, testing, and commissioning activities across a broad spectrum of electrical infrastructure. Proficient in managing Power Transformers (GT’s, ICT’s, ST’s, UT’s, UAT’s & Reactors), Generating Switchyards AIS/GIS Sub Stations, and adept in Electrical Source Supply Arrangement for Wet Limestone FGD Systems within Thermal Power Plants. Committed to delivering superior results for esteemed clientele through precision project management. Highly motivated, dedicated, and team-oriented, I am driven by the pursuit of challenging opportunities that foster professional growth and innovation within the industry.

Overview

10
10
years of professional experience
1
1
Language

Work History

Assistant Manager- Electrical Planning & Execution

Adani Power Limited
05.2025 - Current
  • Executed end-to-end electrical works for Turbine Generator (TG) systems, including generator auxiliaries, excitation interface, and system readiness for synchronization.
  • Supervised installation, testing, and commissioning of AVR (Automatic Voltage Regulator) panels, excitation systems, interlocks, and protection interfaces with generator and switchyard.
  • Managed erection, wiring, termination, and testing of GRP / Relay & Control Panels, ensuring correct logic, protection schemes, and signal integration with control systems.
  • Led execution of Turbine Generator Isolated Phase Bus Ducts (IPBD) from generator terminals to Generator Transformer, covering alignment, supports, expansion joints, enclosure sealing, and earthing.
  • Handled erection, testing, and commissioning of Generator Transformer (GT), Unit Auxiliary Transformer (UAT), Station Transformer (ST) and complete Transformer Yard electrical systems.
  • 2x800 MW Ultra Supercritical Thermal Power Plant Project

Assistant Manager- Electrical Planning & Execution

Toshiba Transmission & Distribution Systems (India) Pvt. Ltd.
03.2020 - 05.2025
  • Planning & Execution of Erection & Commissioning of 33 KV ICOG,11KV VCB Panels in Switchgear and 75 MVA Power Transformer/3No’s of 16 MVA Power transformer.
  • Review of Design, Layout, SLD, Cable Tray, Cable Schedule etc. drawings.
  • Responsible for follow-up and coordination to ensure timely delivery of equipment as per schedule.
  • Planning work schedules and co-ordination with various agencies for the same.
  • Ensuring effective site management and discipline to ensure safe execution of this projects.
  • Supervision of panel base frame work and erection of LT Panels & HT Panels.
  • Checking of Control circuit and schemes of LT & HT Panels as per drawing.
  • Erection & Commissioning of LT, HT motors & transformers.
  • Managing installation & commissioning activity of 220V DC system.
  • Implement Safety standards, JSAs, HIRAs & SOP in the plant during pre-commissioning & commissioning activity.
  • Assisting plant manager during initial plant startups with proper coordination between EPC contractor and O&M team.
  • Client: The Tata Power Company Ltd. C/O-Prayagraj Power Generation Company Limited (3X660 MW), Prayagraj U.P
  • Project: Electrical Source Supply Arrangement for Wet Limestone FGD System at 3 X 660 MW PPGCL, Bara Package

Sr. Engineer (Electrical)- Electrical Planning & Execution

EMC Limited
06.2018 - 05.2025
  • Monitored installation & commissioning activity of 400 KV Switchyard, Power Transformers, MV/LV Switchgears, HT/LT Motors, Bus duct system, GCB, Generator with Brushless excitation system.
  • Monitoring & Supervision of HT/LT Switchgear, Bus duct (IPBD, SPBD & NSPBD) & 220V DC System from Erection stage to commissioning stage as per approved FQP
  • Monitoring & Supervision of Power Transformer from Erection stage to commissioning stage as per approved FQP
  • Monitoring & Supervision of 400 KV Switchyard from Erection stage to commissioning stage as per approved FQP
  • Coordination and Support to Site O & M team for safe predictive & preventive maintenance and condition monitoring.
  • Client: Simhadri NTPC Super Thermal Power Station (4 X 500 MW), Visakhapatnam, Andra Pradesh

Sr. Engineer- Electrical Planning & Coordination

Toshiba Transmission & Distribution Systems (India) Pvt. Ltd.
03.2019 - 02.2020
  • Daily work plan and team management Supervision of Power Transformers & 400 KV GSS Switchyard in Erection, Testing & Commissioning Activity.
  • Scheduling work crews, ordering materials, and tracking progress on a daily basis.
  • Preparing cash flow reports and BOQ (Bill of quantities) for the organization and reporting them to the team lead.
  • Set out detailed works as per the contract drawings, ensuring checks are carried out on a regular basis.
  • Material Procurement & Storage at site level.
  • Analyzing the requirements of the project and preparing the estimations accordingly.
  • Co-ordination with client and sub-contractors for planning execution of work.
  • Monitoring project performance and ensuring that the project is completed according to the agreed upon schedule and within budget guidelines.
  • Project Samples are 1 )> 12 No’s Power Transformer (275 MVA GT’s, 315 MVA ICT’s, 100 MVA ST’s, 35 MVA UT’s & 15 MVA UAT’s) & 400 KV Generating Switchyard Substation Package, Budget ≈ 274 Scope consisted of supply of all components of works & Erection electrical work Project Finished February 2020.
  • Client: UPRVNL Harduaganj Thermal Power Station Ext-II (IX660 MW), Aligarh U.P
  • Project: 12 No’s Power Transformer (275 MVA GT’s, 315 MVA ICT’s, 100 MVA ST’s, 35 MVA UT’s & 15 MVA UAT’s) & 400 KV Generating Switchyard Substation Package

Engineer (Electrical)- Electrical Planning & Execution

Volt-Age Infra Pvt. Ltd.
09.2015 - 06.2018
  • Daily work plan and team management Supervision of installation & commissioning activity of 66 KV Switchyard, Power Transformers, MV/LV Switchgears, HT/LT Motors, Bus duct system, GCB, Generator with Brushless excitation system.
  • Monitoring & Supervision of HT/LT Switchgear, Bus duct (IPBD, SPBD & NSPBD) & 220V DC System from Erection stage to commissioning stage as per approved FQP
  • Monitoring & Supervision of Power Transformer from Erection stage to commissioning stage as per approved FQP
  • Monitoring & Supervision of 66 KV Switchyard from Erection stage to commissioning stage as per approved FQP
  • Troubleshooting related to all types of control wiring or schematic drawing related issues in HT motor, LT motor, Transformers, Battery charger, Hoist, ESP, and Elevator.
  • Preparation & Review of Electrical commissioning & standard operating Procedures for safe commissioning & energize.
  • Client: 15 MW Captive Thermal Power Plant Project C/O-Shree Digvijay Cement Company Limited at Digvijaygram, Jamnagar (Gujarat)

Education

B.E - Electrical Electronics Engineering

MITS – Rajiv Gandhi Proudyogiki Vishwavidyalaya
Bhopal, M.P
01.2015

H.S.S.C - undefined

Mangla Prasad Inter College
Bampur Allahabad, U.P
02.2010

S.S.C - undefined

Hindalco Intermediate College
Renukoot Sonebhadra, U.P
03.2008

Skills

Project Management

DECLARATION

I do hereby declare that the information stated above are true and correct to the best of my knowledge and belief and I bear the responsibility for the correctness of the above-mentioned particulars. Place: [Signature] Date: ROHIT KUMAR SINGH

PERSONAL DETAILS

  • Father’s Name - Ashok Kumar Singh.
  • Date of Birth - 21th October, 1992
  • Gender - Male
  • Marital Status - Single
  • Nationality - India
  • Languages Known - English and Hindi.
  • Strengths - Positive attitude, Sincere.
  • Hobbies - Cooking, listening to music.
  • Passport No. - R7792560

Timeline

Assistant Manager- Electrical Planning & Execution

Adani Power Limited
05.2025 - Current

Assistant Manager- Electrical Planning & Execution

Toshiba Transmission & Distribution Systems (India) Pvt. Ltd.
03.2020 - 05.2025

Sr. Engineer- Electrical Planning & Coordination

Toshiba Transmission & Distribution Systems (India) Pvt. Ltd.
03.2019 - 02.2020

Sr. Engineer (Electrical)- Electrical Planning & Execution

EMC Limited
06.2018 - 05.2025

Engineer (Electrical)- Electrical Planning & Execution

Volt-Age Infra Pvt. Ltd.
09.2015 - 06.2018

H.S.S.C - undefined

Mangla Prasad Inter College

S.S.C - undefined

Hindalco Intermediate College

B.E - Electrical Electronics Engineering

MITS – Rajiv Gandhi Proudyogiki Vishwavidyalaya