Results-driven Highway Infrastructure Professional with 12+ years of experience in EPC highway projects, specializing in project execution, construction management, planning, quality control, resource optimization and stakeholder coordination. Experienced in executing highway projects for BRO, NHIDCL and other infrastructure authorities, including challenging hilly terrain projects.
Work History
Deputy Project Manager (Highway)
2 Years 3 Months
Shree Girrajee Infra Heights Pvt Ltd. | Poonch, Jammu Kashmir | 08.2024 - Current
Widening and Strengthening - Upgradation to 2 Lane with Paved Shoulder from Existing Chainage Km 192+980 To Km 229+820 (Design Chainage Km 162.800 To Km 198.180) (Package -VIII) Under 31 TF on Akhnoor - Poonch Road (NH-144A) in the UT of Jammu & Kashmir Under Project Sampark, Border Roads Organization (BRO) on EPC Mode.
Managed the execution of highway widening and strengthening projects ensuring high-quality standards and timely completion.
Led technical reviews and value engineering sessions to enhance design efficiency and cost-effectiveness during highway upgradation.
Implemented EPC (Engineering, Procurement, and Construction) project management methodologies to optimize resources and workflow.
Developed and implemented project schedules and resource allocation plans, optimizing onsite productivity and minimizing delays.
Supervised traffic management and detour planning, minimizing disruption during highway construction activities and maintaining project timelines.
Ensured compliance with safety protocols and regulatory requirements for highway construction in challenging terrains of Jammu & Kashmir, enhancing project safety.
Conducted detailed site inspections and audits to ensure adherence to design parameters and contract specifications.
Project: Rehabilitation and Up-Gradation to 2-Lane with Paved Shoulder from existing chainage km 102.00 to km 134.950 (Design chainage km 90.150 to km 116.980), Package - V including construction of Naushera Tunnel (Total length - 700m) under 31TF on Akhnoor - Poonch Road (NH - 144A) in the UT of Jammu & Kashmir under project Sampark, BRO on EPC mode.
Employer: Shree Girrajee Infra Heights Pvt Ltd.
Client: Border Roads Organisation
Managed construction of critical infrastructure such as tunnels and paved shoulders, enhancing roadway safety and capacity.
Led technical reviews and value engineering sessions to enhance design efficiency and cost-effectiveness, ensuring compliance with safety protocols and regulatory requirements in challenging terrains.
Coordinated with Border Roads Organization, contractors, and local authorities to meet project milestones on Akhnoor - Poonch Road upgrade.
Collaborated with stakeholders including Border Roads Organization, contractors, and local authorities to ensure timely project progress.
Executed advanced quality control measures to enhance durability and performance of highway pavement structures.
Conducted technical reviews and value engineering sessions to improve design efficiency and cost-effectiveness during highway upgradation projects under Border Roads Organization (BRO).
Project: Khellani-Kishtwar-Chattrro-Khanabal Section of NH-244 (Jammu And Kashmir) EPC Mode PKG-5
Employer: Shree Girrajee Infra Heights Pvt Ltd.
Concessionaire: Shrikhande Consultants Pvt. Ltd.
Client: National Highways & Infrastructure Development Corporation Ltd
Led cross-functional teams and coordinated with concessionaires and government bodies to successfully execute large-scale EPC highway projects within planned budget and timeline.
Coordinated resource deployment, including manpower and machinery, to complete projects on time and within budget.
Deployed personnel and machinery for daily operations efficiently.
Monitored project costs and schedules, reported progress to senior management, and ensured alignment with project objectives.
Deployment of man & machinery for day to day works in economical way of utilization.
Project: Rehabilitation and upgradation of Sonauli to Gorakhpur section (Km. 0+000 to Km.80+000) of NH-29E in Uttar Pradesh to two-lane with paved shoulders on EPC mode under NHDP Phase-IV
Monitored work progress to align with project time schedule.
Reviewed and verified measurements of completed work to ensure accuracy.
Ensure all works performed conform to the lines, grade, cross on the drawings.
Performed various tasks on-site in accordance with the technical specifications, environmental stipulation of construction contract documents.