Languages
Summary
Overview
Skills
Accomplishments
Work History
Education
Timeline
Sahaya Milton  Johnrose

Sahaya Milton Johnrose

Kanchipuram
Every problem is a gift—without problems we would not grow.
Tony Robbins

Languages

English
Intermediate
B1
Hindi
Elementary
A2
Tamil
Bilingual or Proficient (C2)

Summary

Experienced Professional with end to end expertise in development of Expendable and Returnable Packaging solution for exports and domestic, Material Flow Engineering and handled one Green field project in 10+ years.

Overview

11
11

Years of professional experience

3
3
Languages

Skills

  • Expendable and returnable packing solutions (Corrugation, wood and Steel)
  • Warehouse Management
  • Material flow analysis
  • Project management
  • Process development
  • LEAN,JIT,KANBAN,5'S & KAIZEN
  • IT Skills – MS office suite
  • Power BI (Basics)

Accomplishments

  • 18 New model launch packing designed and implemented successfully and handover for series production
  • 13 running models where converted from Steel rack packing to Corrugation box (GLT) to achieve the cost saving up to 25% per truck
  • Lot size 6 unit to 12 unit converted for 12 models to achieve container saving up to one 40'HC
  • Reduced packing BOM preparation time from 3 days to 1 day by creating excel macro sheet for CKD monthly BOM preparation
  • PPM trend reduced from 250 to 27 by introducing new packing methodology
  • Road map set for 2025 to achieve the sustainability target to reduce the usage of 1024 Tons of corrugation which is equal to 17408 trees

Work History

Manager - CKD Export Packaging

Daimler India Commercial Vehicles
Kanchipuram
09.2018 - Current

Leading a team of 2 Engineers & 12 packers for managing entire product projects and packaging cost saving projects

  • Developed new packing concepts for Vietnam, Malaysia, Kenya, South African and Indonesia (overall sixteen variants)
  • Coordinate with overseas customers to resolve pilot packing issues
  • Interacted with inspection department to address and resolve packaging issues
  • Developed packaging process to improve productivity and meeting daily requirements
  • Support to production & CFT for achieving common goal and handling day to day operation issues
  • Streamlined packing process at CKD line by developing PPS (packaging process sheet) to ensure 100% packaging instruction adherence
  • Estimated costs for new business with effective packing solutions based on customer requirements
  • Identified areas for business improvements and utilized client feedback to drive developments

Achievements:

  • Achieved 25 % cost saving per truck by converting Metal packing to corrugation and wood packing solutions
  • Improved lot size of 6 unit to 12 unit with customer approval to provide container utilization which gave up to One 40' HC per per lotsavings in container

Engineer - Material Flow and Packaging

Ford Motor Company
Sanand
03.2018 - 08.2018

Managed team of 4 company employees and 8 contract employees, overseeing training, and professional growth of employees

Role in External packaging

  • Coordination with supplier to implement proposed packaging concept for new launch programs
  • Ensure that Ford Global packaging standards are 100 % followed by supplier and train them to follow standard
  • Follow up with external customers(varies county)for export packaging approval (Engines, Head, block, crank, Short block & Long block)
  • Ensuring ECM changes parts updated with new packing methods and same was approved by CFT
  • Review weekly ISPR and TDL concerns to avoid packing and transport damages

Role in Internal packaging:

  • Design new packing concept for internal movement parts
  • Increasing line side efficiency by internal packaging concept development
  • To identify / review action plan to reduce unsafe conditions /acts and maintain injury free man-day

Role in Material flow :

  • Designing layout, PFEP and simulate material flow based on JPH and plan for required warehouse and equipment
  • Developed material flow based on simulation study to achieve full JPH in machining and Engine Assembly plant
  • Based on simulation data allocating location in HI-Bay to follow FIFO and Market place flow with standard levels of error proofing
  • Developed material flow with help of PFEP and standardize smooth flow for line side delivery
  • Design lean inventory level at line side and Warehouse
  • Coordinate with Plant IT team to implement delivery system like SKS, SMART and OBL

Key Achievements:

  • Successfully implemented packaging, warehouse location and line feeding setup in SMART & SKS system for 250 parts during Panther Engine (2.0 L) launch, major Program for Ford Sanand Engine Plan

Team Leader - Material Flow and Packaging

Ford Motor Company
Sanand
11.2013 - 02.2018

Managed team of 4 company employees and 8 contract employees, overseeing training, and professional growth of employees

Role in Material Flow:

  • Streamlined Material Flow for GREEN FIELD Operation from Dock to Warehouse to – Kitting /Sequencing to POF (For Raw Material) and End of line to Dock (For Finish Good)
  • Supported Complete Material flow Projects from Greenfield site to launch of saleable Engine for New-Figo Aspire Vehicle and export markets
  • Implementing layout, PFEP for new projects (DV5 and Dragon Engine) with team member support
  • Implementing flow with help of PFEP and standardize smooth flow for line side delivery

Key Activities:

  • Trained 25+ manpower for Receiving, Shipping, Export and Warehouse operation part of green field
  • Successfully implemented packaging for 300+ parts; major Program for Ford Sanand Engine Plan (DV5, Dragon)

Role in External packaging:

  • Resolve day to day operation packaging issue coordinating with supplier
  • Validating packaging with approved form and share feedback for improvement
  • ECC change packing validation and on time improvement
  • Identifying opportunity for packing density improvement

Key Activities:

  • Developed VBA program for ISPR and TDL tracker to ensure all issues are reported properly and solutions are getting tracked for future reference

Role in Internal packaging:

  • Ensure 100% internal repacking material availability as per loop qty
  • On time maintenance schedule and rework completion
  • Zero contamination on internal containers which are used for line side delivery
  • Ensuring 100% sign-off for internal repacking method for import parts

Key Activities:

  • Developed internal packing material cleaning tracking system using excel VBA program to ensure 100% cleaning process

Team Member - Warehouse Operation

Ford Motor Company
Chengalpattu
05.2011 - 10.2013
  • Pursued learning opportunities to advance knowledge and take on leadership position.
  • Ensure shortage parts delivery by coordinating with supplier and SCM
  • Report out daily shortage part for day production
  • Follow up with material gate to ensure on time truck invert
  • Clearing Empty return to JIT suppliers to avoid line stop
  • Attending daily rejection meetings to clear all quality issue parts
  • Follow up with supplier and quality team for rejection parts clearance

Key Activities:

  • Controlled incoming packaging deviation by 80% with continuous follow up by raising ISPR
  • Contributed to team success by completing jobs quickly and accurately.

Education

High School Diploma -

Sun Polytechnic College, Kanyakumari
04.2011

SSLC State Board -

St. Antony’s Higher Secondary School, , Kanyakumari
04.2008

Timeline

Manager - CKD Export Packaging - Daimler India Commercial Vehicles
09.2018 - Current
Engineer - Material Flow and Packaging - Ford Motor Company
03.2018 - 08.2018
Team Leader - Material Flow and Packaging - Ford Motor Company
11.2013 - 02.2018
Team Member - Warehouse Operation - Ford Motor Company
05.2011 - 10.2013
Sun Polytechnic College - High School Diploma,
St. Antony’s Higher Secondary School, - SSLC State Board,
Sahaya Milton Johnrose