I have been working for SQUARE DETAILING PVT LTD From Oct. 2018. I have experience in Tekla software higher version with fast & efficient Modeling/ Detailing skills in multiple tasks. More than 12 years of experience in AISC, OSHA projects/ modeling in steel. Strong problem-solving skills and ability to work under pressure to meet tight deadline. Experience in working with international & multidisciplinary teams is a plus. 3D Modeling of structural platforms, equipment supporting platform, Conveyor, Pipe rack etc and extracting the design general arrangement drawings as the basic input to the detail engineering, creating shop drawings, and detailing steel structures.
Company Profile:
This Company deals steel detailing including Main steel, stairs and misc. for AISC standards.
Working Exp.
GA drawing creation as per customer requirement, Assembly drawing creation for the customer approval.
A) 1.Project Name:- Cosira Coal Stockyard (Conveyor)
2.Location: - South Africa
3.Nature of Project : - Conveyors for shipping and handling Coal.
Scope of Work - Shop & GA Drawings Detailing.
4.Time Taken:- 6 Months
5.Software Used: - Tekla 17.1
B) 1.Project Name: - King Street Station
2.Location: - US
3.Nature of Project : - Critical wire frames like Trusses and Frames and Other curved profiles involved in the project.
Scope of Work - Shop Drawings Detailing.
4.Time Taken: - Around 3/ 4 months.
5.Software Used: - Tekla V14.1.
C) 1.Project Name:- Dowco (Stadium)
2.Location: - Canada
3.Project Work Done : - We are working on detailing part.
4.Time Taken:- 3 Months
5.Software Used: - Tekla 17.1
D) 1.Project Name:- Reliance
2.Location: - Gujrat, India
3.Project Work Done : - Refinery project, This Project consists ladders, stairs, handrail, frames, columns, inclined beams, bracings etc. We are working on detailing part.
4.Time Taken:- 3/4 Months
5.Software Used: - Tekla V18.0
Company Profile:
ENCON is a multidisciplinary oil and gas engineering and consultancy start-up company that is founded and managed by a team of talented and experienced Oil and gas projects.
Working Exp.
Structural 3D modeling as per Contract Drawings, GA drawing creation as per customer requirement and get approval from the customer, Numbering the assembly drawing & Assembly/ Part drawing creation for the customer requirement, Resolve the production related queries from the production team.
A) 1.Project Name:- KPJV BRIDGE
2.Location: - Kazakhstan, Russia
3.Nature of Project :- 3d Modeling like ladders, handrail, frames, inclined beams, bracings etc. Extraction of 2D drawings from 3D model and Preparation of construction drawings including checking errors/mismatches.
4.Time Taken:- 3 Months
5.Software Used: - Tekla V20.0
B) 1.Project Name:- STEAM BOILER
2.Location: - Russia
3.Nature of Project : - This Project consists Modeling like ladders, handrail, frames, inclined beams, bracings etc.
4.Time Taken:- 3/4 Months
5.Software Used: - Tekla V20.0
C) 1.Project Name:- PRODUCE WATER
2.Location: - Russia
3.Nature of Project : - This is Pumphouses Building consists Modeling & Detailing like ladders, stairs, handrail, frames, columns, inclined beams, bracings etc.
4.Time Taken:- 3 Months
5.Software Used: - Tekla V20.0
Company Profile:
HIDADA as a subsidiary of Xenel Group, HIDADA is a leader in the engineering & fabrication of quality steel products and a contractor for construction of storage tanks in the region. production capacity from 2,000 tons to over 200,000 tons of diversified and specialized steel products.
Working Exp.
Structural 3D modeling as per Contract Drawings, Preparing Bill of Material & Bill of Quantity, Numbering the assembly drawing, GA drawing creation as per customer requirement and get approval from the customer, Assembly drawing creation for the customer requirement. Preparing of multisheet Projects. Distribution of drawing generation work among group detailers in consultation with project engineer. Resolve the production related queries from the production team. Create CNC files for the plate cutting as per the production team requirement.
A) 1.Project Name:- MA'ADAN (Conveyor)
2.Location: - Saudi Arabia
3.Nature of Project : - Critical wire frames like Trusses and Frames and Other curved profiles involved in the project We are working on Structural designing and connection.
4.Time Taken:- 10 to 11 Months
5.Software Used: - Tekla 17.0
B) 1.Project Name:- Aramco (Tower Building)
2.Location: - Saudi Arabia
3.Nature of Project : - Saudi Arabian oil company, We are working on Structural 3D Modeling, Connection of Column, Beams, Handrail, Stair & Detailing part.
4.Time Taken:- 9 to 10 Months
5.Software Used: - Tekla 17.0
C) 1.Project Name:- FADHILI (Piperack)
2.Location: - Saudi Arabia
3.Nature of Project : - FADHILI Gas Plant - Trusses and Frames involved in the project. We are working on Structural 3D Modeling, connection & detailing part.
4.Time Taken:- 5 Months
5.Software Used: - Tekla 17.0
D) 1.Project Name:- CIRCULAR
2.Location: - Saudi
3.Nature of Project : - Critical wire frames like Trusses and Frames and Other curved profiles involved in the project We are working on Structural designing and connection.
4.Time Taken:- 5 Months
5.Software Used: - Tekla 18.0
Company Profile:
Structural Steel Detailing and Fabrication sector and have been multiple projects with aggressive schedules. Using Qnect software structural steel connection design and 3D modeling through cloud-based engineering.
Working Exp.
Structural 3D modeling as per Contract Drawings, Preparing Bill of Material, Bill of Quantity for the
material procurement, GA drawing creation as per customer requirement and get approval from the
customer , Assembly drawing creation for the customer approval, structural fabrication, Numbering the
assembly drawing. Resolve the production related queries from the production team.
A) 1.Project Name:- KMEC-TT02
2.Location: - US
3.Nature of Project : - Tower Building, 3D Modeling & Connection of Column, Beams, Handrail, Stair.
Scope of Work - 3D Modeling, Connection, Raising RFI's, Edit GA & Shop Drawings.
4.Time Taken:- 3 Months
5.Software Used: - Tekla V2019
B) 1.Project Name:- CV-436 (BIM)
2.Location: - Australia
3.Nature of Project : - Lump transfer Conveyor.
3D Modeling of Shuttle Truss, Bend Pulley Frame, Trusses.
Scope of Work - 3D Modeling, Connection, Raising RFI's, Edit GA & Shop Drawings.
4.Time Taken:- 4/5 Months
5.Software Used: - Tekla V2019
C) 1.Project Name:- GREENWICH HS , SPANZIANO HS, WINDEREMERE SCHOOL , HOTCHKISS SCHOOL, GOVERNEUR HS, BIRCH SCHOOL, NEW LONDON HS, SPRINGFIELD COLLEGE, BULLARD HAVENS HS, SPANZIANO MIDDLE SCHOOL, METRO CENTER.
2.Location: - US
3.Nature of Project : - RAM Drafting & Design specializes in School Building.
4.Scope of Work -
4.Time Taken:- 2/3 Months per project
5.Software Used: - Tekla 2020, 2021, 2022 & 2024
Marathi, Hindi & English
My career goal is to achieve professional excellence in my work through a process of learning in combination with experience. And I also extensively
Utilizing my skills to successfully achieve my goals assigned to Me in the field of Auto-CAD & X-Steel. Looking forward for a challenging enthusiastic & objective promising carrier ahead to you is my dedicated effort.
I hereby declare that all the above information furnished by me is true.