Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Saisuhas Kolli

Hyderabad

Summary

Dynamic Project Manager with 7+ years of experience leading multimillion-dollar engineering and automation initiatives in GMP-regulated manufacturing environments. Proven ability to reduce downtime and drive ROI through data-driven process improvements. Skilled in CMMS/BMS system deployment, cross-functional leadership, and ensuring FDA and cGMP compliance. Adept at managing CapEx and OpEx budgets, implementing preventive maintenance strategies, and enhancing operational efficiency. MBA-qualified and Lean Six Sigma certified—delivering scalable, cost-effective solutions to complex challenges.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Senior Project Manager

Thermo Fisher Scientific
Boston, MA
04.2023 - 03.2025
  • Oversaw BMS infrastructure upgrades, decreasing system downtime by 32% while achieving full regulatory compliance.
  • Spearheaded automation initiatives that enhanced system reliability and saved approximately $1M annually.
  • Initiated preventive maintenance and calibration programs, effectively reducing audit risks and unexpected outages.
  • Streamlined budget strategies, resulting in marked cost savings that aligned with strategic objectives.
  • Cultivated cross-functional collaboration among engineering, QA, and operations teams for process enhancements.
  • Managed CapEx and OpEx planning for facilities to boost project delivery timelines and resource allocation.
  • Directed expansion of warehouse space from 180,000 sq ft to 260,000 sq ft to accommodate growth.
  • Liaised between senior management, project team members and clients to ensure effective communication throughout the duration of the project.
  • Implemented robust calibration programs to ensure adherence to quality standards across operations.

Plant Engineer

Moderna
Norwood, MA
09.2021 - 03.2023
  • Executed GMP-compliant clean utilities projects worth over $10M, ensuring continuous production support.
  • Created installation protocols and directed FAT/SAT testing to expedite project timelines.
  • Established preventive maintenance plans, reducing equipment downtime and increasing productivity by 41%.
  • Oversaw complex change control during shutdowns, facilitating smooth transitions and minimizing risks.
  • Contributed to readiness planning for a new manufacturing facility, achieving on-time startup valued at over $45M.
  • Verified engineering drawings for design document accuracy and completeness.
  • Analyzed data from computerized maintenance systems to monitor machine performance trends.
  • Reviewed production processes to improve efficiency, cut costs, and eliminate waste.

Manufacturing Engineer

Yapp Automotive
Nashville, TN
07.2020 - 09.2021
  • Achieved over 85% Overall Equipment Effectiveness by optimizing production line processes.
  • Redesigned workflows, reducing cycle times by 18% and increasing throughput.
  • Enhanced facility layout, decreasing handling time by 20% and improving operator efficiency.
  • Drove lean initiatives, cutting production lead times by 15% and saving $50,000 annually.
  • Participated in cross-functional teams to develop solutions that reduced costs and improved quality.
  • Implemented Lean Manufacturing techniques like 5S, Kaizen events, and Kanban systems for better flow.
  • Trained personnel on effective use of machines and tools in manufacturing processes.
  • Monitored safety protocols to ensure compliance with OSHA regulations.

Manufacturing Engineer

IET Inc.
Toledo, OH
07.2019 - 02.2020
  • Led root cause failure analyses (RCFA), enhancing asset availability and addressing recurring failures.
  • Implemented inventory optimization strategies, yielding monthly savings of $75,000 by minimizing waste.
  • Performed detailed analyses of production data to identify inefficiencies, increasing productivity by 36%.
  • Conducted time studies to analyze labor costs per product line, identifying annual savings of approximately $5 million.
  • Developed comprehensive asset reliability programs that reduced downtime events and improved system uptime.
  • Executed root cause analyses on various production issues, leading to a reduction in machine downtime by roughly 33%.
  • Established thorough documentation for all processes, ensuring clarity with Standard Operating Procedures (SOPs).

Education

MBA – Master of Business Administration -

University of The Cumberlands
08-2025

MS - Project Management

University of The Cumberlands
12-2023

MS - Industrial Engineering

Wayne State University
05-2019

B.Tech - Mechatronics Engineering

SRM University
05-2017

Skills

  • Project and program management
  • Cross-functional leadership
  • Budgeting and cost reduction
  • Risk management
  • Capital and operational planning
  • Regulatory compliance
  • Team leadership
  • Scope management
  • KPI tracking
  • Project planning

Certification

  • Lean Six Sigma Green Belt
  • Production Part Approval Process (PPAP) Training
  • Quality Engineering Certification
  • World Class Manufacturing (WCM) Certification

Timeline

Senior Project Manager

Thermo Fisher Scientific
04.2023 - 03.2025

Plant Engineer

Moderna
09.2021 - 03.2023

Manufacturing Engineer

Yapp Automotive
07.2020 - 09.2021

Manufacturing Engineer

IET Inc.
07.2019 - 02.2020

MBA – Master of Business Administration -

University of The Cumberlands

MS - Project Management

University of The Cumberlands

MS - Industrial Engineering

Wayne State University

B.Tech - Mechatronics Engineering

SRM University
Saisuhas Kolli