

With 9+ years of progressive experience in the oil & gas E&I field, I have delivered measurable improvements in equipment reliability, reduced downtime, and enhanced overall maintenance efficiency. I have contributed to major construction projects, commissioning activities, and plant maintenance operations, including DG set maintenance, field instrument calibration, and troubleshooting of complex E&I systems. My leadership in coordinating teams, enforcing safety standards, and executing high‑risk tasks has consistently supported smooth project delivery and sustained operational performance. I bring a strong blend of technical expertise, hands‑on field experience, and a proactive approach to solving engineering challenges.
Experienced in working with schematic diagrams, GA (General Arrangement) drawings, and panel layout drawings
Ability to interpret P&ID (Piping & Instrumentation Diagrams) for equipment connections and process flow
Familiar with as‑built drawings, revision tracking, and updating drawings after site modifications
Strong understanding of ISO symbols, electrical symbols, and engineering standards used in technical drawings
Improved equipment reliability by leading preventive and predictive maintenance programs, reducing unplanned downtime and enhancing asset performance across critical oil & gas facilities
Executed major construction and commissioning activities, including DG set maintenance, loop checking, field instrument calibration, and functional testing of complex E&I systems
Diagnosed and resolved E&I faults in PLCs, control panels, transmitters, and protection systems, ensuring safe and continuous plant operations
Supported plant operations through routine inspections, shutdown planning, and execution of corrective actions to maintain stable production
Skilled in using calibration tools such as HART communicators, dead‑weight testers, decade boxes, multifunction calibrators, and test benches
Performed precision calibration of field instruments including pressure, temperature, flow, and level transmitters to ensure accurate and reliable plant measurements
Executed calibration of control valves, positioners, and actuators, verifying response accuracy and optimizing loop performance
Calibrated safety‑critical devices such as gas detectors, flame detectors, vibration sensors, and shutdown systems in compliance with industry standards
Performed loop checking and functional testing of instrumentation circuits during commissioning and maintenance activities
Follow LOTO procedure
Erection and commissioning
All type cable and motor insulation resistance check using IR(Insulation Resistance) tester
Cable size calculation as per load
ACB maintenance work
All type of instruments like PT, TT, TG, LT, FT VT, GD, FD installation and terminations
Electrical Supervisor License
The Ust-Luga GPP (part of the Ethane-Containing Gas Processing Complex)
Electrical Supervisor License
Diploma In Computer Application
Vocational Training From Amarkantak Thermal Power Plant Chachai Shahdol M.P.