Experienced Piping Engineer with a strong background in plant design and execution across oil and gas, metal mining, power generation, and refinery projects. Expertise in designing complex piping systems, layout development, and engineering from concept to commissioning. Proven on-site support for construction and installation activities with a focus on optimizing efficiency and reducing costs while ensuring safety and quality.
Work History
Plant Design and Piping Lead
3 Years
SMS Group | 07.2023 - Current
Led project teams to navigate all stages of development, ensuring timely and budget-compliant delivery. Managed resources and schedules to optimize project execution and meet stakeholder expectations. Coordinated cross-disciplinary efforts to enhance project outcomes and team performance.
H2GS – SWEDEN – 2.1 MTPY HDRI-HBI DRI PLANT
Listed operational areas - H2S/NH3 Regeneration Unit, Combined NH3-Cracking / Elementary Sulphur Plant (Cluse Plant), Jacketed piping, Tar Separation and storage Unit, Cooling water System, Primary Gas Cooler Unit, Electrostatic Tar Precipitator Unit, H2S/NH3 Scrubbing Unit, Naphthalene Scrubbing Unit, Naphthalene Regeneration Unit, Demineralized Water System and Raw Water System.
AM/NS HAZIRA – GAS TREATMENT PLANT (GTP) or BY PRODUCT PLANT
Coordinated design and installation of hydrogen, natural gas, refractory, flare, ammonia, cooling water piping, and water treatment unit.
VUC Bio-energy Heating Plant (CFB Boiler 220 MW fuel) Helen Oy
Identified key work areas. - Boiler Piping like Economizer piping, Feed water piping, Auxiliary steam piping, cooling water piping.
Gwangyang Biomass Power Plant 2x110 MW
Piping Engineer
3 Years 6 Months
General Electric Company India | 09.2016 - 03.2020
Outlined project scope and objectives.
Hinkley Point C nuclear power station (HPC) 2x1630 MW
Identified specific work zones. - Steam turbine generator piping, Feedwater, HP/LP Extraction lines, HP/LP Bypass, Condensate lines, Steam Blowing, BFP Suction and Discharge piping as per ASME B 31.1.
Contributed to design and implementation of OBRA 'C' thermal power extension project (660x2 MW), ensuring compliance with project specifications.
Participated in development and execution of NTPC Telangana super thermal power project (2 x 800MW), focusing on piping system integrity and efficiency.