Summary
Overview
Work History
Education
Skills
Certification
Declaration
Personal Profile
Work Availability
Accomplishments
Timeline
Volunteer
S MARIMAHESWARAN

S MARIMAHESWARAN

Plant Maintenance
Bengaluru,KA

Summary

Dynamic professional with over 23 years of extensive experience in plant maintenance, utility maintenance, total facility management, and water treatment plant operation and maintenance. Committed to driving organizational success through effective contributions and a strong focus on quality and efficiency. Eager to leverage expertise to foster growth within a reputable industry while consistently delivering exceptional results. Passionate about continuous improvement and dedicated to achieving the highest standards in all endeavors.

Overview

23
23
years of professional experience
1
1
Certification
5
5
Languages

Work History

Senior Manager Operation & Maintenance

Leadec India Private Limited
02.2025 - Current
  • Exposed to Coordinate with OEM vendors for Erection and commissioning of Utility Equipment’s 220KV/ 11KV 15MVA Transformers, 220KV GIS breakers, BMS of 220KV SS, IR Screw compressor 1850 CFM, IR Centrifugal compressor 8000CFM, Cummins 2000KVA HT Generators, Trane Chiller 7000TR etc. Handling a Team of 127 members including Site Manager, Deputy managers, EHS In charge, Site HR Team Leaders and Technicians.
  • Utility Maintenance and WTP, ZLD Plant O & M
  • Site: Exide Energy Solutions Limited, Devanahalli

Senior Manager

Leadec India Private Limited
01.2023 - 01.2025
  • Exposed to Plant Facility Management which includes High Bay Lamps, Low Bay Lamps, Street Lights, PCC, MCC, LDB, Earth pits, HVLS Fan, Air Circulators, Exhaust Fans maintenance with a team of 120 members including Manager, Deputy Manager, Engineers, Team Leaders and Technicians.
  • AMC which includes Centrifugal pumps, Multistage pumps, Exhaust Fans, Conveyors, Robots, Welding Machines, Lifters, Hydraulic power packs, Motors, Machine control panel, AHU, EAC with a team of 150 members including Manager, Deputy Manager, Team Leaders and Technicians.
  • Facility Maintenance and AMC
  • Site: Toyota Kirloskar Motors Private Limited

Senior Team Leader

AT India Auto Parts Private Limited
08.2013 - 12.2022
  • Exposed to O&M of 11KV/440V substation with 2000KVA X 3nos Universal make transformers, 3000KVA X 1no Thirathai make rectifier transformer & 3000KVA X 1no EMCO make rectifier transformers, 750KVA X 2nos Cummins make Diesel Generator, 750KVA X 1no Cummins make Natural Gas Generator. 400CFM X 5nos & 800CFM X 1no Kaiser make Screw compressor, Building Management, Lighting Management, Water, Air & Power Management, CETP O&M Management, MIS Management, Spares Management, AMC Management, Open access Power purchase Management, Cost Saving Activity Management, Budget Planning and Execution, IATF and EMS Management, Certified Internal Auditor for EMS, Technical Training to Team members, Adhere 5’s at workplace, Safety Management, SAP PM Module
  • Plant Maintenance

Maintenance Engineer

Macellan Integrated Services India Private Limited
09.2009 - 07.2013
  • Exposed to Material Handling & Utility Equipment’s – Voltas, Godrej, Linde, Ford, Farm-track, Lancer and Boss make up to 6-ton capacity. Fabrication works & Machine shop equipment’s Power distribution with 7.5Mw captive diesel generator power plant with manual & auto synchronizer, EB of 22KV HT substation with shops associated substations of transformers of 500 KVA to 6.3MVA.100 to 1500 CFM reciprocating & screw compressors, Water Distribution and balancing management, Mini boilers of Thermax make (200 & 400 Kg/h), RO plants of 25 lit to 30 KL/h, MIS systems, EEI of equipment's, Shift manpower maintaining, Maintaining 5S, Conducting Technical & Personal Training, Logistics Management, Disposal of Hazardous & Non Hazardous waste as per statutory norms of the state. Knowledge in ERP & SAP PM Module.
  • Plant Engineering Services
  • Site: Ashok Leyland Unit 2

Maintenance Engineer

Suzlon Energy Electricals Ltd
06.2008 - 09.2009
  • Exposed to O&M of 33KV/440V Substation with 2000KVA Suzlon make transformer 1no,500KVA Sterling&Wilson make DG 2nos with Auto Synchronizer, 500CFM ELGI make Screw compressor 2nos, 500CFM ELGI make Refrigerant Air dryer 2nos, Schleuniger (crimp center 62) make cable processing machine, Perforex make CNC drilling, tapping & milling machine
  • Plant Maintenance Control Panel & Generator Unit
  • Job profile:

Maintenance Executive

Indus Fila Ltd
08.2007 - 06.2008
  • Exposed to O&M of 11KV/440V Substation with 2000KVA Kirloskar make transformer 4nos,1500CFM Atlas Copco make Screw compressor 4nos, 3000CFM Atlas Copco make Refrigerant Air dryer 2nos,Maintenance of Piconol Omni 800&800+ looms 92nos, Sizing & Warping machine Benninger make each 1no, Grey cloth super inspection machines make M-Tech – 1no, Centralized Humidification plant make Luva 1no, Singeing & Desizing machine, Prewasher & Mercerizer machine, Pad steam machine make Brugman each 1no, Pad Dry machine make Brookner 1no, Stenter machine make Brookner 2nos & M-Tec make Sheering & Cropping Machine.
  • Plant Maintenance

Maintenance Shift Supervisor

ER Textiles Ltd
10.2005 - 08.2007
  • Exposed to O&M of 33KV/440V Substation with 1500KVA Kirloskar make OLTC transformer 2nos,750KVA Cummins make DG 2nos, 500KVA Servo Stabilizers make Servomax – 3nos,1000CFM ELGI make Screw compressor 2nos, 1500CFM Atlas Copco make Screw compressor 2nos, 1500CFM ELGI make Refrigerant Air dryer 2nos, 2000CFM Trident make Refrigerant Air dryer 1no & 2000CFM GEM make Refrigerant Air dryer 1no,Maintenance of Toyota make Jat 610 Series Air jet looms 148nos, Sizing & Warping machine Benninger make each 1no, Grey cloth inspection machines make Almac & Vibrant each 1no, Centralized Humidification plant make Best Air.
  • Plant Maintenance

Shift In charge

Premier Mills Ltd
09.2002 - 09.2005
  • Exposed to O&M of Softener Plant 500KLD, Common Effluent treatment plant 1500KLD, Wastewater Recovery RO plant 1500KL/Day & Mechanical vapor recompression evaporator plant 1000KL/Day as per TNPCB norms. Maintain the records for ISO 9001 & 14001.Manpower utilization & execution. Training to the new Joiners, Maintaining 5S in the workplace.
  • Wastewater Treatment System
  • Payroll: Windsor Sathyam Engg. Co. Chennai.

Education

Diploma - Electrical & Electronics

Sankar Polytechnic College
Sankar Nagar, Tirunelveli
04-2002

S.S.L.C. - Maths, Physics, Science

Senai Thalaivar High School
Tirunelveli
04-1999

Skills

Workforce skill enhancement

Certification

“C” License No: C 37265 Valid up to 2028-12-16

Declaration

I hereby declare that the above information’s are true and best of my knowledge. Place: Yours Truly Date: (S. MARIMAHESWARAN)

Personal Profile

  • Name: S. MARIMAHESWARAN
  • Father’s Name: S. SORNAM (Late)
  • Date of Birth: 1984-09-06
  • Nationality: Indian
  • Marital Status: Married
  • Languages Known: Tamil, English, Telugu & Kannada
  • Communication Address: 29/46 D2, Shanthi Nagar West, 3rd Main Street, 2nd Cross, Hosur – 635109 Tamil Nadu.

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Accomplishments

Handled overall manpower of 250 Employees

Timeline

Senior Manager Operation & Maintenance

Leadec India Private Limited
02.2025 - Current

Senior Manager

Leadec India Private Limited
01.2023 - 01.2025

Senior Team Leader

AT India Auto Parts Private Limited
08.2013 - 12.2022

Maintenance Engineer

Macellan Integrated Services India Private Limited
09.2009 - 07.2013

Maintenance Engineer

Suzlon Energy Electricals Ltd
06.2008 - 09.2009

Maintenance Executive

Indus Fila Ltd
08.2007 - 06.2008

Maintenance Shift Supervisor

ER Textiles Ltd
10.2005 - 08.2007

Shift In charge

Premier Mills Ltd
09.2002 - 09.2005

Diploma - Electrical & Electronics

Sankar Polytechnic College

S.S.L.C. - Maths, Physics, Science

Senai Thalaivar High School
S MARIMAHESWARANPlant Maintenance