Summary
Overview
Work History
Education
Skills
Certification
Work Availability
Timeline
Generic

Saisuhas Kolli

Hyderabad

Summary

Dynamic Project Manager with 7+ years of experience leading multimillion-dollar engineering and automation initiatives in GMP-regulated manufacturing environments. Proven ability to reduce downtime by 20% and drive ROI through data-driven process improvements. Skilled in CMMS/BMS system deployment, cross-functional leadership, and ensuring FDA and cGMP compliance. Adept at managing CapEx and OpEx budgets, implementing preventive maintenance strategies, and enhancing operational efficiency. MBA-qualified and Lean Six Sigma certified—delivering scalable, cost-effective solutions to complex challenges.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Senior Project Manager

Thermo Fisher Scientific
04.2023 - 03.2025
  • Directed BMS infrastructure upgrades, achieving a 32% reduction in system downtime and ensuring full compliance with regulatory standards.
  • Spearheaded automation initiatives that improved reliability and reduced manual intervention across core systems which resulted in savings around $1M annually.
  • Launched and standardized preventive maintenance and calibration programs aligned with cGMP, minimizing audit risks and unplanned outages.
  • Streamlined budget allocation strategies, yielding measurable cost savings and aligning expenditures with strategic business goals.
  • Led cross-functional collaboration with engineering, QA, and operations teams to drive continuous improvement initiatives.
  • Oversaw CapEx and OpEx planning for facility projects, improving project delivery timelines and resource efficiency..
  • Managed budgets exceeding $10 million while effectively controlling costs through diligent financial oversight.
  • Led warehouse expansion projects which resulted in increasing the sq footage of the facility from 160,000 sq ft to 280,000 sq ft.
  • Directed changes to project scope and cost and implemented appropriate change management processes to keep project on track.

Plant Engineer

Moderna
09.2021 - 03.2023
  • Delivered GMP-compliant clean utilities projects, ensuring uninterrupted support for production operations.
  • Developed installation protocols and led FAT/SAT testing, expediting project commissioning and minimizing delays.
  • Implemented robust preventive maintenance strategies, resulting in decreased equipment downtime and enhanced productivity.
  • Managed complex change control initiatives during shutdowns, facilitating seamless transitions and mitigating risk.
  • Played a critical role in operational readiness planning for a new manufacturing facility, enabling on-time startup and audit preparedness.
  • Assisted in procurement strategies by providing input on vendor selection based on cost analysis and performance metrics.
  • Served as point of contact during plant emergencies, overseeing disaster recovery and expediting restoration efforts.

Manufacturing Engineer

Yapp Automotive
07.2020 - 09.2021
  • Achieved 85%+ Overall Equipment Effectiveness (OEE) by optimizing production line processes and conducting root cause analysis.
  • Redesigned workflows and improved process flows, reducing cycle times by 18% and boosting throughput.
  • Enhanced facility layout to decrease handling time by 20%, improving material flow and operator efficiency.
  • Drove lean initiatives that cut production lead times by 15% and saved $50,000 annually in operational costs.
  • Developed technical documentation, including standard operating procedures, work instructions, and engineering drawings to support manufacturing operations.
  • Improved manufacturing efficiency by streamlining production processes and implementing lean methodologies.

Manufacturing Engineer

IET Inc.
07.2019 - 02.2020
  • Developed asset reliability programs, reducing downtime events and increasing system uptime.
  • Implemented inventory optimization measures, saving $75,000 monthly through reduced carrying costs and waste.
  • Led root cause failure analyses (RCFA) and corrective actions that improved asset availability and reduced recurring issues.
  • Reduced production downtime through proactive maintenance scheduling and timely equipment repairs.
  • Increased capacity utilization by identifying bottlenecks within the production process and implementing targeted improvements.
  • Optimized assembly line layouts to maximize productivity and improve overall workflow efficiency.

Education

MBA – Master of Business Administration -

University of The Cumberlands
08-2025

MS - Project Management

University of The Cumberlands
12-2023

MS - Industrial Engineering

Wayne State University
07-2019

B.Tech - Mechatronics Engineering

SRM University
05-2017

Skills

  • Project & Program Management (Agile, Waterfall)
  • Cross-Functional Leadership & Vendor Management
  • Budgeting, Cost Reduction & Risk Management
  • CapEx & OpEx Planning
  • Regulatory Compliance (GMP, cGMP)
  • CMMS: Maximo, Blue Mountain
  • Project Tools: Smartsheet, MS Project
  • Software: AutoCAD, Trackwise, VEEVA, MS Office
  • Project planning
  • KPI tracking
  • Scope management
  • Client relationship management

Certification

  • Lean Six Sigma Green Belt
  • Production Part Approval Process (PPAP) Training
  • Quality Engineering Certification
  • World Class Manufacturing (WCM) Certification

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Senior Project Manager

Thermo Fisher Scientific
04.2023 - 03.2025

Plant Engineer

Moderna
09.2021 - 03.2023

Manufacturing Engineer

Yapp Automotive
07.2020 - 09.2021

Manufacturing Engineer

IET Inc.
07.2019 - 02.2020

MBA – Master of Business Administration -

University of The Cumberlands

MS - Project Management

University of The Cumberlands

MS - Industrial Engineering

Wayne State University

B.Tech - Mechatronics Engineering

SRM University
Saisuhas Kolli