•Managing the safe installation, physical placement, alignment, and testing of primary heavy electrical equipment including Power Transformers, Vacuum Circuit Breakers (VCBs), CT/PT units, and Lightning Arresters.
•Executing and monitoring comprehensive substation control wiring to guarantee precise termination of all control, protection, signaling, and auxiliary circuits as per multi-line schematic drawings.
•Supervised construction, renovation, and modernization of 33/11KV outdoor and indoor substations in Nawada, Bihar, ensuring compliance with safety standards and project specifications.
•Preparing complete scaled maps of electrical networks spanning from 33/11KV substations down to HT & LTdistribution setups.
•Mobilized workforce, deployed machinery and materials safely, and planned schedules to ensure timely milestone completion while drafting and processing Joint Measurement Certificates (JMC) and managing billing cycles for subcontractors and clients.
•Performed continuous physical material reconciliation and resolved local Right of Way (ROW) issues to maintain project timelines.